Engineering Services Division ALUMINIUM & GLASS CO. L.L.C.


Project No: 87346 Project name: Police Parade Building works

TECHNICAL SUBMITTAL
Date: 26/06/2016

Contractor Locator Discipline Submittal Revision Spec. Spec. Sub.


Code Number Section Clause Contractor

SAMPLE METHOD STATEMENT TECHNICAL DATA

TESTING WARRANTY OTHER

MANUFACTURER: DU PONT

DESCRIPTION: CORIAN TOP

COMMENTS:

1. Work may proceed


DATE : 26/06/2016
2. Revise and resubmit, work may proceed subject to
incorporation of changes indicated.
SIGNED : ________________ 3. Revise and re-submit, work may not proceed.

4. Review not required work may proceed.


CONTRACTOR CERTIFICATION
IMPORTANT : Permission to proceed does not constitute
WE CERTIFY THAT THE SUBMITTED ITEM: acceptance or approval of design details, calculations,
analysis, test method or materials developed or selected by
the supplier and does not relieve supplier from full compliance
Complies with the Specifications referred to above. with contractual obligation.

Is an alternative for the specified item and complies DCA ENGINEERING SERVICES
with the intent of the Specification.

SIGN:_________________ DATE: ______________

Form: DCA(ES)-TDU-02 (Rev. 0)