230 KV Switching Station, Sirajganj

Circuit Name: Sirajganj 225 MW Combined Cycle Power Plant Unit-1 (NWPGCL)
Total Generation kWh by Fuel NG
Time Period
Meter Description 01/11/2020 30/11/2020 Difference (Wh) M.F. Correction Active Energy Reactive Energy
00:00 Hrs 24:00 Hrs Factor Calculated (kWh) Calculated
(kVARh)
Import (Wh) 2238915.79 2256071.11 17155.32 35870214.55
Main Meter Export (Wh) 2439.38 2541.39 102.01 213293.64
2090909.0909 1.0000
Sl.No:216566641 Import (VARh) 623677.89 627284.21 3606.32 7540487.273
Export (VARh) 4052.79 4053.48 0.69 1442.727
Net Calculated Energy: 35,656,920.91 kWh and 7,539,044.55 kVARh

Time Period
Meter Description 01/11/2020 30/11/2020 Difference (kWh) M.F. Correction Active Energy Reactive Energy
00:00 Hrs 24:00 Hrs Factor Calculated (kWh) Calculated
(kVARh)
Import (KWh) 4377.587825 4394.748425 17.160600 35881254.55
Back-Up Meter Export (KWh) 236.976550 237.078400 0.101850 212959.09
2090909.0909 1.0000
Sl.No: 11441782 Import (KVARh) 1205.545550 1208.852800 3.307250 6915159.09
Export (KVARh) 49.854400 50.058475 0.204075 426702.27
Net Calculated Energy: 35,668,295.45 kWh and 6,488,456.82 kVARh

(A.F.M Mazed Kamal Khan) ( Md. Jahid Hasan) (Md. Moniruzzaman)


Sub-Divisional Engineer Executive Engineer (EMD, Addl. Charge) Executive Engineer
Sirajganj 230KV Switching Station Sirajganj 225MW CCPP (Unit-01) Energy Auditing Unit Division
GMD, PGCB, Bogura NWPGCL, Soydabad, Sirajganj BPDB, Bogura
Cell: 01714099361 Cell: 01755630028