Document Transmittal Advice: Mr. Firman and Mr. Nataniel Christiadi Fendy JP (PT. Darma Henwa)

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Document Transmittal Advice

DTA Ref No: BCP- 003

Attention: Mr. Firman and Mr. Nataniel Date:


Christiadi
Company: PT Kaltim Prima Coal From: Fendy JP (PT. Darma Henwa)
Address: M2 Building, Mine Site, Sangatta 75611 Position: Pit B CH22 Bengalon Coal Project
PO.BOX 620 Balikpapan 76106
East Kalimantan, Indonesia

This document supersedes a previous document: Yes / No

Treatment of superseded documents: Please Return / Destroy / Retain and Mark as Superseded

Item Qty. Description of Document Doc No. Rev. ID Copy


No. No.
-
Change Management (CM) jalur lalu lintas di main
1. 1 Set
workshop CH 22 ABLR Pit B
2.
3.
4.
5.
6.

Issued For: Approval / Comment / Q.A / Information / Construction / Other __________________

Controlled by PT DH / Uncontrolled

Comments:

Acknowledgement of Receipt

Please return a copy of this form to the sender immediately:

Received Position: Signed: Date:

The superseded copies of the document are: Returned / Destroyed / Retained and Marked as Superseded

Note: This form is based on an auto-numbered triplicate form. When using this version, the original document is maintained
by PT DH, a copy is given to the recipient who returns a copy acknowledging receipt (if required). All transmittals are
numbered and the numbers recorded on a register.

Prepared By: Systems Manager Date: Document FM-QA-030


Number:
Approved By: Quality Manager Date: Date
Implemented:
Electronic File & /conversion/tmp/scratch/507701981.doc Page 1 of 1
Path:

You might also like