OMV (PAKISTAN) GmbH DOCUMENT NO: 2027-11-13-16-CL-001

MIANO-17 (NFO-01) WELLHEAD DEVELOPMENT PROJECT PAGE : 4 of 5

BEARING PRESSURE AND BUOYANCY REV: D1

CALCULATIONS-FLOWLINES DATE: 7-Jul-14

ATTACHMENT A
INPUT DATA:

Description Units Values

rs = Maximum Dry Soil Density lb/ft3 100.500 (Geotechnical investigation


along pipeline route from
KN/m3 15.785 khipro-1 to Kadhanwari Gas
Plant Page # 22, Table-1, Sheet
02 of 02, September 1999)

rw = Water Density lb/ft3 62.429 (universal constant )


KN/m3 9.805

rsub = Submerged Soil Density lb/ft3 60.000 (Taken from 2024 -11-13-16-
CL-001- D1 Bearing Pressure &
Buoyancy Calculation for
Miano-16)
KN/m3 9.424

(fixed density of carbon


rp = Pipe Density lb/ft3 490.063 steel)

KN/m3 76.970

qnet1 = Net allowable Bearing Capacity of dry Soil Kg/cm2 0.650


(Geotechnical investigation
KN/m2 63.743 along pipeline route from
khipro-1 to Kadhanwari Gas
Plant Page # 22, Table-1, Sheet
02 of 02, September 1999)

Net allowable Bearing Capacity (Taken from 2024 -11-13-16-


0.300
of submerged soil CL-001- D1 Bearing Pressure &
Buoyancy Calculation for
qnet2 = Kg/cm2 Miano-11)

KN/m2 29.420

hs = Maximum depth of pipe m 1.400

qgross1 = Gross allowable Bearing Capacity of dry Soil


= qnet1 + Dry Soil Density x Depth KN/m2 85.841

Gross allowable Bearing Capacity of


qgross2 = submerged Soil
= qnet2 + Submerged Soil Density x Depth KN/m2 42.613

6" FLOWLINE
Outer Dia (D1) mm 168.275
Outer Dia (D1) m 0.168
Coating Thickness (t1) mm 2.500
Thickness of Pipe (t2) mm 9.500
Outer Dia with coating thk. (D2) m 0.173
Inner Dia (D3) mm 149.275
Inner Dia (D3) m 0.149
Empty Pipe Weight / Length (W1) KN/m 0.365
Water Filled Pipe Weight / Length (W2) KN/m 0.536

A- Bearing Pressure Check

Case - 1 : Dry Soil on pipe and dry soil at trench bottom

Dry Soil Weight (KN/m) = WS = rs x VS KN/m 3.829


Where VS = Volume of dry Soil on pipe/Meter
= rs x hs x D2

Total Vertical Load (KN/m) = P = W2 + WS KN/m 4.365

Projected Area / Meter (m2) = A = D2 x 1 m2 0.173


OMV (PAKISTAN) GmbH DOCUMENT NO: 2027-11-13-16-CL-001

MIANO-17 (NFO-01) WELLHEAD DEVELOPMENT PROJECT PAGE : 5 of 5

BEARING PRESSURE AND BUOYANCY REV: A1

CALCULATIONS-FLOWLINES DATE: 7-Jul-14

Maximum Pressure on Soil (KN/m2) = qmax = P/A 25.192

= qmax < qgross1 1


Hence "OK"
Case - 2 : Dry soil on pipe and submerged soil at trench bottom

Dry Soil Weight (KN/m) = WS = rs x VS KN/m 3.829


Where VS = Volume of Soil/Meter
= rs x hs x D2

Total Vertical Load (KN/m) = P = W2 + WS KN/m 4.365

Projected Area / Meter (m2) = A = D2 x l m2 0.173

Maximum Pressure on Soil (KN/m2) = qmax = P/A 25.192

= qmax < qgross2 1


Hence "OK"
Case - 3 : Submerged soil on pipe and submerged soil at trench bottom

Submerged Soil Weight (KN/m) = WS = rsub x VS KN/m 2.286


Where VS = Volume of Soil/Meter
= rsub x hs x D2

Total Vertical Load (KN/m) = P = W2 + WS KN/m 2.822

Projected Area / Meter (m2) = A = D x l m2 0.173

Maximum Pressure on Soil (KN/m2) = qmax = P/A 16.287

= qmax < qgross2 1


Hence "OK"

B- Buoyancy Check

Assuming Pipe is submerged and Empty


Buoyant Force / Meter (KN) = Fb = rw x p/4 (D2)2 KN/m 0.231

Balancing Force (KN/m) = Wb = W1 + Submerged Soil Weight KN/m =0.365+9.424*0.173*h1


= Wb = W1 + rsub x Volume of Submerged Soil/Meter
= W1 + rsub x h1 x D2 KN/m = 0.365+ 1.63h1

Factor of Safety = FOSa 1.5

FOSa = Wb/Fb 1.5= (0.365+1.63*h1) / 0.231

Depth of Cover required (h1) Meter -0.011

Min. Depth of Cover on Pipe (H2) Meter 1.4

= h1 < H2 1
Hence "OK"