Riverside Borehole Drilling provided a quotation to Ms. Melody for borehole services at a location in Chitungwiza, Zimbabwe. The quotation included 4 steps: 1) a borehole survey for $100, 2) 40m borehole drilling for $1,300, 3) installation of concrete, solar panels, pumps, and accessories for $2,500, and 4) installation of a 5,000L water tank and stand for $1,100, for a total of $5,000.
Riverside Borehole Drilling provided a quotation to Ms. Melody for borehole services at a location in Chitungwiza, Zimbabwe. The quotation included 4 steps: 1) a borehole survey for $100, 2) 40m borehole drilling for $1,300, 3) installation of concrete, solar panels, pumps, and accessories for $2,500, and 4) installation of a 5,000L water tank and stand for $1,100, for a total of $5,000.
Riverside Borehole Drilling provided a quotation to Ms. Melody for borehole services at a location in Chitungwiza, Zimbabwe. The quotation included 4 steps: 1) a borehole survey for $100, 2) 40m borehole drilling for $1,300, 3) installation of concrete, solar panels, pumps, and accessories for $2,500, and 4) installation of a 5,000L water tank and stand for $1,100, for a total of $5,000.
DATE :24/1/2021 CLIENT NAME: Ms. Melody LOCATION: Chitungwiza
ITEM DESCRIPTION QUANTITY AMOUNT TOTAL
STEP 1 1 $ 100.00 $ 100.00 SITING Borehole survey for the purpose of locating underground water. Our survey report gives you detailed rock formation and the expected depth at which water can be struck STEP 2 Borehole 40m borehole drilling including single 1 $ 1 300.00 $ 1 300.00 drilling pvc class 9casings (140mm). Quoted price excludes double casings(180mm). Cost of double casings is $25/m.
Drilling beyond 40m i.e. (40m-80m) its
$40/m Drilling beyond 80m i.e. (80m -120m) its $50/m If the borehole collapses, extra charges will be asked for on the site.
STEP 3 Installation of concretes, solar panels, 1 $ 2 500 $ 2 500