PREFERRED ROOM LAYOUT

Allura FD20 Ceiling

6'-0" 24'-10"

AD5 Table Floorplate


Centerline 8'-8"

MG
ATY SP

PBK
TV
8'-9"

8'-9"
MP
MSA

MA

Clea/Table
Centerline

17'-3"
Head End MAV

Customer's
Physio DB
(PHY)

7'-0"
CY

Equipment Layout
Recommended Ceiling Height : 9' - 6 3/16 ", +3/8 / -0
(2900mm, +10mm / -0)

0 1' 2' 4' 8'

Philips
Equipment Designation Detail Sheet Equipment Designation Detail Sheet

Weight Heat Load Weight Heat Load


Description Description
(lbs) (btu/hr) (lbs) (btu/hr)

SP Clea Stand 2557 1195 CY Viewing/Control 126 567

MSA Angio Diagnost 5 with Pivot 787 375 DB Documentation Box - Quantity = 4 75 0
(Final location to be coordinated with customer (each)
MG Velara Generator 40E Cabinet (MG) 510 4780 and/or local Philips service.)

MP Peripherial 40E Cabinet 510 11950 ATY Exam Room Auxiliary Box 7 1.7

PBK PDU 4000/UPS (Installed By Contractor) 860 2450 TV Three LCD Monitor Suspension 585 512

MA Mains 40E Cabinet 710 5634 MAV Mavig Ceiling Track w/ Radiation Shield 167 350

Environmental Requirements for General Equipment Locations


Heating, ventilation, air conditioning requirement for general equipment locations must maintain temperature
at 72 degrees +/- 10 degrees Fahrenheit and non-condensing relative humidity at 45% +/- 15%.

Power Requirements
Velara with PDU 4000
Supply Configuration:
3 Phase, 3 Wire Power and Ground, Delta or Wye
3 Phase, 4 Wire Power with Neutral + Ground, Wye.

Nominal Line Voltage:


380, 400, 440, 460 or 480 VAC, 60 Hz.

Branch Power Requirement:


225 KVA

Philips Medical Systems North America Company, 710 Bridgeport Avenue, Shelton, Connecticut 06484 2
Equipment specifications are subject to change without notice. Documentation number 4535 983 01531. February, 1998