The document provides technical specifications for painting and installing stoppers for a high speed rail project between Mumbai and Ahmedabad. It outlines that painting of steel box stoppers must conform to IRS: B1-2001 standards and be done according to an approved method statement detailing materials and processes. Stoppers must be installed according to drawings and an approved method statement, ensuring proper distance, level, spacing, direction and other details. Installation position will be surveyed and marked, with the movable side clearance set to allow for thermal expansion/contraction, creep and shrinkage of the girder. Stoppers are installed either before or after girder launching, with precautions taken to support and secure the stoppers.
The document provides technical specifications for painting and installing stoppers for a high speed rail project between Mumbai and Ahmedabad. It outlines that painting of steel box stoppers must conform to IRS: B1-2001 standards and be done according to an approved method statement detailing materials and processes. Stoppers must be installed according to drawings and an approved method statement, ensuring proper distance, level, spacing, direction and other details. Installation position will be surveyed and marked, with the movable side clearance set to allow for thermal expansion/contraction, creep and shrinkage of the girder. Stoppers are installed either before or after girder launching, with precautions taken to support and secure the stoppers.
The document provides technical specifications for painting and installing stoppers for a high speed rail project between Mumbai and Ahmedabad. It outlines that painting of steel box stoppers must conform to IRS: B1-2001 standards and be done according to an approved method statement detailing materials and processes. Stoppers must be installed according to drawings and an approved method statement, ensuring proper distance, level, spacing, direction and other details. Installation position will be surveyed and marked, with the movable side clearance set to allow for thermal expansion/contraction, creep and shrinkage of the girder. Stoppers are installed either before or after girder launching, with precautions taken to support and secure the stoppers.
a) The painting works of steel box stopper shall conform to IRS: B1-2001 (CL. 39.2.1). b) The Contractor shall do the painting works as per the approved Method Statement, having details of paint material, general items for painting works, quality management, curing and work sequence Installation of Stoppers a) Stoppers shall be installed as per the approved Method Statement and as specified in the drawings. b) The installation position of the stoppers shall be surveyed by the Contractor as to the distance from track centre, installation level, centre spacing for longitudinal and transverse directions, installation direction, inclination and any other details that may be required by the Engineer or the Contractor. Installation position as surveyed above, shall be marked at site. Installation position of movable side shall be determined to secure the predetermined movable clearance considering expansion and contraction caused by temperature variation, creep and drying shrinkage of the girder. c) Unless otherwise indicated in the drawing, installation of stoppers is as follows. Installation before launching the girder (e.g. cantilever or span-by-span erection) i. Installation position, level, direction and verticality of stopper shall be checked prior to installation of stopper. Movable direction shall be checked whether it corresponds to expansion and contraction direction. ii. Recess of substructure in which stopper is to be installed shall be cleaned prior to the installation of stopper. iii. After stopper is supported temporarily, a recess of substructure shall be filled with non-shrink grout. iv. Temporarily fixing device of stopper shall be able to support until the compressive strength of non-shrink grout attains 8 MPa or more. Installation after launching the girder (e.g. erection by jack pushing): In this case, stopper is installed from the outside of girder by providing temporary opening in the top slab of girder. i. Installation of stopper shall comply with item (c)(1), above. ii. If the girder is launched with the stopper being hung inside, measures to prevent falling off the stopper shall be taken. Stopper shall not be damaged
Project For Construction of Mumbai-Ahmedabad High Speed Rail Bidding Documents Part 2 Package No. MAHSR-C-7 Section VI-3 Requirements (Technical Specifications)