QUALITY DESIGN AND CONSTRUCTION PVT.

LTD
Materials Rajkumar

QUANT RATE (NPR) AMOUNT


S.N. DESCRIPTION UNIT REMARKS
ITY In Figures (NRs)
QUALITY DESIGN AND CONSTRUCTION PVT. LTD
Materials Rajkumar

RATE (NPR)
Date DESCRIPTION UNIT QUANTITY AMOUNT (NRs)
In Figures
12/20 Sand Plaster Trip 1 8500
11/16 Sand Plaster Trip 1 8500
11/26 Sand Plaster Trip 1 8500
12/6 Sand Plaster Trip 1 8500
12/27 Chips Trip 1 7500
1/9 Sand Plaster Trip 0.5 8500
1/14 Mato Transffer Trip 1 1500
1/16 Mato Transffer Trip 1 1500
1/17 Sand Plaster Trip 0.5 8500
1/17 Mato Transffer Trip 1 1500

`
REMARKS
8000
8000
8000
8000

4200

4200
QUALITY DESIGN AND CONSTRUCTION PVT. LTD
Materials Rajkumar

QUANT RATE (NPR)


Date DESCRIPTION UNIT AMOUNT (NRs) REMARKS
ITY In Figures
12/11 Roda Trip 1 8000 7700
12/11 Sand Trip 1 8500
12/14 Roda (100cft) Trip 1 10000
12/14 Sand(100cft) Trip 1 10500
12/15 Roda Trip 1 8000 7700
12/15 Sand(100cft) Trip 1 10500
QUALITY DESIGN AND CONSTRUCTION PVT. LTD
Materials Rajkumar

RATE (NPR)
Date DESCRIPTION UNIT QUANTITY AMOUNT (NRs) REMARKS
In Figures
10/3 Old Remaining 38700 38700
10/14 Sand Trip 1 8500 8000
11/3 Roda Trip 1 7700 8000
11/3 Sand Trip 1 8500 8000
11/7 Roda (140cft) Trip 1 13000 8000
11/11 Sand (100Cft) Trip 1 10500 8000
11/15 Sand Trip 1 8500 8000
11/25 Sand Trip 4 8500 8000
11/25 Roda Trip 3 7700 8000
11/26 Roda Trip 0.5 7700 8000
Plaster
12/6 Sand Trip 1 8500 8000
12/8 Sand Trip 1 8500 8000
12/13 Sand Trip 1 8500 8000
12/19 Sand Trip 1 8500 8000
12/21 Chips (140 Cft) Trip 1 12500 8000
12/23 Sand (Wall) Trip 1 8500 8000
12/23 Sand Trip 1 8500 8000
12/29 Sand Trip 1 8500 8000
1/4 Sand Trip 1 8500 8000
1/8 Sand Trip 2 8500 8000
1/15 Sand Trip 1 8500 8000
1/19 Sand Trip 1 8500 8000
1/22 Sand Trip 1 8500 8000
1/26 Sand Trip 1 8500 8000
2/1 Sand Trip 1 8500 8000
2/5 Sand Trip 1 8500 8000
2/11 Sand Trip 1 8500 8000
2/11 Chips (100 Cft) Trip 1 8500 8000
2/12 Sand Trip 0.5 8500 8000
2/17 Sand Trip 1 8500 8000
2/20 Etta PCs 1000 15 8000
278700
QUALITY DESIGN AND CONSTRUCTION PVT. LTD
Materials Rajkumar

RATE (NPR)
Date DESCRIPTION UNIT QUANTITY AMOUNT (NRs) REMARKS
In Figures
Sand Trip 0.5 8000 4000
Sand (Marble) Trip 1 8500 8500
Sand Plaster Trip 0.5 8000 4000
Sand (Marble) Trip 0.5 8500 4250
Sand (Marble) Trip 1 8500 8500
Sand (Marble) Trip 0.5 8500 4250
Sand Trip 0.5 8500 4250
chips Trip 0.5 8000 4000
41750
160000
201750
135000

66750