DEMAND FOR
LABORATORY SPACE
Life sciences is poised to see significant
investment this year. From the UK
perspective, this presents opportunities
to meet the need for more laboratories,
attract investment and enhance research
and development.
REPURPOSING OFFICE
SPACE TO LABS
There are several key considerations
when refitting office space to a laboratory
environment — structural, wellbeing
features, lifts, services and legal
considerations.
REPURPOSING
PARTICULARLY IN AREAS WHERE CLUSTERS OR INNOVATION
DISTRICTS ARE ESTABLISHED OR EMERGING, SUCH AS IN
KING’S CROSS, WEST LONDON, CAMBRIDGE AND AROUND
OTHER RUSSELL GROUP UNIVERSITIES.
OFFICES TO LABS
—
THE GROWING DEMAND In the most recent budget it Institutions are looking to improve
2 3
COST MODEL REPURPOSING OFFICES TO LABS
KEY CONSIDERATIONS
IN REPURPOSING OFFICE
SPACE FOR LABS
There are several key considerations
when refitting office space to provide a
laboratory environment.
Structural considerations
The foremost is slab heights and risers.
An initial viability assessment is needed
to quickly determine the slab-to-slab
height of a building to establish whether
there is enough height to bring in
additional services, such as risers.
Typically, a lab storey height would
be 4.1m to 4.5m high (top of slab Lifts Legal considerations
TRENDS IN LOCATION Demand is for a range of to soffit), allowing for the vertical 100% The increased cellularisation required Planning issues may arise regarding
4 5
COST MODEL REPURPOSING OFFICES TO LABS
FIT-OUT OPTIONS
(designed to an
All main plant agreed capacity)
provided to supply
entire building to
Space for Space for
an agreed capacity
additional additional
Ceiling void fitted out tenant plant/ tenant plant/
(could include ceiling, expansion if expansion if
grilles and lights) required required
LEVEL 1: SHELL AND INCOMING
UTILITIES SUPPLIED ONLY LEVEL 3B: ALL PLANT, SERVICES
RISERS AND CEILING VOIDS PROVIDED
/ Building in basic form, with FOR THE BUILDING
incoming utilities only
/ As with 3a but fit-out services in
/ Core utilities to be capable of the void
supporting expansion
/ Lights, grilles and ceilings could
Incoming utilities provided be provided
to agreed capacity Services capped off by riser and
capped off above ceiling for easy
connection by tenant, using plug-
Services tenant/
and-play connections
landlord risers
Incoming
utilities
Space for Landlord plant
tenant plant for
tenant fit-out
Fume extract system
(designed to an
All main plant agreed capacity)
provided to supply
Services tenant/
Fume extract system
landlord risers
LEVEL 3A: ALL PLANT AND SERVICES (designed to an agreed
capacity)
RISERS PROVIDED FOR THE BUILDING All main plant provided Incoming
to supply entire building utilities
/ Main plant provided to service Space for
to an agreed capacity
Space for
additional additional
entire building to agreed capacity tenant plant/ tenant plant/ Space fully fitted out and
expansion if expansion if ready for use by tenant
Incoming
utilities
6 7
COST MODEL REPURPOSING OFFICES TO LABS
Superstructure
Internal doors 609,000 27.02 1
Frame & upper floors 1,136,000 50.40 2
Internal doors to landlord shell and core space; timber frames, architraves and
Formation of new liftcore walls GF to Roof 442,000 19.61 1 300,000 13.31 0
ironmongery
Allowance for permanent structural modifications to newly formed openings 150,000 6.65 0 Riser doors 240,000 10.65 0
Allowance for new rooftop mounted flues and modifications to existing rootop steel Internal doors to back of house areas on GF 69,000 3.06 0
250,000 11.09 0
frame plant room
Making good of existing firespray to existing steel frame following soft stripout works 68,000 3.02 0
Wall finishes 310,000 13.75 0
Allowance for isolated repairs and making good following breakout for new internal
113,000 5.01 0 Wall finishes to landlord shell and core space; circulation, WC and reception spaces 310,000 13.75 0
risers
Allowance for patch repair of underside of slabs acoustic treatment 113,000 5.01 0
Floor finishes 1,034,000 45.87 1
Roof 1,035,000 45.92 1 Floor finishes to landlord shell and core space; circulation, WC and reception spaces 1,034,000 45.87 1
Allowance for part repair, part new (50;500 non-combustable roof systsem following
roof plantroom works; including tapered insulation, waterproofing and top finish coat 222,000 9.85 0 Ceiling finishes 448,000 19.88 1
to entire roof Ceiling finishes to landlord shell and core space; circulation, WC and reception
448,000 19.88 1
EO above for blue roof to terraced areas 75,000 3.33 0 spaces
Allowance for modifications to existing BMU railing, and new BMU cart,
125,000 5.55 0
recommissioning etc Fittings, furnishing & equipment 1,528,000 67.79 2
New roof terrace hardstandings, external furniture and planting and the like 475,000 21.07 1 Reception Desk 100,000 4.44 0
Allowance for PV panels to plant room 138,000 6.12 0 Speed Gates/ Entrance Security 200,000 8.87 0
WC fit out; mirrors, vanity units, cubicles and IPS duct panels 880,000 39.04 1
Stairs 220,000 9.76 0 Entrance lobby fit-out including; timber acoustic panelling, raised access floors,
300,000 13.31 0
Refurbishment of existing stairs incuding new handrails, finishings etc. 2nr main granite tiles and feature hardwood slatted ceiling sytem
220,000 9.76 0
cores, no modifications to staircore locations or formation of new feature stairs Allowance for wayfinding signage throughout landlord shell and core 48,000 2.13 0
8 9
COST MODEL REPURPOSING OFFICES TO LABS
DESCRIPTION ELEMENT COST (£) COST/M2 GIFA (£) % TOTAL COST DESCRIPTION ELEMENT COST (£) COST/M2 GIFA (£) % TOTAL COST
Services Fit-out works 20,077,000 890.73 28
MEP services installations 16,748,000 743.03 24 Cat A equivalent building fit-out works 7,667,000 340.15 11
Sanitary appliances to shell and core areas. 270,000 11.98 0 Full height internal partitioning system to suit generally open plan areas. 1,174,000 52.09 2
Foul water drainage, lab drainage and rainwater disposal to S&C and risers. 338,000 15.00 0 Encapsulated doorsets to labs, timber doorsets to offices, generally open plan areas 469,000 20.81 1
Domestic HW and CW services to shell and core and risers- separate stacks 676,000 29.99 1 Wipe clean sterisheen wall finishes to labs, standard dulux to offices. 626,000 27.77 1
Lab point of use HW and Cat 5 water service, capped at each demise. 451,000 20.01 1 Wipe clean gasketed suspended ceilings to labs, standard MF suspended ceiling or
1,174,000 52.09 2
Gas fired boilers and CHP units to serve S&C and tenant spaces. 1,465,000 65.00 2 the like with elements of acoustic treatment to offices.
LTHW water services to serve S&C spaces, apped at risers. 902,000 40.02 1 150mm raised floors generally 626,000 27.77 1
Mechanical AHU's and supply/ extract ductwork to S&C spaces, capped at risers. 2,254,000 100.00 3 Hardwearing chemical resistant vinyl to labs, carpet tiles to offices. 1,095,000 48.58 2
Primary chilled water plant and disctribution capped at risers for onward CAT A Simple lab benching and under and over bench storage. 2,347,000 104.13 3
2,141,000 94.99 3
installs. Serving FCUs in S&C spaces. Statutory and way finding signage. 156,000 6.92 0
Main LV switchboards and rising busbars within risers, terminated in submains panels
1,691,000 75.02 2
for onward CAT A installs. Small power and lighting to S&C spaces only. Cat A equivalent MEP fit-out 12,410,000 550.58 17
Natural gas connections to heat source plant 158,000 7.01 0 Lab appliances including sinks, WHB and eyewash stations 469,000 20.81 1
Fire sprinkler systems serving S&C including gas supression systems to IT hub Foul/ lab water drainage connecting into LL riser. 235,000 10.43 0
789,000 35.00 1
rooms, services capped in risers for onward CAT A fit-out.
Lab point of use HW & Cat 5 water service connection from LL risers. 626,000 27.77 1
BMS Head end unit and controllers to all landlord plant, with energy metering
1,691,000 75.02 2 Domestic HW & CW service connection from LL risers. 156,000 6.92 0
capability for onward CAT A fit-out integration
Heat source plant by landlord. - - 0
Fire alarm head end unit and detectors to S&C space, connection points made
338,000 15.00 0 LTHW water services to tenant spaces 861,000 38.20 1
available for onward CAT A fit-out
Dedicated CCTV and access control systems to landlord demises 225,000 9.98 0 Mechanical supply/ extract ductwork to tenant spaces from risers 1,878,000 83.32 3
Data installations and facilities for the disabled 338,000 15.00 0 Chilled water distribution services to tenant space. 861,000 38.20 1
Dedicated lab gases, fume extract and steam generation excluded, local bottled Small power and lighting installations to labs and offices. 2,269,000 100.67 3
Excluded 0
strategy TBA on a tenant by tenant basis. Fire sprinkler pipework and sprinkler heads connection from LL risers. 782,000 34.69 1
Testing and comissioning 412,000 18.28 1 BMS controllers to all tenant equipment ie. FCU's, VAV, CAV units, fire alarm interface
1,174,000 52.09 2
MEP contractor preliminaries 2,121,000 94.10 3 etc. connection into LL BMS head end.
Builders work in connection with services 488,000 21.65 1 Fire alarm sub-panels and detectors to labs and offices. 313,000 13.89 0
Dedicated CCTV and access control systems to tenant demises 235,000 10.43 0
Vertical transportation 1,733,000 76.89 2 Data installations and facilities for the disabled 313,000 13.89 0
New Passenger Lifts; GF to 10th 1,470,000 65.22 2 Dedicated lab gases, fume extract and steam generation excluded, local bottled
Excluded 0
strategy TBA on a tenant by tenant basis.
New Goods Lifts; GF to Roof 263,000 11.67 0
Testing and comissioning 305,000 13.53 0
MEP contractor preliminaries 1,572,000 69.74 2
Sub-total | Net trade cost 31,295,000 1,388.42 44
Builders work in connection with services 361,000 16.02 1
10 11
COST MODEL REPURPOSING OFFICES TO LABS
ACKNOWLEDGEMENT
The authors would like to acknowledge the contribution of
Lewis Peacock, Josh John, Alan Fox to the development of
this article.
12 13
About AECOM
AECOM is the world’s premier infrastructure consulting
firm, delivering professional services throughout the project
lifecycle — from planning, design and engineering to program
and construction management. On projects spanning
transportation, buildings, water, energy and the environment,
our public- and private-sector clients trust us to solve their
most complex challenges. Our teams are driven by a common
purpose to deliver a better world through our unrivaled
technical expertise and innovation, a culture of equity, diversity
and inclusion, and a commitment to environmental, social and
governance priorities. AECOM is a Fortune 500 firm and its
Professional Services business had revenue of $13.2 billion
in fiscal year 2020. See how we deliver what others can only
imagine at aecom.com and @AECOM.