SA04C2-00-WG-I-00111-A
SWRO SHUQAIQ 3 Plant :
SA04C2-00-WG-I-00111-A
Inspection By Remarks
Activity
Activity / Inspection Type of Inspection Acceptance Criteria Frequency Standard/ Specification / Drawing Record Sub
Number Acciona Client
Contractor
1. PRE-PROCESS CONTROL
Foundation Clearance
(Check for survey of line, level, anchor Inspection/
2,1 Approved Drawing 100% Approved Drawing Survey report H S S
bolts position & protruding length. Survey
Check for condition and slackness)
Approved Method Statement for Erection Approved Method Statement for Erection
2,3 Bolt Tightening Visual 10% Inspection Report H W S
Approved Drawing Approved Drawing
Visual, DFT Approved Procedure for Touch Up Painting Approved Procedure for Touch Up Painting
2,4 Touch-up Paint Random Inspection Report H W S
Measurments Manufacturar Recommendations Manufacturar Recommendations
Page 1 de 2
3. FINAL INSPECTION
Approved Method Statement for Erection Approved Method Statement for Erection Final Inspection
3,1 Final Inspection and Handover Visual 100% H W I
Approved Drawing Approved Drawing Report
Page 2 de 2