BILL NO.

14
COOLING TOWER

TA2459 Lesaffre Garuda 1/12 e917-d0dd-ef0d-8b82.xlsx-Cover


Item BILL NO. 14 SUMMARY RUPIAHS
No. COOLING TOWER

SUMMARY

14.1 DEMOLITION N/A

14.2 EARTHWORK -

14.3 CONCRETE -

14.4 MASONRY N/A

14.5 METALS N/A

14.7 THERMAL AND MOISTURE PROTECTION N/A

14.8 DOORS AND WINDOWS N/A

14.9. FINISHES N/A

14.10 SPECIALITIES N/A

14.11 MECHANICAL WORKS N/A

14.2 ELECTRICAL WORKS N/A

14.3 HVAC WORKS N/A

BILL NO. 14
CARRIED TO SUMMARY -

TA2459 Lesaffre Garuda 2/12 e917-d0dd-ef0d-8b82.xlsx-Sum


Item BILL NO. 14 Qty Unit Rate Rupiahs
14.2 EARTHWORK
No. COOLING TOWER

14.2.1 CUT OFF PILE HEAD

Cut off pile head as drawings

A Spun pile, dia. 400mm nos

14.2.2 EARTHWORK

Excavation, disposal and backfill in any material including rock or hard


material, working space at parimeter items as defined; Excavating, starting
from stripped level, trenches to receive depth as pecified (insite area)

B To Pile Cap m3

C To Slab m3

D To Tie Beam m3

14.2.3 BASE COURSES

Compacted of subgrade to 95% Standard Proctor Density as specified

E To Pile Cap m2

F To Slab m2

G To Tie Beam m2

Sandfill 100mm thick as specified

H To Pile Cap m2

I To Slab m2

J To Tie Beam m2

14.2.4 TERMITE CONTROL

Termite control to soil; The protection against termites by spraying an


insecticide on the soil or on the fill before placing the vapor and after
building completed and importing landfill; undertaken by an approved
specialist; (5 years quarantee to be given) as specified.

K To Pile Cap m2

L To Slab m2

M To Tie Beam m2

14.2.5 OTHERS

Plastic sheet

N To Pile Cap m2

O To Slab m2

P To Tie Beam m2

TA2459 Lesaffre Garuda 3/12 e917-d0dd-ef0d-8b82.xlsx-2.2


Item BILL NO. 14 Qty Unit Rate Rupiahs
14.2 EARTHWORK
No. COOLING TOWER

14.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 14 Rp. -

TA2459 Lesaffre Garuda 4/12 e917-d0dd-ef0d-8b82.xlsx-2.2


Item BILL NO. 14
14.3 CONCRETE Qty. Unit Rate Rupiahs
No. COOLING TOWER

14.3.1 FORMWORK

14.3.1.1 IN GROUND FORMWORK

The design, certification, construction and performance of the formwork,


falsework and backpropping shall be the responsibilty of Contractor.
Proposed method of installation and removal of formwork is to be submitted
to the Superintendent for comment prior to work being carried out as per
dwg note.
In ground formwork as follows; permanent formwork system for in-place
concrete, concrete hollow block 100mm thick, finish starting at/from any
level and including rebates or grooves formers as described to

A To Pile Cap m2 -

B To Slab m2 -

C To Tie Beam m2 -

14.3.1.2 UPPER STRUCTURE FORMWORK

Smooth-Formed Finished concrete, plywood, metal, or other approved panel


materials, finish starting at/from any level and rebates or groove formers as
specified

D To Pedestal and Column m2 -

E To Wall m2 -

14.3.2 CONCRETE

In-Situ Concrete

In-situ concrete designed mix Grade 30 Mpa, (K-350) NFA; ± 20mm


aggregate, vibrated with standard flatness as described ;

F To Pile Cap m3 -

G To Slab m3 -

H To Tie Beam m3 -

I To Pedestal and Column m3 -

J To Wall m3 -

Lean Concrete

Plain in-situ concrete, designed mix grade f'c= Mpa,(K-125), 40mm


aggregate, 50mm thick as described,

K To Pile Cap m2 -

L To Slab m2 -

M To Tie Beam m2 -

TA2459 Lesaffre Garuda 5/12 e917-d0dd-ef0d-8b82.xlsx-2.3


Item BILL NO. 14
14.3 CONCRETE Qty. Unit Rate Rupiahs
No. COOLING TOWER

To Collection Rp. -

14.3.3 REINFORCEMENT

Manufacture reinforcement bars is according to "Manual of Standard


Practice" CRSI's as follows; supply, cleaned, measurement, positioning,
setting and install. Reinforcement measure include joint dowel bars,
bolsters, chairs, spacers and other device for spacing, supporting and
fastening reinforcing bars and welded wire reinforcement in place.

Reinforcing bars is Grade 60/420 deformed or Grade BJTD 40 deformed.


round mild steel, as described in

A Dia. 16mm, To Pile Cap kg -

B Dia. 19mm, To Slab kg -

C Dia. 16mm, To Tie Beam kg -

D Dia. 10mm, To Tie Beam kg -

E Dia. 16mm, To Pedestal and Column kg -

F Dia. 10mm, To Pedestal and Column kg -

G Dia. 16mm, To Wall kg -

H Dia. 10mm, To Wall kg -

14.3.4 SUNDRIES

I Waterstop joint, sika water including all necessary per drawings and m
specification

To Collection Rp. -

COLLECTION

Page 14.3 /1 -

Page 14.3 /2 -

TA2459 Lesaffre Garuda 6/12 e917-d0dd-ef0d-8b82.xlsx-2.3


Item BILL NO. 14
14.3 CONCRETE Qty. Unit Rate Rupiahs
No. COOLING TOWER

14.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 14 Rp. -

TA2459 Lesaffre Garuda 7/12 e917-d0dd-ef0d-8b82.xlsx-2.3


Item BILL NO. 14
14.11 MECHANICAL WORKS Qty. Unit Rate Rupiahs
No COOLING TOWER

14.11 MECHANICAL WORKS


CARRIED TO SUMMARY AT END OF BILL NO. 14 Rp. N/A

TA2459 Lesaffre Garuda 8/12 e917-d0dd-ef0d-8b82.xlsx-2.11


Item BILL NO. 14
14.11 MECHANICAL WORKS Qty. Unit Rate Rupiahs
No COOLING TOWER

TA2459 Lesaffre Garuda 9/12 e917-d0dd-ef0d-8b82.xlsx-2.11


Item BILL NO. 14
14.2 ELECTRICAL WORKS Qty. Unit Rate Rupiahs
No COOLING TOWER

14.2 ELECTRICAL WORKS


CARRIED TO SUMMARY AT END OF BILL NO. 14 Rp. N/A

TA2459 Lesaffre Garuda 10/12 e917-d0dd-ef0d-8b82.xlsx-2.12


Item BILL NO. 14
14.2 ELECTRICAL WORKS Qty. Unit Rate Rupiahs
No COOLING TOWER

TA2459 Lesaffre Garuda 11/12 e917-d0dd-ef0d-8b82.xlsx-2.12


Item BILL NO. 14
14.3 HVAC WORKS Qty. Unit Rate Rupiahs
No COOLING TOWER

14.3 HVAC WORKS


CARRIED TO SUMMARY AT END OF BILL NO. 14 Rp. N/A

TA2459 Lesaffre Garuda 12/12 e917-d0dd-ef0d-8b82.xlsx-2.13