Department: Engineering

Activity
NEW SITE PLANING
1
2
3
4
5
6
7
8
New Site Harware installaton
1
2
3
4
5
New SITE Configuration
1
2
3
4
NEW SITE COMMESSIONING
1
2
3
4
5
6
Main Projects
1
2
3
4
5
6
7
8
Expansions
1
2
3
4
5
Troubleshooting
1
2
3
4
Maintanance
1
2
Optimization
1
2

3
4
5
Reports
1
2
3
4
Upgrades
1
2
3
Cutovers
1
2
3
4
Logistics
1
2
Training and Recruitment
1
2
3
Department: Engineering

Activity
Traffic and coverage analysis
Nominal cell plan
Site survey
system design (site structure,hight,azimoth,tilt)
systme tunning
frequency planing
IP planing
Cell ID and LAC planning
nstallaton
Power equipment installation
BBU installation
RRU and fiber installation
Antenna installation
connecting site to transmission equipment
tion
(BSC/RNC) site Script prepartion
BBU site configution for connectivity
BBU script prepartion
loading script
SIONING
Checking and clearing hardware alarms
Site license uploading
Site nighbor defenition
Adding service parameters (HSPA,64QAM,CS fallback etc)
Activating site
Site service test (voice and data)

Choosing appropriate location for harware and power source plan


Ip plan for new BCS, RNC, Servers &Switches
Hardware installatin
Power on and checking all system
Integration with equipment (core and transmission)
Configuration of boards and interfaces
Connecting OMU to clients and commsioning OMU boards
Testing service voice and data

(BSC/RNC) user plane board\control plane board expansion


(BSC/RNC) interface expansion (A,ABIS,Iub,Iucs,Iups,S1)
Site Transimssion Expansion
Site Cell Expansion
Site Baseband Expansion
site harware faults troubleshooting (RRU,BBU baords,Antenna,sfp,Fiber cable,power equipment,fan,inviromental issues)
site software faults troubleshooting (software version,congestion,liscense issue,connectivity issues)
BSC/RNC harware faults troubleshooting (Boards,interfaces,SFP,Fan)
BSC/RNC software faults troubleshooting (Congestion,Lisccense issue,Software version issues)

BSC/RNC Racks and Boards maintenace (CPU loads,Active Standby Swap check,Trunk usage)
ite Maintenace (Fan,Tempreture,Power Equipment room enviroment checking,,Grounding test,checking idoor and Outdoo

Single site verification (New Site, Upgrade site &Expand site)


Pre-Dirve test (signal level , signal quality , interference , call statistics , Handover information , neighboring cell informatio
information , GPS location co-ordinates and etc.)

Post Drive test (Optimum performance check & Reporting)


Benchmark test (Main Cities)
Customer Complaint (Swift respond to custmors and solving issues)

NOC daily feedback Report


Wireless Task Reports
KPI Report
Capacity Report

RNC/BSC and U2020 software version upgrade


Site software version upgrade
Tems Investagation and Tems Discovery Software version Upgrade

RNC cutover (old to new)


BSC cutover (old to new )
Servers Cutover (U2020 server,IP clock server,Switches)
site cutover (BSC to BSC,RNC to RNC)

NEW Wireles Equipment Shipment Varification at port


New Wireles Equipment allocation and arrangement

New staff training


Internship training
Prepairing Exam and Interviewing new job candidates
Section : Wireless

Frequency Time (h) Working Hours


3 days 24

3 days 24

3 days 24

3 days 16

5 years 96-192

1 year 16
6 Months 48
2 Months 8
3 weeks 8
2 Months 8
daily 3
3 days 24
6 Months 48
6 Months 24

daily 30
daily 1 to 3

3 days 8

3 Months 208
3 Months 96
4 Months 24
1 day (every day) 3

daily 30 min
monthly/yearly 48
daily 2
6 Months 32

6 Months 48
6 Months 48
3 Years 48

5 years 96-192
5 years 96-192
8 years 48-96
5 years 96-192

6 month 24 hrs
6 month 24 hrs

1 year (once a year) 208


1 year (once a year) 96
1 year (once a year) 96
Choosing appropriate location for harware and power source plan
ip plan for new bsc/rnc or new server/switch
hardware installatin
power on and checking all system
integration with equipment (core and transmission)
configuration of boards and interfaces
connecting OMU to clients and commsioning OMU boards
testing service voice and data