Project RCC RU-VI Balongan: Milestone Preparation For TA
Project RCC RU-VI Balongan: Milestone Preparation For TA
Project RCC RU-VI Balongan: Milestone Preparation For TA
4U2004.2.4.2 Civil
3. U2004.2.5 INSTALLATION
4U2004.2.5.1 Mechanical
4U2004.2.5.2 Piping
4U2004.2.5.3 Electrical
4U2004.3.1.2
4U2004.3.1.3
4.
4.
4.
3. U2004.2.2. Piping
4U2004.2.2.1
4U2004.2.2.2
4U2004.2.3.2
3. U2004.2.4 Electrical
4U.2004.2.4.1
4U2004.2.4.2
3. U2004.2.5 Instrument
4U.2004.2.5.1
4U2004.2.5.2
Project Revitalisasi RCC RU-VI Balongan 100%
Site Preparation
Turn Around