CSF Ref, IDG/CSF/BS/D/D304/0013 Rev.-A
ICONTRACTOR’S DRAWING SUBMISSION MAIN CONTRACT
PROPOSED INDUSTRIAL DEVELOPMENT WORKS
AT LOT 313 AND TWIL 49 TSUEN WAN, N.T.
ome [Main Contract Works bays
eee eee eee |e D/DOOMO013A
CONTRACTOR |CR Construction Company Limited Tompnaeno. | page 1 of 2
‘We submit herewith the folowing drawing(s) to WPL for approval Lothers, please specify
review
Submission — Drawing Submission 20207108 —__( (VAM)
Name in block etter: Alex Ho (CRi/Joa Wond [ATAL ‘Company : CR Consirucion
Signature:
[SUBJECT. EL INSTALLATION — DRAWING SUBMISSION OF EARTHING SYSTEM LAYOUT - FOUNDATION FOR.
CLP
BRIEF DESCRIPTION:
‘We would like to submit herewith the Drawing Submission of Earthing System layout -
|Foundation for CLP for your comment and approval.
Submission fo WTPL by CR Construction Company Lined:
GE Goodman w__1_— sali) oferel. Taiorzed Representative —| Date Received by WIPL
SW wat eal feel Horis Wong
Sunand Pus_w sete) af ena. ge nBoe atr
ARUP) wat) of enc. Signature
‘hadas went) ot ena,
‘ARUP-LEED. weet) ofa,
ry wat) ot na, “A .
Re ww sat) a ona, ‘Subplision Date (VIM)
se wis ot
Ras Watts) of one, Th OCT 2020
ARCHITECT'S REPLY
TIALLIED CONSULTANT'S NAME twine opncaioy ‘Authorized Representative | Dale Recehed by WIPL
| amen Becket
Signature
‘COMMENTS:
Date WMD)
Citar ecg he ssn ao st)
GY REPLY BY WONG TUNG & PARTNERS LIMITED (WIP)
Easnw faut Compliare contract sper
Coreen Cocks auch bepulestionn
ea. Godan wf say ene | Authorized Representative —
hl
Santana Pius wae) of ere °
ARUP weet) ot ena, ee
ecas wat) ater Sess
ARUPLEED wi sat6) ot ena,
ma wet) ot ene, Date (AMD)
Re wot) ot one
se ate tere
mas wae) ree AboOve Arup & Partners HK Led
Level 5 Festival Walk
80 Tat Chee Avenve
Kowloon Tong
Kowloon, HK.
“Tol (852) 2528 3031
Fae (852) 2268 3975
DECISION SHEET
Page 1 of 1
No GTWW-BI-EL-Do01B
JobNo 270867
joeceine EL |
ate ___30/102020
By Email rnchan@ezcgl com hv)
CR Construction Company Limited
‘aun. Kirin Chan
Contact
Proposed Indusiial Development at LOT 313 and TWIL,
49 Tsuen Wan, NT.
| Form of Submission Contractor's Submission
ref no D/D3O4/0013A,
dated 9/10/2020
received on: 14/10/2020
‘Subject ‘tachment
Re: EL Installation - Drawing Submission of NA
Earthing System For CLPP (Foundation)
hem Ref. Description Decision Comment
DID3O4/0013A EL Installation ~
Drawing Submission of
Earthing System for
CLPP (Foundation)
a
No adverse comment
Decision "A= Accoplablo, 6 - Conditionally Aeseplable, C- Acceptance Pending - Resubmit, D-Not Acceplable
come:
[7 coat Ge not HGTUVGGodna cn)
Z| wee Chup El onan ovr.o0
Z| srw ace am tind)
Z| srw Ad aa ores ar)
Z| sew Aen rycen cm)
7 sss Cheap Ena 160120513 8s ca)
Z| rcs Crap El ots08 ced con
=
Af ) 7
=
ort) Amb
by email ~
ee Chi-Leong Tom;
{by email = 2PROPOSED INDUSTRIAL DEVELOPMENT
Main Contract Works.
couTRAcTOR
ICONTRACTOR’S DRAWING SUBMISSION
AT LOT 313 AND TWIL 49 TSUEN WAN, N.T.
R Construction Company Limited
MAIN CONTRACT
WORKS
D/D304/0013A
Tara Tage Do2
BREET INSTALLATION = DRAWING SUBMISSION OF Earhina System layou- Foundation FORCLP
Contractor's Submission ‘Consultants WrPL
Remarks
Draving rot Dai Te? aaa | ame Son
ther ref, etc, ‘other description, etc. é Comments {eee notes 1, 3end4_)
ote)
CLP-BLG1-EL-2301 | earthing ystom ayout- Foundation
1
l
Note 4
1 Approvod
2. Approved ae note, works to proceed & resubmit fo record
5. Disapproved and Resubna
Note2
State yee (9 in
Stato no (N) not
cemplance wth Contract Specfeation
i comptance
‘Tho situs insicates reviewed for compliance wth the design
Intent" Comments made shal apply to al simi conditions 8.
‘etl, notjst te one ee. Te approval shal nate corsied
‘as roving tho contractors blgatin for corpance wih the
Dpproval by the Architect shall not reve the contracts
‘bigaton fo ensure tall compliance of ther works wih Satlory
requremont,| aManenenea
ihrer
Augen |. ——_ Vv
Sao
ll 1 = — |
maces
| FOUNDATION PLAN Enid eystemavour