Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 10

STAR Well (Well Simulation Analysis)

Form for Injection or Disposal Wells

Instructions:
1. Complete all information required as applicable.
2. Include any additional information in the Comments section.
3. Circle correct units of measure shown, or write in any other units of measure not shown as required.
4. Please include and attach a WELL COMPLETION DIAGRAM.

Customer Information Well General Information


Customer Date of Star Well Form
Contact Field & Well No.
Telephone Location
Email
Well Completion Information
Casing: Size (in / mm) Tubing: Size (in / mm)
Weight (lb/ft / kg/m) IJ or T&C?
Drift (in / mm) Connection OD (in / mm)
Packer: Type Set Depth, from Top (ft / m)
Setting Details
Static Well Conditions
Static Fluid Level, from Top (ft / m) Wellhead Temperature (°F / °C)
Static Fluid Density (lb/gal / Sp Gr) Bottom Hole Temperature (°F / °C)
Operating Conditions Integrity Annulus Testing
Fluid Level - Tubing, from Top (ft / m) Fluid Level - Tubing, from Top (ft / m)
Fluid Level - Annulus, from Top (ft / m) Fluid Level - Annulus, from Top (ft / m)
Fluid Density - Tubing (lb/gal / Sp Gr) Fluid Density - Tubing (lb/gal / Sp Gr)
Fluid Density - Annulus (lb/gal / Sp Gr) Fluid Density - Annulus (lb/gal / Sp Gr)
Fluid Temperature - Tubing (°F / °C) Fluid Temperature - Tubing (°F / °C)
Wellhead Pressure (psig / barg) Test Pressure - Annulus (psig / barg)
Comments:

Results and Recommendations:


m for Injection or Disposal Wells

Well General Information

Well Completion Information

Static Well Conditions

Integrity Annulus Testing

Comments:
STAR Well (Well Simulation Analysis)
Form for Production Wells

Instructions:
1. Complete all information required as applicable.
2. Include any additional information in the Comments section.
3. Circle correct units of measure shown, or write in any other units of measure not shown as required.
4. Please include and attach a WELL COMPLETION DIAGRAM.

Customer Information Well General Information


Customer: Date of Star Well Form:
Contact: Field & Well No.
Telephone: Location:
Email:
Lift Method
Rod Pump: ESP: PCP: Gas Lift: Other:
Well Completion Information
Casing: Size (in / mm) Tubing: Size (in / mm)
Weight (lb/ft / kg/m)
Drift (in / mm) 6.33" Connection OD (in / mm)
Tubing Anchor Used (Yes / No) Set Depth, from Top (ft / m)
Packer Used (Yes / No)
Electric Submersible Pump Information (if Applicable)
Pump Weight (lb / kg) Cable Weight (lb/ft / kg/m)
Pump OD (in / mm) Cable Thickness (in / mm)
Static Well Conditions
Static Fluid Level, from Top (ft / m) Wellhead Temperature (°F / °C)
Static Fluid Density (lb/gal / Sp Gr) Bottom Hole Temperature (°F / °C)
Operating Conditions
Fluid Level - Tubing, from Top (ft / m) Fluid Level - Annulus, from Top (ft / m)
Fluid Density - Tubing (lb/gal / Sp Gr) Fluid Density - Annulus (lb/gal / Sp Gr)
Fluid Temperature - Tubing (°F / °C) Wellhead Pressure (psig / barg)
Comments:

Results and Recommendations:


Form for Production Wells

Well General Information

Lift Method

Well Completion Information

mersible Pump Information (if Applicable)

Static Well Conditions

Operating Conditions

Comments:
STAR Well (Well Simulation Analysis)
Form for Fiberglass Casing Installation

Instructions:
1. Complete all information required as applicable.
2. Include any additional information in the Comments section.
3. Circle correct units of measure shown, or write in any other units of measure not shown as required.

Customer Information Well General Information


Customer Date of Star Well Form
Contact Field & Well No.
Telephone Location
Email
Casing Completion Information
Hole Size (in / mm)
GRP Casing Size (in / mm) GRP Casing Connection OD (in / mm)
GRP Casing Connection Type (IJ or T&C) Casing Set Depth, from Top (ft / m)
Static Well Conditions
Static Fluid Level, from Top (ft / m) Wellhead Temperature (°F / °C)
Static Fluid Density (lb/gal / Sp Gr) Bottom Hole Temperature (°F / °C)
Cementing Conditions
Fluid Level - Casing, from Top (ft / m) Cement Level - Annulus, from Top (ft / m)
Fluid Density - Casing (lb/gal / Sp Gr) Cement Density - Annulus (lb/gal / Sp Gr)
Fluid Temperature - Casing (°F / °C)
Comments:

Results and Recommendations:


for Fiberglass Casing Installation

Well General Information

asing Completion Information

Static Well Conditions

Cementing Conditions

Comments:

You might also like