Shutdown Job
Shutdown Job
7 0 am to 7 .0 pm 2 2 1
7.0 pm to 7.0 am 2 2 1
Following items are required for coming shutdown
14 FATTA 50 nos.
SR NO LOCATION
1 PH FAN INLET
CY I to CY V
2
3 PRE CALCINER
4 KILN RISER
CVF
5
6 TAD
NATURE OF WORK
Damper position of of PH fan to be checked
* Damper to be changed .
* Feed pipe of settling chamber to be checked
BRICKS SHIFTING
LOCATION
ITEM NO III rd FLOOR IV th FLOOR
1 1000 1500
2 800 1000
7 200 400
8 50 50
CASTABLE SHIFTING
LC 60 30 bags