Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REFERENCES

DOCUMENT NO. TITLE


SECTION B-B SECTION A-A &AG C-ZA 9100 FOUNDATION LOCATION PLAN
&AG N-ZE 1503 CARRYING OUR FOR CATALYST TUBES / FURNACE FLOOR
14555 2966 &AG J-ZE 7001 MEASURING NOZZLES DETAILS
INSIDE LINING INSIDE LINING
5 212 212 5
5 212 212 5
C

HD400x314
1 TRANSITION

HEB400

HEB400
TO WHRU DETAIL 2
EL + 21.950 CL OF SPLICE
BOS +21.680 HEB220 PLATFORM PLATFORM HEB220 HEB220
D IPE120 TOS TOS

IPE120

IPE120
61TT-19A/B/C

wH407x550x27/44
800 IPE120 IPE120

wH407x550x27/44
L150x150x12
L150x90x12

HEM360

HEM360
U200
L150x90x12

DETAIL 1
(TYP)

RS100x10
1

250

250
(TYP)
U300 U300 U300
1 HD400x314
TOS +18.970 TOS+ 19.970
U300
HEB240

BOBP+ 18.515 BOBP + 18.515 BOBP + 18.515 GENERAL NOTES :


C
970

725 3125

6
1. ALL DIMENSIONS ARE IN MILLIMETER AND ELEVATIONS ARE IN METER.
D CL EL+ 17.450 CL EL+ 17.450 2. ALL ELEVATIONS ARE TOP OF STEEL UNLESS NOTED OTHERWISE.
3. HPP = EL+100.000 REFERRED AS +16.000 ON DESIGN DRAWING.

HPP + 16.000 HPP + 16.000 1

350 1835 1835 1835 1835 1835 1835

600 4200 4025 3670 3670 4025 1900 1900

E D C B A 6 5 4

LEGEND:
BOBP - BOTTOM OF BASE PLATE
HPP - HIGH POINT OF PAVING
TOS - TOP OF STEEL
BOS - BOTTOM OF STEEL
CL - CENTRE LINE

N FLOOR PLAN AT EL +18.970

SECTION C-C
CARRYING OUT HEATER FLOOR SECTION D-D
SEE DWG. NO. &AG N-ZE 1503
1600 600 1600 3400
5085 1
OUTSIDE PLATE
OUTSIDE PLATE
B 6 210 2968 210 6
1 INSIDE LINING 2142.5 400 400 2142.5

6
L150x150x12
W550/400X400X40
E

86-TT-017C

86-TT-017B

86-TT-017A
BOS +21.680 210
1390

1 L150x90x12
210 6
IPE240 (TYP) IPE240 (TYP) 1 6 210
OUTSIDE PLATE

INSIDE LINING

6
L150x90x12

L150x150x12

L150x150x12
BOS+ 20.546
L150x90x12

L150x90x12
U300
U300
4025

1245

210
2238
2710

OUTSIDE PLATE
4653

L150x90x12

L150x90x12
INSIDE
LINING
INSIDE LINING

1104
1576
1390

HD400x314 L150x150x12
L150x90x12
250

250
TOS+ 18.970 TOS+ 18.970
1250

HEB240
HEB240

HEB240
6

6
U300

U300
3670

1170

DETAIL 1
1250

HD400x314
DETAIL 2
C
1
1250

TRANSITION DUCT REFORMER

HD400x314
350
TOS +22.230 HEB220
U300

U300
3670

1170

L150x150x12

1
HD400x347

EL+ 21.950
CL OF SPLICE
U200
250

TOS+ 18.970 BOS+ 21.680


1250

HD400x314
6

B IFI 1 10.06.2019 ISSUED FOR INFORMATION DAP JYD AJB

HD400x347
( BOLT PROJ.)

L150x150x12
210

BOBP+ 18.515
1390

U200
IFI 0 12.04.2019 ISSUED FOR INFORMATION RJP JMA/SG AJB/AS

STATUS ISSUE DATE DESCRIPTION PREPARED CHECKED APPROVED


250
U300
U300
4025

1245

350
HENGYUAN REFINING COMPANY BERHAD(HRC)
PORT DICKSON, MALAYSIA

E E HYDROGEN MANUFACTURING UNIT


1390

A 1 A
HRC Project No. : HRC-DS000211
W550/400X400X40 TRANSITION DUCT REFORMER
A HRC Drawing No. PD-4756026
HRC Project Code : H2GEN
U200

B LINDE ENGINEERING INDIA PVT. LTD.


VADODARA, GUJARAT

The reproduction, distribution and utilization of this document as well as the communication of its contents
1900 1900 to others without express authorization are prohibited.Offenders will be held liable for the payment of
damages. All rights reserved in the event of the grant of a patent,utility model or design.

Linde Project No. : 2910A1MN Linde Project Code : PORT DICKSON

6 5 4 Title: Scale
FLOOR AND TRANSITION DUCT- REFORMER
HYDROGEN PLANT Issue 1

Linde Drawing No. &AG-N-ZE 1507 (EN) Sheet 01 Size A1

You might also like