Sl No FOOTING/COLUMN NO Description GRID Shape of Rods Dia(mm) Cutting Length(m) Spacing(mm) No Of Rods No Off
Members 8mm 10mm 12mm 16mm 20mm 25mm 32mm
Lgf to gf
4.825
Verticle 0.48 16 5.305 6 1 _ _ _ 31.830 _ _ _
0.82
0.22
Stirupps 200c/c 8 2.208 200 24 1 52.992 _ _ _ _ _ _
0.12
0.075 0.075
C -Hook 200c/c 8 0.27 200 48 1 12.960 _ _ _ _ _ _
4.825
Verticle 0.48 16 5.305 6 1 _ _ _ 31.830 _ _ _
0.82
0.22
Stirupps 200c/c 8 2.208 200 24 1 52.992 _ _ _ _ _ _
0.12
0.075 0.075
C -Hook 200c/c 8 0.27 200 48 1 12.960 _ _ _ _ _ _
Page 1 of 3
Contractor : VPR Construction Pvt Ltd
RA Bill No : 1
Barbending Schedule
Cutting No Off
Sl No RAFT Description GRID Shape of Rods Dia(mm) Length(m) Spacing(mm) No Of Rods Members 8mm 10mm 12mm 16mm 20mm 25mm 32mm
BOTTOM MAT _ _ _ _ _ _ _
TOP MAT
0.125 6.200 0.125
SHORTER SPAN 16 @ 125 C/C 16 6.450 125 261 1 _ _ _ 1683.450 _ _ _
0.30 1 0.300
HANCH BAR 16 @ 100 C/C 16 1.600 150 260 2 _ _ _ 832.000 _ _ _