Failures in Construction Types and Causes and Its Assessment
Failures in Construction Types and Causes and Its Assessment
Abstract : Failures produce economic and defined under three types which would be failure
temporal deviations in construction industry. during construction, failure due to failure of
Failures in buildings are the defects , reduced services and failure, due to improper maintenance,
serviceability or an unreached goal. this research and design failure. Construction failures would
looks at the failure modes that caused latent defects include all those failures caused to the assets at the
and immediate defects .defects are categorized time of construction or defects occurred in it over a
according to their causes .it analyses the areas and period of time. The main reason behind this is that
elements in which defects were detected. studies information related to failures and there causes are
confirm that there are three major categories in kept confidential from the fear of embarrassment
which defects can be classified i.e Controllable and legal issues. The best way to tackle these
failures, uncontrollable failures and design failures is to fight it by facing them gravely
failures. Honeycombing of columns, beams, cracks identifying the causes for this and to determine the
in walls, water leakage are common failures. preventive measures to prevent those failures from
waterlogging, visible sunk slab, under occurring in future. The management of
reinforcement are design failures. Defects in construction projects requires knowledge of
brickwork, structure, tiles, plumbing, painting add modern management as well as understanding of
to the failures in building. Weather impact, load the design and the construction process.
impact, corruption, lack of supervision, deficient Construction projects have a specific set of
materials, unskilled manpower are major sources objectives and constraints such as a required time
or causes of failures. This paper confirms the need frame for completion. Also they are a costly
to look at defects in another way and establish undertaking so many people, in an effort to reduce
more effective methods to reduce latent as well as the cost, become penny wise and pound-foolish.
immediate defects. Change is inherent in construction work. The
Keywords- Defects, failures, deficiencies, majority of the projects fail to meet deadlines, cost
maintenance. and quality targets. This is not too surprising
considering that there are not known perfect
engineers, anymore than there are perfect designs
I. Introduction or that the forces of nature behave in a perfectly
predictable way. Change cannot be eliminated, but
The field of engineering mainly comprises of by applying the principles of risk management,
investigating the solutions for avoiding the failures engineers are able to improve the effective
which the mankind comes across. In it we identify management of this change. In construction
the principle causes for the failure along with the projects, each of the three primary targets of Cost,
other causes which complement the principle Time and Performance are likely to be subject to
causes along with their respective remedial risk and uncertainty. Many people, in order to
measures and precautions to be taken prior the make change in the project with minimum cost, get
failure. There is now a need to understand the the project into trouble. The lack of risk
various situations or conditions whose existence management, even an insufficient risk analysis, can
gave rise to such failures. This job is very put construction projects in jeopardy.
important to be done in order to reduce the
consequences caused by such failures. In this 1.1 Definition of ‘failure’
research the various failures were studied along Failure of Civil Engineering Structures could mean
with live case studies to determine their causes for several Things It could be a catastrophic failure or
different types of failure. Failure can be broadly collapse, It could be a loss in functionality or it
could mean a degradation in the serviceability of information is available concerning the use of risk
the building to a level that would be uneconomic to management as a tool within the organization. To
maintain. evaluate attitude and skills in risk management, a
comprehensive multiple choice questionnaire
The Technical Council on Forensic Engineering of survey was adopted for this survey. It is obvious
the American Society of Civil Engineers has that it needs documentarily updates. Risk
defined a construction failure as ―an unacceptable management is brought on a higher level of
difference between expected and observed importance for the project as compared classical
performance. Thus construction failures would methods of risk management as it becomes a
include all those failures caused to the assets at the common tool for both project team and project
time of construction or which have collapsed post organization , it becomes an organization
construction prior to the end of their design life. philosophy and strategy.
formwork failure.