(Name of Project) Nominated Subcontract Piling Works Section 2.2: Test Piles Section 2.2: Test Piles
(Name of Project) Nominated Subcontract Piling Works Section 2.2: Test Piles Section 2.2: Test Piles
2: TEST PILES
[NAME OF PROJECT]
NOMINATED SUBCONTRACT
PILING WORKS
SECTION 2.2: TEST PILES
TEST PILES
NOTES
The General Notes contained in Section 2.1 shall apply to this Section
note
2.2.
The Subcontractor shall refer to the Specification and Drawings for all
details related to this Section of the Works and he is to include all
items that he considers necessary for completion of the Works and note
complying with all the requirements contained therein, whether or not
they are specifically mentioned in this Bill of Quantities.
Standing time for all plant, equipment and labor in excess three hours
F (the initial three hours shall be at the Subcontractor own cost) due to hr
suspension works given in writing by the Engineer
Bore vertical pile hole through whatever soil strata other than
continuous solid rock as described including all drilling and coring,
installation and extraction of temporary steel casings and linings:-
REINFORCEMENT (PROVISIONAL)
Provide, fabricating and placing of high yield steel bar reinforcement
cage as described:-
E 1,000mm Diameter bored pile Kg
F 1,200mm Diameter bored pile Kg
G 1,500mm Diameter bored pile Kg
CUTTING OF PILES (PROVISIONAL)
Carry out the Static Load Test on Working bored pile to 1.5 times its
working load or structural capacity as per Engineer's Drawing DWG
NO: _________________ as described including mobilization and
demobilization of plant, equipment, loads, devices, steel beams, jack,
and supporting blocks., etc. The price shall include all supply and
construction of temporary pile cap, test records and reports, cut and
trim the temporary pile cap, and remove all the disposal materials off
site on the completion of the work.
Carry out the Instrumented Ultimate Test on Working bored pile to 2.5
times its working load or structural capacity as per Engineer's Drawing
DWG NO: _________ as described including mobilization and
demobilization of plant, equipment, loads, devices, steel beams, jack,
and supporting blocks., etc. The price shall include all supply and
construction of temporary pile cap, test records and reports, cut and
trim the temporary pile cap, and remove all the disposal materials off
site on the completion of the work.
COLLECTION:
Total
Total Rate
Amount
(US$)
(US$)
Total
Total Rate
Amount
(US$)
(US$)
Total
Total
Amount
Rate (US$)
(US$)
Total
Total
Amount
Rate (US$)
(US$)
Total
Total
Amount
Rate (US$)
(US$)
Total
Total
Amount
Rate (US$)
(US$)