NAMA : KURNIA MARTIN

NPM : 16.14.1.0044
QUIZ MODEL DISKRIT

KASUS MACHINE SHOP MODEL

Job Arrival Number Operation Machine Operati


Number Number Of Number Require on
Operation Time
1 8 4 1 E 9
2 C 8
3 A 6
4 D 8
2 7 4 1 B 6
2 C 11
3 D 12
4 A 9
3 3 4 1 D 9
2 B 8
3 A 6
4 E 9
4 5 4 1 E 9
2 A 11
3 D 5
4 B 12

1. Menentukan Phase Mesin


 Phase Machine A
A-Phase B-Phase C-Phase
Clock Time Bound Events/ Conditional Events
Activity
Ended
8 Arrival Of Job 1 1st Operation On Job 1 (A) -> End at Time 6
7 Arrival Of Job 2 2nd Operation On Job 2 (A) -> End at Time 9
3 Arrival Of Job 3 3rd Operation On Job 3 (A) -> End at Time 6
5 Arrival Of Job 4 4th Operation On Job 4 (A) -> End at Time 11

 Phase Machine B
A-Phase B-Phase C-Phase
Clock Time Bound Events/ Conditional Events
Activity
Ended
8 Arrival Of Job 1 -
st
7 Arrival Of Job 2 1 Operation On Job 2 (B) -> End at Time 6
3 Arrival Of Job 3 2nd Operation On Job 3 (B) -> End at Time 8
5 Arrival Of Job 4 3rd Operation On Job 4 (B) -> End at Time 12
 Phase Machine C
A-Phase B-Phase C-Phase
Clock Time Bound Events/ Conditional Events
Activity
Ended
8 Arrival Of Job 1 1st Operation On Job 1 (C) -> End at Time 8
7 Arrival Of Job 2 2nd Operation On Job 2 (C) -> End at Time 11
3 Arrival Of Job 3 -
5 Arrival Of Job 4 -

 Phase Machine D
A-Phase B-Phase C-Phase
Clock Time Bound Events/ Conditional Events
Activity
Ended
8 Arrival Of Job 1 1st Operation On Job 1 (D) -> End at Time 8
7 Arrival Of Job 2 2nd Operation On Job 2 (D) -> End at Time 12
3 Arrival Of Job 3 3rd Operation On Job 3 (D) -> End at Time 9
5 Arrival Of Job 4 4th Operation On Job 4 (D) -> End at Time 5

 Phase Machine E
A-Phase B-Phase C-Phase
Clock Time Bound Events/ Conditional Events
Activity
Ended
8 Arrival Of Job 1 1st Operation On Job 1 (E) -> End at Time 9
7 Arrival Of Job 2 -
nd
3 Arrival Of Job 3 2 Operation On Job 3 (E) -> End at Time 9
5 Arrival Of Job 4 3rd Operation On Job 4 (E) -> End at Time 9
NAMA : KURNIA MARTIN
NPM : 16.14.1.0044
TUGAS MODEL DISKRIT
2. Menentukan Timing Chart
 Timing Chart Saat t = 8
Machine Time in Hours
1234567891012345678910
A 8 J1/01 6
B -
C 8 J1/01 8
D 8 J1/01 8
E 8 J1/01 9

 Timing Chart Saat t = 7


Machine Time in Hours
1234567891012345678910
A 7 J2/02 9
B 7 J2/01 6
C 7 J2/02 11
D 7 J2/02 12
E -

 Timing Chart Saat t = 3


Machine Time in Hours
1234567891012345678910
A 3 J3/03 6
B 3 J3/02 8
C -
D 3 J3/03 9
E 3 J3/02 3

 Timing Chart Saat t = 5


Machine Time in Hours
1234567891012345678910
A 5 J4/04 11
B 5 J4/03 12
C -
D 5 J4/04 5
E 5 J4/03 9
NAMA : PUPUT PUTRIANI
NPM : 17.14.1.0048
TUGAS MODEL DISKRIT
3. Menentukan Waktu Operasi
 Saat t = 8
Waktu Operasi A = Waktu job selesai – Waktu job datang
=6–8
= -2

Waktu Operasi B = Waktu job selesai – Waktu job datang


=-

Waktu Operasi C = Waktu job selesai – Waktu job datang


=8–8
=0

Waktu Operasi D = Waktu job selesai – Waktu job datang


=8–8
=0

Waktu Operasi E = Waktu job selesai – Waktu job dating


=9–8
=1

 Saat t = 7
Waktu Operasi A = Waktu job selesai – Waktu job datang
=9–7
=2

Waktu Operasi B = Waktu job selesai – Waktu job datang


=6–7
= -1

Waktu Operasi C = Waktu job selesai – Waktu job datang


= 11 – 7
=4

Waktu Operasi D = Waktu job selesai – Waktu job datang


= 12 – 7
=5

Waktu Operasi E = Waktu job selesai – Waktu job datang


=-

 Saat t = 3
Waktu Operasi A = Waktu job selesai – Waktu job datang
=6–3
=3

Waktu Operasi B = Waktu job selesai – Waktu job datang


=8-3
=5

Waktu Operasi C = Waktu job selesai – Waktu job datang


=-

Waktu Operasi D = Waktu job selesai – Waktu job datang


=9–3
=6

Waktu Operasi E = Waktu job selesai – Waktu job datang


=3–3
=0

 Saat t = 5
Waktu Operasi A = Waktu job selesai – Waktu job datang
= 11 – 5
=6

Waktu Operasi B = Waktu job selesai – Waktu job datang


= 12 - 5
=7

Waktu Operasi C = Waktu job selesai – Waktu job datang


=-

Waktu Operasi D = Waktu job selesai – Waktu job datang


=5-5
=0

Waktu Operasi E = -Waktu job selesai – Waktu job dating


=9–5
=4

4. Utilitas Mesin
Utilitas Mesin = Waktu Kerja Komulatif
Total Waktu Observasi
= 128
12
= 11,5