Total Cost 18,904,333: Summary of Cost (Public Health)
Total Cost 18,904,333: Summary of Cost (Public Health)
3 Tubewell 2,718,300
3 Tubewell 2,718,300
Page 3 of 19
Rate Amount
S.# Description Unit Qty.
Providing and fixing C.P. Muslim Shower with double
bib cock of best quality, with C.P. flexible pipe of “Porta
or Approved Equivalent", complete in all respect as per Nos. 28 6,000 168,000
specifications and drawings.
1.8 C.P. mixer
Providing and fixing 15 mm dia C.P. mixer with C.P pipe
15 mm dia, of “Porta or Approved Equivalent", Porta or
approved equal complete including pipe connections, all
fittings, testing etc.
a) Wash basin mixer Nos. 38 6,500 247,000
b) Shower mixer Nos. 10 8,000 80,000
c) Mixer for Ablution Area Nos. 2 6,500 13,000
Page 4 of 19
Rate Amount
S.# Description Unit Qty.
1.9 Soap Dish
Providing and fixing best quality soap dish of “Porta or
Approved Equivalent", complete in all respect as per Nos. 50 2,000 100,000
specifications and drawings.
Page 5 of 19
SHELTERS ASSOCIATES
GOREE PHARMACEUTICAL INDUSTRY
ENGINEER'S COST ESTIMATE (PUBLIC HEALTH)
Rate
S.# Description Unit Qty. Amount
2.1 Water Supply
Providing, fixing, jointing and testing Polypropylene Random
(PPR) pipes, DADEX or approved equivalent, pressure pipe for
cold/hot water as per DIN 8077-8078,PN-20 for pipes and DIN
16962,PN-25 for fittings (polyfusion welded joints) inside building
including fittings and specials (sockets, tees, elbows, bends,
crosses, reducers, adaptor, plugs and union etc.) supported on
walls or suspended from roof slab or run in chases including pipe
hangers, supports, cutting and making good the chases and
holes, complete in all respects.
Page 6 of 19
SHELTERS ASSOCIATES
GOREE PHARMACEUTICAL INDUSTRY
ENGINEER'S COST ESTIMATE (PUBLIC HEALTH)
Rate
S.# Description Unit Qty. Amount
a) 2" i.d Rft 743 256 190,080
b) 3" i.d Rft 1927 377 726,509
c) 4" i.d Rft 1755 578 1,014,598
d) 6" i.d Rft 353 927 327,046
e) 8" i.d Rft 400 1,264 505,663
Class "C"
f) 2" i.d Rft 61 166 10,043
3.2 Vent Cowel
Providing, fixing, cutting, jointing and testing uPVC Vent Cowel
on Vent Pipes with solvent cement jointing, DADEX or approved
equivalent, rates include cost of cutting & pipe fittings of the
following diameter:
Page 7 of 19
SHELTERS ASSOCIATES
GOREE PHARMACEUTICAL INDUSTRY
ENGINEER'S COST ESTIMATE (PUBLIC HEALTH)
Rate
S.# Description Unit Qty. Amount
4.1 GAS SUPPLY
Providing, laying, fixing, testing (at 90 psi) and disinfecting,
galvanized iron pipelines for sui gas supply of "Jamal pipe Or
Approved Equivalent", as per BSS 1387 medium quality, "IIL", and
"KPM" as approved by the Engineer complete in all respects to
their entire satisfaction, including specials such as tee, cross,
reducer, bend, union, elbow, plug, socket etc., supported on walls
or suspended from slab, including painted MS horizontal and
vertical pipe hangers of approved design, supports, cutting and
making good the same as necessary to the structure including two
layers of anticorrosive bitumen tape overlapped 6mm at edges to
all buried pipes, complete in all respect as per specifications and
drawings.
Page 8 of 19
SHELTERS ASSOCIATES
GOREE PHARMACEUTICAL INDUSTRY
ENGINEER'S COST ESTIMATE (PUBLIC HEALTH)
Rate
S.# Description Unit Qty. Amount
Water Booster Pump Vertical Inline Multistage Centrifugal Pump
(each pump capacity of 50 GPM(total 100 gpm)) @ 3 Bar
(Impeller & Pump Shaft in Stainless Steel with Mechanical shaft
seal) coupled with%. 3KW FELM (Italy) IE2 Motor (3 Phase. 400
Volts, 50Hz, 2 Pole with VFD (variable Frequency drive)
application choice of Operation via-a VFD or pressure switches
system shall be selectable via a panelmounted switch. Both
system of operation either via VPD · or a switched function shall
be in depended of each other · . Unit to include a pressure tank of Unit 1 785,000 785,000
300 liters capacity The system is to be provided with suction
discharge manifolds and base frame.Pressure Booster.system to
have pressure gauge. And pressure transmitter (4-20 mA).
Booster control in a control Panel cabinet, 1P-54, including main
switch. And all.required fuses. Motor-protection, switching
equipment.
Page 9 of 19
SHELTERS ASSOCIATES
GOREE PHARMACEUTICAL INDUSTRY
ENGINEER'S COST ESTIMATE (PUBLIC HEALTH)
Rate
S.# Description Unit Qty. Amount
6.2 Submersible Pumps For U.G.W.Tank
Providing, fixing & testing submersible Pumps installed in Under
Ground Water tank consisting of two pumps one running and
one standby. Each pump having following Capacity. coupled with
elctric motor, Grundfos make or Approved Equivalent.
Page 10 of 19
SHELTERS ASSOCIATES
GOREE PHARMACEUTICAL INDUSTRY
ENGINEER'S COST ESTIMATE (PUBLIC HEALTH)
Cumulative
S.# Description Unit Qty. Supply+Installation
Unit Rate Amount
INSTALLATIONS FOR TUBE WELL(0.25
Cusec)
Direct Rotary/Reverse Rotary Drilling of
borehole for tubewell, in all type of soil except
1 shingle, gravel & rock as per Specification.
Per
2 Furnishing sample for water from bore hole Set of 5.0 550.0 2,750.0
2 Bottle
b) Conductivity (Microhms)
c) "P" Alkalinity (CaCo3)
d) "M" Alkalinity
e) Total hardness(CaCo3)
f) Ccalcuim Hardness (CaCo3)
g) Magnesium Hardness (MgCo3)
h) Magnesium Hardness (MgCo3)
i) Floride as (F)
j) Sulphate (SO4)
k) Nitrate as (SO4)
l) Iron (Fe) Suspended iron & Dissolved iron
m) Silica
n) Turbidity
o) Total Solids
p) Suspended Solids
q) Sodium (NA)
r) BOD
s) Micro Biological Contamination (Coliforms)
Provide, sealing angular space around
housing pipe as per drawing with 1:1 Cement
11 slurry (Cement sand mortar) as per drawings. Rft 50.0 1,200.0 60,000.0
Cumulative
S.# Description Unit Qty. Supply+Installation
Unit Rate Amount
12 PUMP, MOTOR AND DISCHARGE LINE
Providing Installing and Commisiion of
Submersible Pump for tubewell, "HMA" or
equivalent make having dischrage 0.25 cfs
against total head 200 feet. The material
construction of the pump (bowl, chamber,
Pump shaft & impeller ) should be in
(Stainless Steel) M.S bore cover plate, Sluice,
Non Return valves, Bend, air valves, lowering
clamps, 10HP water cooled Submersible
motor, 3x380v, voltage tolerance +/- 10%, 2
pole, IP 68, motor jacket, civil foundation for
pump,
Total 2,718,300.0
SHELTERS ASSOCIATES
GOREE PHARMACEUTICAL INDUSTRY
ENGINEER'S COST ESTIMATE (PUBLIC HEALTH)
Cumulative
S.# Description Unit Qty. Supply+Installation
Unit Rate
INSTALLATIONS FOR TUBE WELL(0.25 Cusec)
Direct Rotary/Reverse Rotary Drilling of borehole for tubewell, in all
1 type of soil except shingle, gravel & rock as per Specification.
a) From ground level upto 800 ft below ground level. Rft 800.0 594.0
Per
2 Furnishing sample for water from bore hole 5.0 550.0
Set
Provide and install, fiber strainer in tubewell borehole with
approved composition having open area 10-11% (min) 1.6mm
3 slots, including sockets, special sockets, studs etc complete in all
respect.
a) 6" i/d, 1/4" thick Rft 50.0 1,155.0
4 Provide and install Fiber Bail plug in tubewell borehole
a) 6" i/d, 10ft long No. 1.0 9,900.0
Provide and install MS Housing pipe. Joint, reducer (where
5 necessary) make in tubewell bore hole, including jointing complete
in all respect.
a) 10" i/d, 6mm thick Rft 270.0 990.0
Provide and install Fiber blind pipe. Joint, reducer (where
6 necessary) make in tubewell bore hole, including jointing complete
in all respect.
a) 6" i/d, 1/4" thick Rft 370.0 1,850.0
Development, test and disinfect of complete well in accordance
with standard specifications and instructions of Engineer Incharge
7 including cost of disposal of water as pumped. Job 1.0 82,500.0
Take soil sapmles one No. each at every 10ft depth or from each
strata as per direction of engineer incharge including submission of
9 analysis and log of borehole as per Specification. No. 80.0 130.0
suitable length of power and dry running cable from motor to motor
control panel along with Motor Control unit consiting of (Metalic
Box, Breaker, ammeter, volt meter, Magnetic contactor, on/off
switch, electornic over current relay, EVR, indication relay etc.) and
power wiring from main panel board to pump motor control unit
suitable for above motor, complete in all respects including testing No. 1.0 800,000.0
and commisssioning as directed by the Engineer incharge
including testing and warranty for proper operation for the
maintenance period.
Total
Cumulative
Supply+Installation
Amount
475,200.0
2,750.0
57,750.0
9,900.0
267,300.0
684,500.0
82,500.0
143,000.0
10,400.0
75,000.0
Cumulative
Supply+Installation
Amount
60,000.0
800,000.0
50,000.0
Cumulative
Supply+Installation
Amount
2,718,300.0