Project: Crescent Bay Pearl Tower 3

Karachi, Pakistan
Inspection Request (M&P) Log
INSPECTION REQUEST LOG (HVAC & PLUMBING)
Rev-00 Rev-01 Rev-02 Rev-03

SUB-DISCIPLINE
SPECIFICATION
REFERENCE

DOCUMENT
DISCIPLINE
FILE CODE

Plan Date of
Submission

Response
STATUS

Date to
VOL #
ITEM

FINAL
&

SUBMITTAL REF. SUBMITTAL DESCRIPTION Submission Date of No. of Submission Date of No. of Submission Date of No. of Submission Date of No. of
Status Status Status Status STATUS
Date Reply Days Date Reply Days Date Reply Days Date Reply Days

Installation and Testing of Fixture Faucets and Washroom


729 CBPR3-PB-CO-3-M&P-FIN-IR-0739 M&P FIN SALMAN 6-Jan-21 23-Dec-20 40 UR UR
Accessories at Level 8 in Apartment C

Installation and Testing of Fixture Faucets and Washroom


730 CBPR3-PB-CO-3-M&P-FIN-IR-0740 M&P FIN SALMAN 6-Jan-21 23-Dec-20 40 UR UR
Accessories at Level 8 in Apartment E

Installation and Testing of Fixture Faucets and Washroom


731 CBPR3-PB-CO-3-M&P-FIN-IR-0741 M&P FIN SALMAN 6-Jan-21 23-Dec-20 40 UR UR
Accessories at Level 8 in Apartment B

Installation of Drain Pipe and Water Testing at Level 14 Lobby


1369 CBPR3-PB-CO-3-HVAC-FIN-IR-0604 HVAC FIN SALMAN 3-Feb-21 20-Jan-21 12 UR UR
Area

LEGENDS
Total Inspection Request Plumbing Submitted 1384
Total Approved 1269

A APPROVED 697
B APPROVED AS NOTED 572
C NOT APPROVED - RESUBMIT 111
D REJECTED 0
E FOR INFORMATION ONLY 0
UR UNDER REVIEW 4