RACI MODEL

Tasks Roles Per Team Members


Sukhpreet Raghav Piplani Akshay Amandeep Afridh
Singh (Construction/ Kumar Kaur Amakundan
(Project Installation) (Planning) (Testing) (Designing/
Manager/ Maintenance)
Construction)
Project plan A C R I I
Budgeting A C R I I
Location selection A C R I I
Approval A C R I I
Fixed Dome design A C I I R
requirements
Underground Tanks A C I I R
design
Sensor’s Location A C I I R
Plant Layout A C I I R
Engineering A/C R I I I
Drawings
Construction A/C R I I I
Materials
Foundation work A/C R I I I
Raw waste storage A/C R I I I
area
Slurry Tanks A/C R I I I
Mixing Tanks A/C R I I I
Organic Fertilizer A/C R I I I
Storage Area
Skilled Labor A/R C I I I
Inspection of A/R C I I I
materials
Water Intake works A/R C I I I
Pre-Treatment unit A/R C I I I
Waste-water A/R C I I I
Treatment unit
Piping and Valves A R I I I/C
Sensors A R I I I/C
Biogas storage and A R I I I/C
pumping
Slurry Disposal A R I I I/C
Electrical controls A R I I I/C
Test Equipment A I C R I
Trail run results A I C R I
Feedback A I C R I
Periodic inspection A I I I R
of the plant
Safety Measures A I I I R
Emergency A I I I R
Protocols
Cleaning Services A I I I R
Waste Disposal A I I I R