The document outlines requirements for project meetings during construction, including a reconstruction meeting and regular progress meetings. It states that a reconstruction meeting should be held as soon as possible after contract award between key parties to discuss coordination. Progress meetings must be held weekly to coordinate construction progress, with representatives from the contractor, subcontractors, client, and engineer required to attend. An agenda is to be prepared and meeting minutes distributed after each progress meeting.
The document outlines requirements for project meetings during construction, including a reconstruction meeting and regular progress meetings. It states that a reconstruction meeting should be held as soon as possible after contract award between key parties to discuss coordination. Progress meetings must be held weekly to coordinate construction progress, with representatives from the contractor, subcontractors, client, and engineer required to attend. An agenda is to be prepared and meeting minutes distributed after each progress meeting.
The document outlines requirements for project meetings during construction, including a reconstruction meeting and regular progress meetings. It states that a reconstruction meeting should be held as soon as possible after contract award between key parties to discuss coordination. Progress meetings must be held weekly to coordinate construction progress, with representatives from the contractor, subcontractors, client, and engineer required to attend. An agenda is to be prepared and meeting minutes distributed after each progress meeting.
A. As soon as possible after award of Contract, the Contractor shall arrange a meeting between the Engineers designated by the Client, major Sub-contractors, project superintendents, inspection and testing company representatives, and representatives of others whose coordination is required during construction. B. Discuss at the meeting the means by which full cooperation and coordination of the participants during construction can be achieved. C. Document the responsibilities and necessary activities of the participants during construction as discussed, and distribute documentation to each participants.
1.02 PROJECT PROGRESS MEETING
A. Hold site meetings at regular intervals during construction in order to coordinate progress of the works. Establish meeting schedule with Engineer at the beginning of construction. Meetings shall be scheduled regularly on a weekly basis and shall fall at the same time of each week in which they are scheduled. B. Ensure that responsible representatives, from offices and site forces, of Contractor and Subcontractors attend. Client and Engineer will also attend in their own interests. C. Inform designated personnel whose attendance is required of date of each meeting, in sufficient time to enable them to arrange for their presence. D. Prepare an agenda for each meeting and make available, to all those concerned, information required for the resolution of problems to be discussed. E. The Client will chair meetings and the Engineer will record minutes of each meeting, distribute copies of minutes in duplicate to each person invited to the next meeting before it is called.
PART - 2 PRODUCTS NOT USED
PART - 3 EXECUTION NOT USED
END OF SECTION