Dubai International Airport “ICAO: OMDB IATA: DXB” Dubai International Airport is the primary international airport which is serving Dubai. It is situated in the AI Garhoud district, 2.5 nautical miles (4.6km; 2.9ml) east of Dubai and spread over an area of 3,100 acres (1,250 ha) of land.
Name of the Airport Operator:
The airport is operated by the Dubai Airports Company which is the home base of Dubai’s international airlines which are Emirates and FlyDubai. The owner is the Government of Dubai. Past back in the January 2016, there were over 7,700 weekly flights operated by 140 airlines to over 270 destinations across all developed area.
Management and Operational Structures:
Paul Griffiths is Chief Executive Officer of Dubai Airports with the responsibility for operations and the development of the Dubai International as well as Dubai World Central. He did launch the Terminal 3 at Dubai International on June 27, 2010, which was successfully opened the emirate’s second airport which is Dubai World Central. He did achieve another discovery in Dubai’s aviation history on January 2, 2013, with an opening of Hall A. Furthermore, The Dubai Government selected Bechtel to design, manage and complete Dubai International Airport construction for improved airport operations. The 10 years plan for a great upgrade varied sets of components which does includes satellite with 28 gates, 42 loading bridges and 221 check in countries as about 1.3 million square feet(120, 770 square meters) which is duty-free and speciality shops, a 100 room, five-star luxurious hotel, conference, entertainment centres and restaurants. Bechtel’s role was as a designer, project manager and construction manager for the airport and runway system, terminals, access roadways, parking facilities, and a cargo complex. Some Constructional facts about the Dubai International Airport is as major aprons and taxiways to support the new satellite concourse. Furthermore, a Charter Terminal which does handle more than 500 passengers per hour. A new 13,000-foot (4,000 meter) runway and taxi system, which does includes state of the art navigational ads and computerized airfield computer system. There’s a cargo and free trade zone complex. It is providing the new automated baggage handling system. Besides, there’s a new traffic control tower, a fuel farm, a central utility plant, fire stations and associated airside facilities. Therefore, they did planned all construction activities to minimize the impact on existing airport operations.
Airport Primary Activities:
For
Runway (PCN, Length and Configuration):
The length of Dubai International Airport’s runway is 055-21-51.8362E
Types Of NAVAIDS available:
RFFS Category:
Noise Abatement Program:
In Dubai International Airport there was ten unattended noise monitoring station were set up to monitor air traffic arriving into and departing from Dubai. The noise monitoring stations were installed at the end of the each runway. Therefore, According to the news article Dubai International Airport reduces the noise pollution as back in the past on June 2, 2010 on this day Dubai Airport did announced their points that how can they improve the Dubai International’s ambiance from both inside and out by reducing noise and discharge to the benefit of costumers. Besides, they did worked closely with their customer airlines to limit announcements to a maximum of two per flight
Description of the passenger terminal building and the configuration:
Types of ground transportation available to access the airport: