h (m) Jenis NSPT Lapisan Jenis Kedalaman

1 CLAY 1 1 CLAY 0.00 - 17.50


2 CLAY 1 2 SAND 17.50 - 20.50
3 CLAY 1 MAT = 2.5 3 CLAY 20.50 - 29.00
4 CLAY 1 4 SAND 29.00 - 35.50
5 CLAY 1 5 CLAY 35.50 - 60.50
6 CLAY 1
7 CLAY 1
8 CLAY 1
9 CLAY 1 40
10 CLAY 1
11 CLAY 1
12 CLAY 1
13 CLAY 1
CLAY 1
CLAY 1
CLAY 1
CLAY 1
CLAY 1.5 1
SAND 4
SAND 12
SAND 18
SAND 20 14
CLAY 26
CLAY 32
CLAY 26
CLAY 22
CLAY 26
CLAY 31
CLAY 22
CLAY 22
CLAY 32 27
SAND 50
SAND 50
SAND 50
SAND 50
SAND 50
SAND 50
SAND 36 48
CLAY 25
CLAY 24
CLAY 22
CLAY 23
CLAY 24
CLAY 22
CLAY 20
CLAY 26
CLAY 28
CLAY 29.5
CLAY 31
CLAY 30
CLAY 29
CLAY 30
CLAY 31
CLAY 32
CLAY 33
CLAY 31
CLAY 28
CLAY 29.5
CLAY 31
CLAY 30
CLAY 29
CLAY 28
CLAY 27 27.72
Selisih NSPT
17.5 1
3 14
8.5 27
6.5 48
25 28
SSP
E 200000 Mpa = N/mm2 200000000 kN/m2
A 76.12 cm2 0.007612 m2

EA 1522400 kN
l 0.4 m
EA/m 3806000 kN/m

E 200000 Mpa = N/mm2 200000000 kN/m2


WF400x200 A 84.1 cm2 0.00841 m2
HB400 A 215 cm2 0.0215 m3

EA 1.68E+06 kN
EA 4.30E+06 kN

Bidang 2
h (m) 0.8 1 0.7 0.55 0.7 0.13 0.1
b (m) 1 1 1 1 1 1 1
s (m) 1 1 1 1 1 1 1
EA (kN/m) #VALUE! 2.53E+07 1.77E+07 1.39E+07 1.77E+07 3.29E+06 ###
EI (kNm2/m) #VALUE! 1.67E+04 #VALUE! 2.77E+06 #VALUE! 0.00E+00 ###
w (kN/m/m) 19.2 24 16.8 13.2 16.8 3.12 2.4

v beton 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.01


CCSP
E 200000 Mpa = N/mm2 2E+08 kN/m2
A 76.12 cm2 0.007612 m2

EA 1.52E+06 kN
L 0.4 m
EA/L 3806000 kN/m

CCSP W450

I 353363 cm4 0.003534 m4


A 1835 cm2 0.1835 m2
fc' 62 Mpa
E 37007.84 Mpa 37007837 kN/m2
EA 6.79E+06 kN
L 0.996 m
EA/L 6818211 kN/m

459 kg/m 4.59 kN/m


4.61 kN/m/m

0.01
w
w/L
DPT 2
K- 350
fc' (Mpa) 29.05
E (Mpa) 25332.08
E (kN/m2) 2.53E+07
Bidang 1
h (m) 4.45
b atas (m) 0.3
b bawah (m) 0.55
A (m2) 0.55625
EA (kN/m) 1.41E+07
EI (kNm2/m) 7.68E+07
w (kN/m/m) 13.35
Bidang 2
h (m) 0.55
b (m) 3.8
s (m)
EA (kN/m) 5.29E+07
EI (kNm2/m) 1.33E+06
w (kN/m/m) 50.16
Bidang 3
h (m) 0.55
b atas (m) 0.5
b bawah (m) 0.8
A (m2) 0.0825
EA (kN/m) 2.09E+06
EI (kNm2/m) 2.28E+05
w (kN/m/m) 1.98
v beton 0.15
Rigid Rigid LeMBAR Baja Borepile Minipile Minipile
450 450 450
37.35 28 28 fc' (Mpa) 30 30 30
28723.88 24870.06 200000.00 E (Mpa) 25742.9602027 25742.9602027 25742.9602027
2.87E+07 2.49E+07 2.00E+08 E (kN/m2) 25742960.2027 25742960.2027 25742960.2027

D = s (m) 0.8 0.2 0.25


A (m2) 0.50265482457 0.04 0.0625

EA (kN/m) 1.29E+07 1.03E+06 1.61E+06

0.3 0.15 0.02


10.8 0.77 1.2 200000000 2.00E+08
10.8 0.77 1.2 0.01878 5.36E-04
3.24 0.1155 0.024 3756000 1.07E+05 ei
9.31E+07 2.87E+06 4.80E+06
6.98E+05 5.39E+03 1.60E+02
77.76 2.772 1.88E+03 7.85E+03
0.15 0 0.2 7.85E+04
Minipile

30 Mpa
25742.9602027 Mpa
25742960.2027 kN/m2

0.4 m
0.16 m2
1

4.12E+06 kN

2
3
Soil cref Eref gsat g'
Layer Type Depth (m) Dh (m) N Value (kN/m 2 f (0) (kN/m2)
v (nu) kx (m/day) ky (m/day)
) (kN/m3) (kN/m3)
1 CLAY 0 - 11 11 1 4.91 17 737 17 15 0.35 1E-07 1E-07
2 SAND 11 - 15 4 14 5.00 28 9450 20 18 0.3 0.001 0.001
3 CLAY 15 - 19 4 27 5.00 30 750 20 18 0.35 1E-07 1E-07
4 SAND 19 - 29 10 48 5.00 35 33600 20 18 0.3 0.001 0.001
5 CLAY 29 - 50 21 28 8.00 25 1200 20 18 0.35 1E-07 1E-07

Yang digunakan di plaxis


Beban Normal c clay = 3 x N

Soil cref Eref gsat g'


Layer Type Depth (m) Dh (m) N Value (kN/m 2 f (0) (kN/m2)
v (nu) Drained kx (m/day) ky (m/day)
) (kN/m3) (kN/m3)

1 CLAY 0 - 11 11 1.03 3.08 5 463 17 15 0.35 Undrained 1E-07 1E-07


2 SAND 11 - 15 4 13.50 5.00 33 9450 20 18 0.3 Drained 0.001 0.001
3 CLAY 15 - 19 4 26.56 79.67 5 19917 20 18 0.35 Undrained 1E-07 1E-07
4 SAND 19 - 29 10 48.00 5.00 44 33600 20 18 0.3 Drained 0.001 0.001
5 CLAY 29 - 50 21 27.72 83.16 5 20790 20 18 0.35 Undrained 1E-07 1E-07

Timbunan 10 30 750 18 16

g' dibuat (gsat - 2) karna tidak ada tanah yang kering oven di lapangan (di buku rumusnya gsat - gw)

Beban Gempa
Soil cref gsat g'
Layer Depth (m) Dh (m) N Value f (0) Eref (kN/m2) v (nu) Drained kx (m/day) ky (m/day)
Type (kN/m2) (kN/m3) (kN/m3)

1 CLAY 0 - 11 11 1 3.0833333 5 462.5 17 15 0.35 Undrained 1E-07 1E-07


2 SAND 11 - 15 4 14 5 33 9450 20 18 0.3 Drained 0.001 0.001
3 CLAY 15 - 19 4 27 79.666667 5 19916.667 20 18 0.35 Undrained 1E-07 1E-07
4 SAND 19 - 29 10 48 5 44 33600 20 18 0.3 Drained 0.001 0.001
5 CLAY 29 - 50 21 28 83.16 5 20790 20 18 0.35 Undrained 1E-07 1E-07
Parameter
BJ Beton 24 kN/m3 30 14.5 15.5
BJ Tanah Timbunan 17 kN/m3 1.890243902
BJ Tanah Dasar 16 kN/m3 0.35 5.9 16.85714286
H wall 5.9 m
H footing 0.7 m
H timb atas 2.5 m
H total 9.1 m

H pasif 1m

Berat Lengan Momen


No b h BI Bentuk Dinding Momen Tahanan
(kN) (m) (kNm)
1 1 0.7 24 Persegi 16.80 0.50 8.40
2 3.6 0.7 24 Persegi 60.48 2.80 169.34
3 0.35 5.9 24 Persegi 49.56 1.18 58.23
4 0.35 5.9 24 Segitiga 24.78 1.47 36.34
5 2.9 5.9 17 Persegi 290.87 3.15 916.24
6 0.35 5.9 17 Segitiga 17.55 1.58 27.79
7 3.25 2.5 17 Segitiga 69.06 3.87 267.04
7 0.8 0.5 24 Trapesium 7.80 4.35 33.93
Total 536.91 1517.32

Beban Merata
q = 15 kN/m
hs = q/ɣ = 0.882 m2 ?
Pa1 = Ka*ɣ*hs*H = 20.074 kN ?

Perhitungan Tekanan Tanah


c 10
ɸ 30 °
β 33.68 °
0.3333
234.628 kN

Nilai Beban Lengan M0


No MR (kN.m)
(kN) Momen (m) (kN.m)
1 16.80 0.50 8.40
2 60.48 2.80 169.34
3 49.56 1.18 58.23
4 24.78 1.47 36.34
5 290.87 3.15 916.24
6 17.55 1.58 27.79
7 69.06 3.87 267.04
8 7.80 4.35 33.93
Pp 24.00 0.33 8.00
Pa.sin B 78.39 3.03 237.77
Pa.cos B 117.58 3.03 356.67
Pa1 37.86 4.55 172.26
Total 528.93 1763.09

Kp = tan^2(45+ϕ/2) = 3
Pp = 0.5*Kp*ɣ*H^2 = 24.00 kN
Faktor Keamanan terhadap Guling (Overturning)

SF = 3.333 > 2
OK
Faktor Keamanan terhadap Geser (Sliding)
Gaya Geser (Vo)= 254.702 kN
Gaya Penahanan= 346.143 kN ?

SF = 1.3590 < 1.5


NOT OK