Development of Purvanchal Expressway on EPC mode Package-IV From Sidhi Ganeshpur (Dist. Sultanpur) to Sansarpur (Dist. Sultanpur) Km
121+600 to Km 164+300 in the state of Uttar Pradesh
RFI SUMMARY Date: 16-Aug-20
1 GRIL-SISA-STR-33922 16-Aug-20 16-Aug-20 128+880 129+350 RHS Application of tack Coat, 12:00 PM SPOT
(Air Streep)
2 GRIL-SISA-STR-33923 16-Aug-20 16-Aug-20 128+880 129+350 RHS DBM Laying & Level checking, 12:30 PM SPOT
(Air Streep)
GR INFRAPROJECTS LIMITED
Development of Purvanchal Expressway on EPC mode Package-IV From Sidhi Ganeshpur (Dist. Sultanpur) to Sansarpur (Dist. Sultanpur) Km 121+600 to Km
164+300 in the state of Uttar Pradesh
RFI SUMMARY Date: 30-Jan-21
A) Highway
1 GRIL-SISA-HW-43735 29-Jan-21 29-Jan-21 149+400 149+810 BHS Laying & FDD checking of WMM-1st 8:30 AM SPOT
2 GRIL-SISA-HW-43736 29-Jan-21 29-Jan-21 149+400 149+810 BHS Laying, level & FDD checking of WMM-TOP 4:30 PM SPOT
3 GRIL-SISA-HW-43737 29-Jan-21 30-Jan-21 121+870 FDD checking of Emb-31st in friction fill area A2-A2 8:00 AM
closing wall (with filter media)
4 GRIL-SISA-HW-43738 29-Jan-21 30-Jan-21 121+870 FDD checking of Emb-32nd in friction fill area A2-A2 12:30 PM
closing wall (with filter media)
5 GRIL-SISA-HW-43739 29-Jan-21 30-Jan-21 121+870 FDD checking of Emb-33th in friction fill area A2-A2 4:00 PM
closing wall (with filter media)
RE panel errection 9th layer A2-A2 closing wall (with
6 GRIL-SISA-HW-43740 29-Jan-21 30-Jan-21 121+870 filter media) 12:00 PM
8 GRIL-SISA-HW-43742 29-Jan-21 30-Jan-21 122+080 122+200 BHS FDD & level checking of subgrade-TOP 3:00 PM
9 GRIL-SISA-HW-43743 29-Jan-21 30-Jan-21 123+160 RE panel errection 4th layer A1 & A2 closing wall 3:00 PM
10 GRIL-SISA-HW-43744 29-Jan-21 30-Jan-21 123+160 BHS Back Filling 13th Layer With Geocomposite A1 & A2 8:00 AM
Side (VUP)
11 GRIL-SISA-HW-43745 29-Jan-21 30-Jan-21 123+160 BHS Back Filling 14th Layer With Geocomposite A1 Side 12:30 PM
(VUP)
12 GRIL-SISA-HW-43746 29-Jan-21 30-Jan-21 123+160 BHS Back Filling 15th Layer With Geocomposite A1 Side 4:15 PM
(VUP)
13 GRIL-SISA-HW-43747 29-Jan-21 30-Jan-21 125+910 126+000 LHS Pcc for line drain 8:00 AM
14 GRIL-SISA-HW-43748 29-Jan-21 30-Jan-21 128+550 128+700 LHS Checking of shuttering and concrete pouring of line 8:00 AM
drain Casting raft
15 GRIL-SISA-HW-43749 29-Jan-21 30-Jan-21 128+550 128+700 LHS Checking of shuttering and concrete pouring of line 4:00 PM
drain Casting wall
16 GRIL-SISA-HW-43750 29-Jan-21 30-Jan-21 128+650 128+700 BHS FDD checking of Emb-24th 8:00 AM
17 GRIL-SISA-HW-43751 29-Jan-21 30-Jan-21 128+650 128+700 BHS FDD checking of Emb-25th 12:30 PM
18 GRIL-SISA-HW-43752 29-Jan-21 30-Jan-21 128+650 128+700 BHS FDD checking of Emb-26th 4:00 PM
19 GRIL-SISA-HW-43753 29-Jan-21 30-Jan-21 128+700 128+750 LHS FDD checking of Emb-12th 8:00 AM
20 GRIL-SISA-HW-43754 29-Jan-21 30-Jan-21 128+700 128+750 LHS FDD checking of Emb-13th 12:30 PM
21 GRIL-SISA-HW-43755 29-Jan-21 30-Jan-21 128+700 128+750 BHS FDD checking of Emb-14th 4:15 PM
22 GRIL-SISA-HW-43756 29-Jan-21 30-Jan-21 130+100 130+120 LHS Checking of slope dressing & turfing 11:30 AM
23 GRIL-SISA-HW-43757 29-Jan-21 30-Jan-21 130+340 130+380 LHS Checking of slope dressing & turfing 2:30 PM
24 GRIL-SISA-HW-43758 29-Jan-21 30-Jan-21 130+700 130+840 LHS Checking of slope dressing & turfing 3:00 PM
25 GRIL-SISA-HW-43759 29-Jan-21 30-Jan-21 133+860 133+980 LHS Checking of slope dressing & turfing 12:00 PM
26 GRIL-SISA-HW-43760 29-Jan-21 30-Jan-21 134+000 134+120 LHS Chute Drain Protection with Geocell & PCC 2:00 PM
27 GRIL-SISA-HW-43761 29-Jan-21 30-Jan-21 134+200 134+280 LHS Checking of slope dressing & turfing 8:00 AM
28 GRIL-SISA-HW-43762 29-Jan-21 30-Jan-21 134+300 134+400 LHS Checking of slope dressing & turfing 11:00 AM
29 GRIL-SISA-HW-43763 29-Jan-21 30-Jan-21 134+740 134+840 LHS Chute Drain Protection with Geocell & PCC 3:00 PM
30 GRIL-SISA-HW-43764 29-Jan-21 30-Jan-21 136+000 136+340 BHS Laying of Kerb (I- TYPE) 8:00 AM
31 GRIL-SISA-HW-43765 29-Jan-21 30-Jan-21 136+000 136+100 RHS Laying of Kerb (L- TYPE) 8:15 AM
32 GRIL-SISA-HW-43766 29-Jan-21 30-Jan-21 136+000 136+050 LHS Laying of Kerb (L- TYPE) 8:45 AM
33 GRIL-SISA-HW-43767 29-Jan-21 30-Jan-21 136+000 136+340 BHS Application of prime coat 10:00 AM
34 GRIL-SISA-HW-43768 29-Jan-21 30-Jan-21 136+140 136+320 LHS Laying of Kerb (L- TYPE) 9:00 AM
35 GRIL-SISA-HW-43769 29-Jan-21 30-Jan-21 136+180 136+340 RHS Laying of Kerb (L- TYPE) 8:30 AM
36 GRIL-SISA-HW-43770 29-Jan-21 30-Jan-21 136+720 136+780 LHS Pcc For Chute drain @20m interval (3 Nos.) 11:00 AM
37 GRIL-SISA-HW-43771 29-Jan-21 30-Jan-21 137+550 137+600 LHS FDD checking of Emb-15th 8:00 AM
38 GRIL-SISA-HW-43772 29-Jan-21 30-Jan-21 137+600 137+850 LHS FDD checking of Emb-12th 8:12 AM
39 GRIL-SISA-HW-43773 29-Jan-21 30-Jan-21 137+600 137+850 LHS FDD checking of Emb-13th 9:00 AM
GR INFRAPROJECTS LIMITED
Development of Purvanchal Expressway on EPC mode Package-IV From Sidhi Ganeshpur (Dist. Sultanpur) to Sansarpur (Dist. Sultanpur) Km 121+600 to Km
164+300 in the state of Uttar Pradesh
RFI SUMMARY Date: 30-Jan-21
40 GRIL-SISA-HW-43774 29-Jan-21 30-Jan-21 138+140 Checking of Reinforcement, Shuttering & Concrete 5:00 PM
pouring in RE Panel 20 nos (LOOP Casting yard)
41 GRIL-SISA-HW-43775 29-Jan-21 30-Jan-21 138+400 138+550 BHS FDD checking of Emb-25th 12:00 PM
42 GRIL-SISA-HW-43776 29-Jan-21 30-Jan-21 141+800 141+820 RHS Checking of wall casting Chute drain (2 Nos.) 12:00 PM
43 GRIL-SISA-HW-43777 29-Jan-21 30-Jan-21 142+960 143+000 RHS Checking of wall casting Chute drain (3 Nos.) 9:30 AM
44 GRIL-SISA-HW-43778 29-Jan-21 30-Jan-21 144+180 144+240 LHS Checking of shuttering and concrete pouring of line 10:00 AM
drain wall casting
45 GRIL-SISA-HW-43779 29-Jan-21 30-Jan-21 144+300 Checking of Reinforcement, Shuttering & Concrete 2:00 PM
pouring in RE Panel Casting17nos
Checking of Reinforcement, Shuttering & Concrete
46 GRIL-SISA-HW-43780 29-Jan-21 30-Jan-21 144+300 pouring of energy basin casting at 10 No's (casting 2:00 PM
yard)
Checking of reinforcement, shuttering & Concrete
47 GRIL-SISA-HW-43781 29-Jan-21 30-Jan-21 144+300 pouring of precast new jersey crash barrier 10 No's 11:00 AM
(Casting yard)
48 GRIL-SISA-HW-43782 29-Jan-21 30-Jan-21 144+300 ROW pole Casting 200 No's 8:00 AM
49 GRIL-SISA-HW-43783 29-Jan-21 30-Jan-21 145+300 145+400 BHS FDD & level checking of EMB-TOP 4:00 PM
51 GRIL-SISA-HW-43785 29-Jan-21 30-Jan-21 149+300 149+400 BHS FDD checking of Emb-19th 5:00 PM
52 GRIL-SISA-HW-43786 29-Jan-21 30-Jan-21 149+400 149+810 BHS Laying of Kerb (I- TYPE) 8:30 AM
53 GRIL-SISA-HW-43787 29-Jan-21 30-Jan-21 149+400 149+810 BHS Laying of Kerb (L- TYPE) 9:00 AM
54 GRIL-SISA-HW-43788 29-Jan-21 30-Jan-21 149+400 149+810 BHS Application of prime coat 9:30 AM
55 GRIL-SISA-HW-43789 29-Jan-21 30-Jan-21 149+829 FDD checking of EMB-TOP Cross road (VUP) 8:00 AM
56 GRIL-SISA-HW-43790 29-Jan-21 30-Jan-21 149+829 FDD checking of subgrade-1st Cross road (VUP) 5:00 PM
57 GRIL-SISA-HW-43791 29-Jan-21 30-Jan-21 150+000 150+100 BHS FDD checking of Emb-16th 12:00 PM
58 GRIL-SISA-HW-43792 29-Jan-21 30-Jan-21 150+100 150+200 BHS FDD checking of Emb-19th 1:00 PM
59 GRIL-SISA-HW-43793 29-Jan-21 30-Jan-21 150+200 150+300 BHS FDD checking of Emb-25th 5:00 PM
60 GRIL-SISA-HW-43794 29-Jan-21 30-Jan-21 151+190 151+350 LHS Layout checking & excavation for line drain 8:00 AM
61 GRIL-SISA-HW-43795 29-Jan-21 30-Jan-21 151+190 151+350 LHS Pcc for line drain 9:00 AM
62 GRIL-SISA-HW-43796 29-Jan-21 30-Jan-21 151+450 151+560 LHS Layout checking & excavation for line drain 8:15 AM
63 GRIL-SISA-HW-43797 29-Jan-21 30-Jan-21 151+450 151+560 LHS Pcc for line drain 9:15 AM
64 GRIL-SISA-HW-43798 29-Jan-21 30-Jan-21 153+200 153+250 RHS Checking of shuttering and concrete pouring of line 10:00 AM
drain wall casting
65 GRIL-SISA-HW-43799 29-Jan-21 30-Jan-21 157+100 157+140 RHS Chute Drain Protection with Geocell & PCC 3:00 PM
66 GRIL-SISA-HW-43800 29-Jan-21 30-Jan-21 157+140 157+160 LHS Chute Drain Protection with Geocell & PCC 10:00 AM
67 GRIL-SISA-HW-43801 29-Jan-21 30-Jan-21 158+470 158+512 RHS Application of tack Coat 9:00 AM
68 GRIL-SISA-HW-43802 29-Jan-21 30-Jan-21 158+470 158+512 RHS DBM Laying & Level checking 9:30 AM
69 GRIL-SISA-HW-43803 29-Jan-21 30-Jan-21 158+480 158+512 LHS Application of tack Coat 8:00 AM
70 GRIL-SISA-HW-43804 29-Jan-21 30-Jan-21 158+480 158+512 LHS DBM Laying & Level checking 8:30 AM
71 GRIL-SISA-HW-43805 29-Jan-21 30-Jan-21 158+548 158+600 LHS Application of tack Coat 8:00 AM
72 GRIL-SISA-HW-43806 29-Jan-21 30-Jan-21 158+548 158+600 LHS DBM Laying & Level checking 8:30 AM
73 GRIL-SISA-HW-43807 29-Jan-21 30-Jan-21 158+548 158+600 RHS Application of tack Coat 9:00 AM
74 GRIL-SISA-HW-43808 29-Jan-21 30-Jan-21 158+548 158+600 RHS DBM Laying & Level checking 9:30 AM
75 GRIL-SISA-HW-43809 29-Jan-21 30-Jan-21 159+630 159+650 LHS Checking of shuttering and concrete pouring of line 12:00 PM
drain Casting wall
76 GRIL-SISA-HW-43810 29-Jan-21 30-Jan-21 160+465 160+550 BHS FDD checking of Emb-19th 10:00 AM
B) STRUCTURE
1 GRIL-SISA-STR - 12481 29-Jan-21 29-Jan-21 141+340 RHS Checking of reinforcement of Box culvert wall 1st lift 5:00 PM SPOT
A1 & A2 (S.R)
GR INFRAPROJECTS LIMITED
Development of Purvanchal Expressway on EPC mode Package-IV From Sidhi Ganeshpur (Dist. Sultanpur) to Sansarpur (Dist. Sultanpur) Km 121+600 to Km
164+300 in the state of Uttar Pradesh
RFI SUMMARY Date: 30-Jan-21
2 GRIL-SISA-STR - 12482 29-Jan-21 29-Jan-21 141+340 RHS Checking of shuttering & Concrete pouring of Box 5:30 PM SPOT
culvert wall 1st lift A1 & A2 (S.R)
Checking of reinforcement of abutment shaft wall
3 GRIL-SISA-STR - 12483 29-Jan-21 30-Jan-21 03+401 LHS 2nd lift A1 @138+140 loop 12:00 PM
5 GRIL-SISA-STR - 12485 29-Jan-21 30-Jan-21 03+401 RHS Checking of reinforcement of abutment shaft wall 1st 12:00 PM
lift A2 @138+140 loop
6 GRIL-SISA-STR - 12486 29-Jan-21 30-Jan-21 03+401 RHS Checking of shuttering & Concrete pouring of 12:30 PM
abutment shaft wall 1st lift A2 @138+140 loop
Layout Checking & Excavation of MNB middle
7 GRIL-SISA-STR - 12487 29-Jan-21 30-Jan-21 126+830 portion approach slab A2 9:00 AM
9 GRIL-SISA-STR - 12489 29-Jan-21 30-Jan-21 137+333 RHS Layout Checking & Excavation of LVUP approach slab 8:00 AM
A1 side
10 GRIL-SISA-STR - 12490 29-Jan-21 30-Jan-21 137+333 RHS Bed level checking & PCC Laying of LVUP approach 10:00 AM
slab A1 side
Checking of reinforcement of LVUP deck slab at
11 GRIL-SISA-STR - 12491 29-Jan-21 30-Jan-21 137+333 RHS median side 10:00 AM
13 GRIL-SISA-STR - 12493 29-Jan-21 30-Jan-21 138+140 Checking of reinforcement of precast crash barrier 3:00 PM
friction slab no.18 loop
14 GRIL-SISA-STR - 12494 29-Jan-21 30-Jan-21 138+140 Checking of shuttering & Concrete pouring of precast 3:30 PM
crash barrier friction slab no.18 loop
Layout Checking & Excavation of LVUP approach slab
15 GRIL-SISA-STR - 12495 29-Jan-21 30-Jan-21 143+063 RHS A1 & A2 8:00 AM
16 GRIL-SISA-STR - 12496 29-Jan-21 30-Jan-21 143+063 RHS Bed level checking & PCC Laying of LVUP approach 10:00 AM
slab A1 & A2
17 GRIL-SISA-STR - 12497 29-Jan-21 30-Jan-21 143+351 RHS Layout Checking & Excavation of MNB approach slab 8:00 AM
A1 & A2
18 GRIL-SISA-STR - 12498 29-Jan-21 30-Jan-21 143+351 RHS Bed level checking & PCC Laying of MNB approach 9:30 AM
slab A1 & A2
Checking of reinforcement of Box culvert U-trough
19 GRIL-SISA-STR - 12499 29-Jan-21 30-Jan-21 147+980 LHS raft (MCW) 8:00 AM
20 GRIL-SISA-STR - 12500 29-Jan-21 30-Jan-21 147+980 LHS Checking of shuttering & Concrete pouring of Box 8:30 AM
culvert U-trough raft (MCW)
21 GRIL-SISA-STR - 12501 29-Jan-21 30-Jan-21 147+980 RHS Checking of reinforcement of Box culvert U-trough 8:00 AM
raft (S.R)
Checking of shuttering & Concrete pouring of Box
22 GRIL-SISA-STR - 12502 29-Jan-21 30-Jan-21 147+980 RHS 8:30 AM
culvert U-trough raft (S.R)
Checking of reinforcement PUP deck slab crash
23 GRIL-SISA-STR - 12503 29-Jan-21 30-Jan-21 148+730 LHS barrier 10:00 AM
24 GRIL-SISA-STR - 12504 29-Jan-21 30-Jan-21 148+730 LHS Checking of shuttering & Concrete pouring PUP deck 10:30 AM
slab crash barrier
25 GRIL-SISA-STR - 12505 29-Jan-21 30-Jan-21 158+050 LHS Checking of shuttering & Concrete pouring of 3X3 11:00 AM
Box culvert curtain wall 2nd lift (MCW)
26 GRIL-SISA-STR - 12506 29-Jan-21 30-Jan-21 158+535 LHS Checking of reinforcement of MNB slab (S.R) 12:00 PM
28 GRIL-SISA-STR - 12508 29-Jan-21 30-Jan-21 162+490 LHS Checking of shuttering & Concrete pouring of U- 2:00 PM
trough wall 1st lift (MCW)
29 GRIL-SISA-STR - 12509 29-Jan-21 30-Jan-21 162+490 LHS Checking of reinforcement of 2X2 Box culvert U- 3:00 PM
trough wall 2nd lift outer side
30 GRIL-SISA-STR - 12510 29-Jan-21 30-Jan-21 162+490 LHS Checking of shuttering & Concrete pouring of 2X2 3:30 PM
Box culvert U-trough wall 2nd lift outer side
Layout Checking & Excavation of 3X3 Box culvert
31 GRIL-SISA-STR - 12511 29-Jan-21 30-Jan-21 163+410 LHS curtain wall outer side 8:00 AM
32 GRIL-SISA-STR - 12512 29-Jan-21 30-Jan-21 163+410 LHS Bed level checking & PCC Laying of 3X3 Box culvert 10:00 AM
curtain wall outer side
Checking of shuttering & Concrete pouring of 3X3
33 GRIL-SISA-STR - 12513 29-Jan-21 30-Jan-21 163+410 LHS 4:00 PM
Box culvert curtain wall 1st lift outer side (S.R)
34 GRIL-SISA-STR - 12514 29-Jan-21 30-Jan-21 163+850 LHS Layout Checking & Excavation of Box Culvert U- 2:00 PM
trough (MCW)
Bed level checking & PCC Laying of Box Culvert U-
35 GRIL-SISA-STR - 12515 29-Jan-21 30-Jan-21 163+850 LHS trough (MCW) 2:30 PM