PROJECT NAME
Erection, Testing and Commissioning of Material Handling System for West Port,
Mundra
TABLE OF CONTENTS
1.0 DEFINITION
2.0 INTRODUCTION
4.0 CORRESPONDENCE
1.3 The “Vendor” means M/s. Mundra Port and Special Economic Zone Ltd.
(MPSEZL) M/s Elecon Engineering Co. Ltd. (EECL)
2.0 INTRODUCTION:
2.1 Erection, Testing and Commissioning of Material Handling System for West
Port, Mundra.
2.2 M/s Mundra Port and Special Economic Zone Ltd. have been appointed by the
Buyer for (Name of work)
2.3 This Co-ordination procedure outlines the Protocol to be established between the
Buyer and the Vendor for transfer and distribution of drawing/document,
holding review meeting, Project Monitoring and progress reporting system and
other project management requirement for the smooth execution of the project.
2.4 Effective date of Contract:
The Effective Date of Contract shall be 19 th November, 2008 as mentioned in the
Service Order
For Technical & Commercial Matters For all Site Related Matters with copy
With a copy to ……… To……….