Technical Clarification Form For Provision of Maintenance Service of Liquid Sulfur Pool

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Tender:.

048/SC/20

Technical Clarification Form for Provision of Maintenance Service of Liquid Sulfur Pool
Item Clarification from Bidder Response form WAPEC
SOW mentioned the equipment above the sulfur pool should be removed
and reassembled after completion by our team? According to our site
visit the site supervisor informs us that all pumps and equipment are The Bubble Column size is 1200mm IDX1200mm. The Sulfur Pumps and concrete covers need to be removed
1
already isolated from power and no need to remove any equipment ? if want to lift out the Bubble Column.
please confirm to us the equipment removal issue ?.

Please send a clear copy of P&ID for sulfur pool , the Picture 1 (Sulfur Please see attached PID- Sulfur Recovery Unit page 12 and 13 for Sulfur Pool P&ID and Sulfur Pit Found
2
recovery unit –liquid sulfur pool) in ITB is not clear . Details for its details.
Please confirm to our company , operation condition of sulfur pool and
3 steam coil (Temp ,Press) to design a suitable technical plan for Sulfur Pit and steam coil operation condition: ATM, @ 159 ℃
maintenance for sulfur pit .
4
5
6

END OF SECTION