CALCULATION OF ACTUAL AREA FOR BLASTING & PAINTING OF CARBON STEEL PIPE, ELBOW AND WN FLANGE

No. Description SR No. MSR No. Length (m) Quantity OD (mm) Area (m2) Total Area (m2)
Pipe 3.705 - 33.4 0.389 0.389
1 To replace V-41 and V-42 sampling point SR-61 002410 90° Bend-Elbow 12 - 0.006 0.072 1 layer 3 layers
WN Flange 12 - 0.026 0.312 0.773 2.32 m2
Pipe 0.56 - 33.4 0.059 0.059
2 To replace  T-42 1'' pipeline at ETP SR-63 002412 90° Bend-Elbow 1 - 0.006 0.006 1 layer 3 layers
WN Flange 2 - 0.026 0.052 0.117 0.35 m2
Pipe 6 - 60.3 1.137 1.137
3 Fabricate and install new sampling tray and secondary valve at SR-131 002404 90° Bend-Elbow 3 - 0.023 0.069 1 layer 3 layers
WN Flange 3 - 0.049 0.147 1.353 4.06 m2
Sectional replacement of severe corroded 2" process pipe (50- Pipe 5 - 60.3 0.947 0.947 1 layer 3 layers
4 SR-140 002405
UA-4001-1101) at ETP 45° Bend-Elbow 1 - 0.011 0.011 0.958 2.87 m2