4

You might also like

Download as pdf
Download as pdf
You are on page 1of 4
CSF Ref, IDG/CSF/BS/D/D304/0013 Rev.-A ICONTRACTOR’S DRAWING SUBMISSION MAIN CONTRACT PROPOSED INDUSTRIAL DEVELOPMENT WORKS AT LOT 313 AND TWIL 49 TSUEN WAN, N.T. ome [Main Contract Works bays eee eee eee |e D/DOOMO013A CONTRACTOR |CR Construction Company Limited Tompnaeno. | page 1 of 2 ‘We submit herewith the folowing drawing(s) to WPL for approval Lothers, please specify review Submission — Drawing Submission 20207108 —__( (VAM) Name in block etter: Alex Ho (CRi/Joa Wond [ATAL ‘Company : CR Consirucion Signature: [SUBJECT. EL INSTALLATION — DRAWING SUBMISSION OF EARTHING SYSTEM LAYOUT - FOUNDATION FOR. CLP BRIEF DESCRIPTION: ‘We would like to submit herewith the Drawing Submission of Earthing System layout - |Foundation for CLP for your comment and approval. Submission fo WTPL by CR Construction Company Lined: GE Goodman w__1_— sali) oferel. Taiorzed Representative —| Date Received by WIPL SW wat eal feel Horis Wong Sunand Pus_w sete) af ena. ge nBoe atr ARUP) wat) of enc. Signature ‘hadas went) ot ena, ‘ARUP-LEED. weet) ofa, ry wat) ot na, “A . Re ww sat) a ona, ‘Subplision Date (VIM) se wis ot Ras Watts) of one, Th OCT 2020 ARCHITECT'S REPLY TIALLIED CONSULTANT'S NAME twine opncaioy ‘Authorized Representative | Dale Recehed by WIPL | amen Becket Signature ‘COMMENTS: Date WMD) Citar ecg he ssn ao st) GY REPLY BY WONG TUNG & PARTNERS LIMITED (WIP) Easnw faut Compliare contract sper Coreen Cocks auch bepulestionn ea. Godan wf say ene | Authorized Representative — hl Santana Pius wae) of ere ° ARUP weet) ot ena, ee ecas wat) ater Sess ARUPLEED wi sat6) ot ena, ma wet) ot ene, Date (AMD) Re wot) ot one se ate tere mas wae) ree Abo Ove Arup & Partners HK Led Level 5 Festival Walk 80 Tat Chee Avenve Kowloon Tong Kowloon, HK. “Tol (852) 2528 3031 Fae (852) 2268 3975 DECISION SHEET Page 1 of 1 No GTWW-BI-EL-Do01B JobNo 270867 joeceine EL | ate ___30/102020 By Email rnchan@ezcgl com hv) CR Construction Company Limited ‘aun. Kirin Chan Contact Proposed Indusiial Development at LOT 313 and TWIL, 49 Tsuen Wan, NT. | Form of Submission Contractor's Submission ref no D/D3O4/0013A, dated 9/10/2020 received on: 14/10/2020 ‘Subject ‘tachment Re: EL Installation - Drawing Submission of NA Earthing System For CLPP (Foundation) hem Ref. Description Decision Comment DID3O4/0013A EL Installation ~ Drawing Submission of Earthing System for CLPP (Foundation) a No adverse comment Decision "A= Accoplablo, 6 - Conditionally Aeseplable, C- Acceptance Pending - Resubmit, D-Not Acceplable come: [7 coat Ge not HGTUVGGodna cn) Z| wee Chup El onan ovr.o0 Z| srw ace am tind) Z| srw Ad aa ores ar) Z| sew Aen rycen cm) 7 sss Cheap Ena 160120513 8s ca) Z| rcs Crap El ots08 ced con = Af ) 7 = ort) Amb by email ~ ee Chi-Leong Tom; {by email = 2 PROPOSED INDUSTRIAL DEVELOPMENT Main Contract Works. couTRAcTOR ICONTRACTOR’S DRAWING SUBMISSION AT LOT 313 AND TWIL 49 TSUEN WAN, N.T. R Construction Company Limited MAIN CONTRACT WORKS D/D304/0013A Tara Tage Do2 BREET INSTALLATION = DRAWING SUBMISSION OF Earhina System layou- Foundation FORCLP Contractor's Submission ‘Consultants WrPL Remarks Draving rot Dai Te? aaa | ame Son ther ref, etc, ‘other description, etc. é Comments {eee notes 1, 3end4_) ote) CLP-BLG1-EL-2301 | earthing ystom ayout- Foundation 1 l Note 4 1 Approvod 2. Approved ae note, works to proceed & resubmit fo record 5. Disapproved and Resubna Note2 State yee (9 in Stato no (N) not cemplance wth Contract Specfeation i comptance ‘Tho situs insicates reviewed for compliance wth the design Intent" Comments made shal apply to al simi conditions 8. ‘etl, notjst te one ee. Te approval shal nate corsied ‘as roving tho contractors blgatin for corpance wih the Dpproval by the Architect shall not reve the contracts ‘bigaton fo ensure tall compliance of ther works wih Satlory requremont, | aManenenea ihrer Augen |. ——_ Vv Sao ll 1 = — | maces | FOUNDATION PLAN Enid eystemavour

You might also like