19008-18 Contractor JV's Request For Provision of Required Foundation - Retaining Structure For Gantry Structure.
19008-18 Contractor JV's Request For Provision of Required Foundation - Retaining Structure For Gantry Structure.
Dated: 25-01-2021
Kurram Tangi Dam Consultants
in joint venture with
MML, PES and CEC
Mr. Usman Shamim (Incharge TEC)
MMP Consultants
Lahore
Ref: Contractor JV’s Letter No. PM/JV/KTMD/FEB/021/3953 Dated 17th Jan, 2021
(Copy Attached)
Please find enclosed layout plan of PH-IV, Switchyard, Tailrace & Access Road
submitted by Contractor JV vide letter referred above, regarding provision of required
foundation/ retaining structure for gantry structure.
The observation conveyed by the Contractor JV need to be addressed, except the
issue regarding access road toward Switchyard of PH-IV which will be addressed in shop
drawings as per site conditions.
Your office is requested to get the subject design proposal reviewed and provide
design recommendations to ensure the overall stability of the Gantry Structure.
Alternately meeting with Contractor JV representative may be convened at Lahore, to
resolve the matter at earliest possible, please.
Tahir Malik
Chief Resident Engineer
Cc:
• General Manager (P) North WAPDA, Wapda House Peshawar.
• PM FWO-Descon JV Spinwam.
• Chief Engineer / PD KTDP Wapda Bannu.
• General Manager (T) MMP Consultants Lahore.
• Project Coordinator KTDP Consultants Lahore.
• Resident Engineer (Civil) KTDP Consultants Spinwam.
• Mr. Zubair Zafar (QAE/M) KTDP Consultants Spinwam.
• Mr. Faiz Hanif Sendhu (Tunnel Expert) KTDP Consultants Spinwam.
• Mr. Murad Lakho (ARE Mechanical) KTDP Consultants Spinwam, for follow
up, please.
• Mr. Asif Bangash (Sr. DE) KTDP Consultants Bannu.
• Mr. Sohail Qureshi (EE) KTDP Consultants Bannu.