Activity
NEW SITE PLANING
1
2
3
4
5
6
7
8
New Site Harware installaton
1
2
3
4
5
New SITE Configuration
1
2
3
4
NEW SITE COMMESSIONING
1
2
3
4
5
6
Main Projects
1
2
3
4
5
6
7
8
Expansions
1
2
3
4
5
Troubleshooting
1
2
3
4
Maintanance
1
2
Optimization
1
2
3
4
5
Reports
1
2
3
4
Upgrades
1
2
3
Cutovers
1
2
3
4
Logistics
1
2
Training and Recruitment
1
2
3
Department: Engineering
Activity
Traffic and coverage analysis
Nominal cell plan
Site survey
system design (site structure,hight,azimoth,tilt)
systme tunning
frequency planing
IP planing
Cell ID and LAC planning
nstallaton
Power equipment installation
BBU installation
RRU and fiber installation
Antenna installation
connecting site to transmission equipment
tion
(BSC/RNC) site Script prepartion
BBU site configution for connectivity
BBU script prepartion
loading script
SIONING
Checking and clearing hardware alarms
Site license uploading
Site nighbor defenition
Adding service parameters (HSPA,64QAM,CS fallback etc)
Activating site
Site service test (voice and data)
BSC/RNC Racks and Boards maintenace (CPU loads,Active Standby Swap check,Trunk usage)
ite Maintenace (Fan,Tempreture,Power Equipment room enviroment checking,,Grounding test,checking idoor and Outdoo
3 days 24
3 days 24
3 days 16
5 years 96-192
1 year 16
6 Months 48
2 Months 8
3 weeks 8
2 Months 8
daily 3
3 days 24
6 Months 48
6 Months 24
daily 30
daily 1 to 3
3 days 8
3 Months 208
3 Months 96
4 Months 24
1 day (every day) 3
daily 30 min
monthly/yearly 48
daily 2
6 Months 32
6 Months 48
6 Months 48
3 Years 48
5 years 96-192
5 years 96-192
8 years 48-96
5 years 96-192
6 month 24 hrs
6 month 24 hrs