Norms For Rate Analysis: Activity Group:-9: Earthworks
Norms For Rate Analysis: Activity Group:-9: Earthworks
9-1
Norms for Rate Analysis
Activity Group:- 9 : Earthworks
Spec. Resources
Activity No Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
9.02 905 Earth work excavation for drain and Add 3% of
trenches including shoring, struting,
Labour cost
bracing, sheeting and disposal upto 10m
and lift upto 1.5 m etc. all complete as per
specification. m3
a) Soft soil Unskilled md 0.90
b)Hard soil/Gravels/B.M.S. Unskilled md 1.50
c) Soft Rock Unskilled md 3.00
d) Hard Rock
i) without blasting Unskilled md 16.00
ii) with blasting
I) Manual drilling Unskilled md 4.50 Gelatin kg 0.25
blaster md 0.12 Detonator no 2
fusewire m 2
II) Mechanical Drilling Unskilled md 1.75 Gelatin kg 0.25 Compressor &
blaster md 0.12 Detonator no 2 drill hr 0.4
fusewire m 2 or Portable Rock
drill hr 1.2
iii)Using chemicals
I) Manual drilling skilled md 0.12 Chemicals Kg 5
Unskilled md 5.00
II) Mechanical Drilling skilled md 0.15 Chemicals Kg 5 Compressor &
Unskilled md 2.00 drill hr 0.4
or Portable Rock
drill hr 1.2
9-2
Norms for Rate Analysis
Activity Group:- 9 : Earthworks
Spec. Resources
Activity No Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
9.03 905 Haulage of excavated material beyond 10 Add 3% of
m upto 50m.
3
a) Soil material m Unskilled md 0.27 for T & P
b) Rock material m3 Unskilled md 0.33
9.04 905 Vertical lift of excavated material above 1.5 Add 3% of
m for every additional meter. Labour cost
m3 for T & P
a) Soil material Unskilled md 0.12
b) Rock material Unskilled md 0.15
9.05 909 Formation of embankment including Add 3% of
compaction in layers not exceeding
150mm. Compacted depth, watering and
haulage 10m. etc. all complete as per
specification.
m3 Unskilled md 0.50 suitable material cu.m 1.1 Roller 8-10t hr 0.017 Labour cost
fuel lit. 0.08 for T & P
water lit. 100
Note : Add 10 % of the total rate ( except for transporation of material) for necessary testing as per specifications.
9-3
Norms for Rate Analysis
Activity Group:- 9 : Earthworks
Spec. Resources
Activity No Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
Excavation for foundation through all types
9.07.01 907
of soil including relevant lift and disposal
upto 20m.
m3
9-4
Norms for Rate Analysis
Activity Group:- 9 : Earthworks
Spec. Resources
Activity No Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
9.08 907 Dewatering during foundation excavation Adopt the following percentage of unit rate of foundation excavation depending on the soil type & ratio of water table height to foundation
and foundation works. depth.
9-5
Norms for Rate Analysis
Activity Group:- 9 : Earthworks
Spec. Resources
Activity No Clause Description of works Labour Materials Equipment Remarks
No. Unit
Type Unit Qty. Type Unit Qty. Type Unit Qty.
9.10 908 Back filling in layers in foundaion pits,
Add 3% of
trenches , etc, including compaction and
watering etc. complete, lead 10m. Labour cost
for T & P
3
m
a) Depth of foundation upto 1.5m unskilled md 1.14
b) Depth more than 1.5upto 3m suitable material excavated
unskilled md 1.62
for foundation to be used.
c) Depth more than 3m upto 4.5m unskilled md 2.1
d) Depth more than 4.5m upto 6m unskilled md 2.58
e) Depth more than 6m.
Increase by 30% for every additional meter depth of foundation over the rate for the previous depth.
Note : Add 5% of the total rate ( except for transporation of material) for necessary testing as per specifications.