Roller head and boot pulleys installation 1 BE-FDY-01 Buckets fittment 2 Chute Installation From BE-FDY-01 to Sand cooling drum)
3 Exhaust installation between BE-FDY-01 to Sand cooling drum
4 Water Cooling Line installation between BE-FDY-01 to Sand cooling drum
End Caps Fitment
5 Cooling Drum Gear Drive Fitting Drive Guide Covers Installation Overband Magnetic Seprator 6 conveyors installtion on BC-FDY-01
from BC-FDY-01 to BE-FDY-02
7 Chute Installation from BC-FDY-02 to BE-FDY-03 8 Pipe Chute Installation from New Sand Hopper to BE-FDY-03 Bentonite Storage vessel to 9 Fitment of Screw Conveyor Intensive Mixer Blender Installation Water line Installation 10 Intensive Mixer Discharge Gate Installation Scrappers Installation 11 BC-FDY-03 Fitment of Rollers and Belt,Gear Motor 12 Chute from BC-FDY-03 to Green Sand Storage Hopper 13 Shakeout Machine Vibratory motors Installation
14 Vibratory conveyor installation from shakeout machine to BE-FDY-01