SECTION 2.

2: TEST PILES
[NAME OF PROJECT]
NOMINATED SUBCONTRACT
PILING WORKS
SECTION 2.2: TEST PILES

 Ref.  Description  Unit  Qty

TEST PILES
NOTES
The General Notes contained in Section 2.1 shall apply to this Section
 note
2.2.

The Subcontractor shall refer to the Specification and Drawings for all
details related to this Section of the Works and he is to include all
items that he considers necessary for completion of the Works and  note
complying with all the requirements contained therein, whether or not
they are specifically mentioned in this Bill of Quantities.

MOBILIZATION AND DEMOBILIZATION

Allow for provision and mobilization of all necessary piling equipment,


plant and tools, and for their transportation to the Site, handling and
 A  Item
assembling, moving from pile  to pile round the Site including all
necessary associated works.

Allow for demobilization and dismantling of all necessary piling


equipment plant, and tools, and for their transportation from the Site
 B  Item
on the completion of the Works including all necessary associated
works

Allow for providing a working platform of suitable size, strength and


 C Item
stability to permit operation of the boring plant,etc.

The Subcontractor is to make his own assessment of the existing


ground conditions and allow for the provision of any temporary works
 D  Item
that may be required to permit access and operation of piling plant and
equipment on the site.

Allow for clearing the site of vegetation as required to undertake the


 E  Item
works.

Standing time for all plant, equipment and labor in excess three hours
 F (the initial three hours shall be at the Subcontractor own cost) due to  hr
suspension works given in writing by the Engineer

SECT 2.2/1                            to Collection

  Ref.  Description  Unit   Qty


  Ref.  Description  Unit   Qty

TEST PILES (CONT'D)


BORING (PROVISIONAL)

Bore vertical pile hole through whatever soil strata other than
continuous solid rock as described including all drilling and coring,
installation and extraction of temporary steel casings and linings:-

 A      1,000mm Diameter bored pile  m


     Extra over for coring through rocks in   
 B  m
     whatever depth as described

 C      1,200mm Diameter bored pile  m


     Extra over for coring through rocks in   
 D  m
     whatever depth as described

E      1,500mm Diameter bored pile m


     Extra over for coring through rocks in   
F  m
     whatever depth as described

ALLOW FOR BENTONITE SLURRY (PROVISIONAL)


Allow for bentonite slurry to bore holes (allowed to full depth of bore).
 G       to all borepiles  m3

DISPOSAL OF EXCAVATED SPOIL (PROVISIONAL)


Remove excavated spoil from the site and dispose of in a legal tip
(measured nett - no allowance for bulking).
 H       to all borepiles  m3

SECT 2.2/2                            to Collection

   Ref. Description   Unit   Qty

TEST PILES (CONT'D)


FILLING (PROVISIONAL)
Back fill bored holes with selected materials
 A       to all borepiles  m3

REINFORCED CONCRETE (PROVISIONAL)


Vibrated reinforced dry or tremie concrete Grade C35/45 as
described:-
 B      1,000mm Diameter bored pile  m3
 C      1,200mm Diameter bored pile  m3
 D      1,500mm Diameter bored pile  m3

REINFORCEMENT (PROVISIONAL)
Provide, fabricating and placing of high yield steel bar reinforcement
cage as described:-
 E      1,000mm Diameter bored pile  Kg
 F      1,200mm Diameter bored pile  Kg
G      1,500mm Diameter bored pile   Kg
CUTTING OF PILES (PROVISIONAL)

Cut and trim reinforced concrete cast-in-situ bored piles at required


cut-off levels and dispose surplus length off site including all
necessary excavation to exposed steel bar reinforcement and
cleaning, straightening and bending projecting high yield steel bar
reinforcement to bond into reinforced concrete pile cap.

H      1,000mm Diameter bored pile  no


 I      1,200mm Diameter bored pile  no
 J      1,500mm Diameter bored pile    no

SECT 2.2/3                            to Collection

    Ref. Description    Unit    Qty

TEST PILES (CONT'D)


TESTING WORKS (PROVISIONAL)
STATIC LOAD TEST

Carry out the Static Load Test on Working bored pile to 1.5 times its
working load or structural capacity as per Engineer's Drawing DWG
NO: _________________ as described including mobilization and
demobilization of plant, equipment, loads, devices, steel beams, jack,
and supporting blocks., etc. The price shall include all supply and
construction of temporary pile cap, test records and reports, cut and
trim the temporary pile cap, and remove all the disposal materials off
site on the completion of the work.

 A      1,200mm Diameter bored pile  Ton


 B      1,500mm Diameter bored pile      Ton

INSTRUMENTED ULTIMATE TEST

Carry out the Instrumented Ultimate Test on Working bored pile to 2.5
times its working load or structural capacity as per Engineer's Drawing
DWG NO: _________ as described including mobilization and
demobilization of plant, equipment, loads, devices, steel beams, jack,
and supporting blocks., etc. The price shall include all supply and
construction of temporary pile cap, test records and reports, cut and
trim the temporary pile cap, and remove all the disposal materials off
site on the completion of the work. 

 C      1,500mm Diameter bored pile       Ton

SECT 2.2/4                            to Collection

    Ref. Description    Unit    Qty

TEST PILES (CONT'D)


ADDITIONAL ITEMS
(To be inserted by the Subcontractor)
Subcontractor to enter any works which he feel not specify in any part
of the Bills of Quantities which necessary for him for execution and
completion of the works under the Subcontract based on Subcontract
Specification and Drawings.
 i)..............................
 ii).............................
 iii)............................

SECT 2.2/5                            to Collection

     Ref.  Description    Unit     Qty

COLLECTION:

                              Page SECT 2.2/1


                              Page SECT 2.2/2
                              Page SECT 2.2/3
                              Page SECT 2.2/4
                              Page SECT 2.2/5
SECT 2.2/6                    to Final summary
 Total
Total Rate
Amount
(US$)
(US$)

 Total
 Total Rate
Amount
(US$)
(US$)
 Total
 Total Rate
Amount
(US$)
(US$)

  Total
  Total
Amount
Rate (US$)
(US$)
  Total
   Total
Amount
Rate (US$)
(US$)

   Total
   Total
Amount
Rate (US$)
(US$)
    Total
    Total
Amount
Rate (US$)
(US$)