Professional Documents
Culture Documents
Informe Técnico 3
Informe Técnico 3
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 2,0 Tons Load occurs at ..................................................... Jul 1600
Total coil load .......................................................... 23,5 MBH OA DB / WB ...................................................... 86,4 / 73,8 °F
Sensible coil load ................................................... 18,5 MBH Entering DB / WB ............................................. 74,6 / 63,3 °F
Coil CFM at Jul 1600 ............................................. 1044 CFM Leaving DB / WB .............................................. 56,3 / 55,3 °F
Max block CFM ..................................................... 1044 CFM Coil ADP ..................................................................... 54,3 °F
Sum of peak zone CFM ........................................ 1044 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,785 Resulting RH ................................................................. 54 %
CFM/Ton ............................................................... 532,6 Design supply temp. ................................................... 54,0 °F
ft²/Ton ................................................................... 183,6 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 65,4 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 4,71 gpm
Actual max CFM .................................................... 1044 CFM Fan motor BHP ........................................................... 0,14 BHP
Standard CFM ......................................................... 933 CFM Fan motor kW ............................................................. 0,11 kW
Actual max CFM/ft² ................................................. 2,90 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
SS Cuarto de UPS 1 18,1 Dec 1700 1044 0,4 360,0 2,90
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
2 0,012
34 5
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Total coil load ............................................................ 0,7 Tons Load occurs at ................................................... Jun 1500
Total coil load ............................................................ 8,0 MBH OA DB / WB ...................................................... 86,0 / 74,0 °F
Sensible coil load ..................................................... 4,5 MBH Entering DB / WB ............................................. 75,8 / 67,3 °F
Coil CFM at Jun 1500 ............................................. 265 CFM Leaving DB / WB .............................................. 58,1 / 57,4 °F
Max block CFM ....................................................... 265 CFM Coil ADP ..................................................................... 56,1 °F
Sum of peak zone CFM .......................................... 265 CFM Bypass Factor .......................................................... 0,100
Sensible heat ratio ............................................... 0,568 Resulting RH ................................................................. 68 %
CFM/Ton ............................................................... 400,1 Design supply temp. ................................................... 56,0 °F
ft²/Ton ................................................................... 233,7 Zone T-stat Check .................................................... 1 of 1 OK
BTU/(hr·ft²) ............................................................. 51,3 Max zone temperature deviation .................................. 0,0 °F
Water flow @ 10,0 °F rise ...................................... 1,59 gpm
Actual max CFM ...................................................... 265 CFM Fan motor BHP ........................................................... 0,04 BHP
Standard CFM ......................................................... 237 CFM Fan motor kW ............................................................. 0,03 kW
Actual max CFM/ft² ................................................. 1,71 CFM/ft² Fan static .................................................................... 0,50 in wg
Calculation Months ..................................... Jan to Dec Zone CFM Sizing ................. Sum of space airflow rates
Sizing Data .................................................. Calculated Space CFM Sizing ............. Individual peak space loads
Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (MBH) Load (CFM) (MBH) (ft²) CFM/ft²
Zone 1
SS Hall Ascensor 1 4,1 Jan 2000 265 0,0 155,0 1,71
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
Air Density x Heat Capacity x Conversion Factor: At sea level = 1,080; At site altitude = 0,964 BTU/(hr-CFM-F)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 4746,6; At site altitude = 4238,4 BTU/(hr-CFM)
Site Altitude = 3100,0 ft
0,016
2
34 0,012
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )
0,016
0,012
1 23 4
0,010
0,008
0,006
0,004
0,002
0,000
30 40 50 60 70 80 90 100
Temperature ( °F )