Ongoing Improvements To Mine Planning
Ongoing Improvements To Mine Planning
Ongoing Improvements To Mine Planning
The site geologist presented Maptek™ basis for forecasting. ROM HARP capabilities allow a simple
with the challenge of finding a quick and specification-based set of rules for:
flexible method for evaluating potential Conducting the process >> coal and waste quality compositing;
run of mine (ROM) working sections,
while calculating yield weighted product
entirely within Vulcan >> loss, dilution and recovery
tonnages for different moisture bases. eliminates risk associated incorporation; and
with data import and export. >> seam combination.
Moreover, a ‘black box’ approach was
to be avoided, and all results needed As well as weekly forecasting reserves,
to be checked visually and statistically end of month, quarterly and annual
prior to use. reconciliations could be handled more
simply. Errors in initial assumptions were
able to be resolved quickly and easily.
It was crucial to create an output HARP The first pass output HARP model This product tonnage was reported
model representing what is actually contained yield values calculated at alongside the required working section
mined in the pit, while also allowing all 6% moisture using supplied regression weighted qualities. This will now
of the input parameters to be supplied equations for each of the 150 plies. form the input for ongoing planning
as constants or existing HARP model The final ROM HARP process was processes at Glendell mine.
variables. then run. It included all of the relevant The solution is encapsulated within a
weighting rules for quality and mining single script. ‘What if’ scenarios can be
The method parameters as well as the ROM run simply by changing parameters for
The procedure was encompassed in a parameters themselves (minimum mining or weighting.
single script, run from a Vulcan command mineable thickness, minimum separable
shell. Run time for the production model parting and product to waste ratio). Vulcan HARP modelling allows
was around 20 minutes. operations to easily run reserves.
This resulted in the output ROM HARP Visualisation and validation of results
The first step was to add variables to model. gives everyone involved confidence in the
the input HARP model to calculate and mine planning process.
A further script then evaluated the
store loss and dilution parameters as
available data based on 9% product Thanks to
a proportion of the resultant working
moisture and calculated the product Daniel Saunders, Geologist
section thicknesses. This required a Glendell Coal Mine
tonnages within each block based on
precalculation run of the ROM HARP
these new yield values.
model thicknesses.