A 14-01-2020 For Review Wa’el Al Renato Ivan

Bayoumi Alves Rodriguez


Rev Date Issue, Modification Created By Checked By Approved By

SHUQAIQ 3 INDEPENDENT WATER PROJECT

INSPECTION AND TEST PLAN


STEEL STRUCTURE - ERECTION
SA04C2-00-WG-I-00111

SA04C2-00-WG-I-00111-A
SWRO SHUQAIQ 3 Plant :
SA04C2-00-WG-I-00111-A

Inspection and Test Plan


Steel Structure
SWRO SHUQAIQ 3 Plant
Subcontractor Logo
INSPECTION AND TEST PLAN (ITP) - STEEL STRUCTURE - ERECTION
Project Name SHUQAIQ 3 INDEPENDENT WATER PROJECT Document ID No. SA04C2-00-WG-I-00111
Company Page 1 of 2
ITP Number SA04C2-00-WG-I-00111 REV. A Rev. A
Date 14-01-2020 Date Of Issue 14-01-2020

Inspection By Remarks
Activity
Activity / Inspection Type of Inspection Acceptance Criteria Frequency Standard/ Specification / Drawing Record Sub
Number Acciona Client
Contractor

1. PRE-PROCESS CONTROL

General Arrangement Drawings Document


1,1 Project Specifications 100% Project Specifications Approved Drawings H R I
(Erection Drawings) review

Document Project Specifications Project Specifications Approved Method


1,2 Method Statement for Erection 100% H R I
review Drawings Drawings Statement

Material Receiving Inspection (Bolts, Document Project Specifications Project Specifications


1,3 100% Material Certificate H W I
Painting, etc.) review/ Visual Approved Method Statement Approved Method Statement

Fabricated Material Receiving Document Quality Control


1,4 Inspection Release Note 100% Approved Drawings H R I
Inspection review/ Visual Dossier

2. STEEL STRUCTURE INSTALLATION

Foundation Clearance
(Check for survey of line, level, anchor Inspection/
2,1 Approved Drawing 100% Approved Drawing Survey report H S S
bolts position & protruding length. Survey
Check for condition and slackness)

Chipping the concrete then cleanning


2,2 under the base plates in order to Visual Approved Drawing 100% Approved Drawings Inspection Report H S S
assure the grout adherance

Dimensional Control, Alignment and Inspection/


2,2 Approved Drawing 100% Approved Drawings Inspection Report H W S
Levelling Survey

Approved Method Statement for Erection Approved Method Statement for Erection
2,3 Bolt Tightening Visual 10% Inspection Report H W S
Approved Drawing Approved Drawing

Visual, DFT Approved Procedure for Touch Up Painting Approved Procedure for Touch Up Painting
2,4 Touch-up Paint Random Inspection Report H W S
Measurments Manufacturar Recommendations Manufacturar Recommendations

Page 1 de 2
3. FINAL INSPECTION

Approved Method Statement for Erection Approved Method Statement for Erection Final Inspection
3,1 Final Inspection and Handover Visual 100% H W I
Approved Drawing Approved Drawing Report

Legend; H - Hold; W - Witness; R - Document Review; S - Spot Inspection; A - Approval; I - Information;


This ITP meets the requirements of the SWRO SHUQAIQ 3 Plant Specifications and the minimum requirements of Indicative Inspection Test Plan

SUBCONTRACTOR ACCIONA CLIENT

Approved: Approved: Approved:


Date: Date: Date:

Page 2 de 2