MASTER DOCUMENT REGISTER (MDR)


[NAMA PEKERJAAN / CALON PELANGGAN]
[NAMA INTEGRATED TEAM]
[NO. KONTRAK/SPK]
As Per Date : [ISI TANGGAL]

PGAS to PGN PGN to PGAS


NO DOCUMENT NO. DOCUMENT TITLE REV. STATUS STATUS CODE REMARKS

TRANSMITTAL NO DATE TRANSMITTAL NO DATE

A PROJECT MANAGEMENT

A.1 GENERAL

1 Project Master Schedule (S-Curve)

2 Struktur Organisasi

3 dll…

A.2 PPL / TQ

1 PPL

2 TQ

3 dll…

B ENGINEERING

1 Data Sheet Ball Valve

2 Data Sheet Fitting

3 MTO

4 MDR MRS

5 dll…

C MATERIAL

1 Material Balance

2 CB - Bon Pengambilan Material via Aplikasi PREMIER

3 Berita Acara Pemeriksaan Free Issue Material

4 Sertifikat Free Issue Material

5 Material Receiving Report - Pipa Baja via Aplikasi PREMIER

6 Material Receiving Report - Fitting via Aplikasi PREMIER

7 Material Receiving Report - Ball Valve via Aplikasi PREMIER

8 Material Receiving Report - Insulating Joint via Aplikasi PREMIER

9 Material Receiving Report - Field Joint Coating via Aplikasi PREMIER

10 Material Receiving Report - MRS via Aplikasi PREMIER

11 dll...

D HSE

D.1 GENERAL

1 Job Safety Analysis

2 Permit To Work

Page 1 of 4
Lampiran 47 Format Master Document Register

MASTER DOCUMENT REGISTER (MDR)


[NAMA PEKERJAAN / CALON PELANGGAN]
[NAMA INTEGRATED TEAM]
[NO. KONTRAK/SPK]
As Per Date : [ISI TANGGAL]

PGAS to PGN PGN to PGAS


NO DOCUMENT NO. DOCUMENT TITLE REV. STATUS STATUS CODE REMARKS

TRANSMITTAL NO DATE TRANSMITTAL NO DATE

3 dll…

D.2 REPORT

1 Laporan HSE

2 dll…

E CONSTRUCTION & QA/QC

E.1 PROCEDURE

1 Prosedur Hot-Tapping

2 dll…

E.2 QA/QC

1 Sertifikat Peralatan Kerja

2 Sertifikat Material

3 Sertifikat Personil

4 dll…

E.3 REPORT

1 Laporan Survey Konstruksi via Aplikasi PREMIER

2 Laporan Pembersihan Jalur via Aplikasi PREMIER

3 Laporan Penjajaran Pipa via Aplikasi PREMIER

4 Laporan Field Joint Coating via Aplikasi PREMIER

5 Laporan Galian via Aplikasi PREMIER

6 Laporan Penurunan Pipa via Aplikasi PREMIER

7 Laporan Penimbunan Kembali via Aplikasi PREMIER

8 Laporan Welding via Aplikasi PREMIER

9 Laporan Skematik Welding via Aplikasi PREMIER

10 Laporan Tie In via Aplikasi PREMIER

11 Laporan Golden Joint via Aplikasi PREMIER

12 dll… via Aplikasi PREMIER

E.4 PIPE BOOK

1 Pipe Book Before Lowering via Aplikasi PREMIER

2 Pipe Book Before Hydrostatic via Aplikasi PREMIER

Page 2 of 4
Lampiran 47 Format Master Document Register

MASTER DOCUMENT REGISTER (MDR)


[NAMA PEKERJAAN / CALON PELANGGAN]
[NAMA INTEGRATED TEAM]
[NO. KONTRAK/SPK]
As Per Date : [ISI TANGGAL]

PGAS to PGN PGN to PGAS


NO DOCUMENT NO. DOCUMENT TITLE REV. STATUS STATUS CODE REMARKS

TRANSMITTAL NO DATE TRANSMITTAL NO DATE

3 dll….

F AS BUILT DRAWING

1 As Built Drawing

G PROGRESS REPORT

G.1 DAILY REPORT

1 Laporan Harian - 01 Januari 2019 via Aplikasi Premier

2 Laporan Harian - 02 Januari 2019 via Aplikasi Premier

3 dst.. via Aplikasi Premier

G.2 MONTYHLY REPORT

1 Laporan Bulanan - Januari 2019 via Aplikasi Premier

2 Laporan Bulanan - Februari 2019 via Aplikasi Premier

3 dst…

H BERITA ACARA

1 Berita Acara Persiapan Proyek

2 Berita Acara Survey Konstruksi

3 Berita Acara Pemotongan Pipa

4 Berita Acara Pengujian Hidrostatic Test / Pneumatic Test

5 Berita Acara Holiday Test

6 Berita Acara Pemasangan Marker Tape

7 Berita Acara Pembuangan Tanah Bekas Galian

8 Berita Acara Pembersihan Pipa (Flushing)

9 Berita Acara Pengisian N2

10 Berita Acara Pengujian Sistem Proteksi Katodik

11 Berita Acara Pre-Commissioning

12 Berita Acara Commissioning

13 dll…

I LAIN-LAIN

1 Iijn Pelaksanaan Pekerjaan

2 Ijin Perlintasan

Page 3 of 4
Lampiran 47 Format Master Document Register

MASTER DOCUMENT REGISTER (MDR)


[NAMA PEKERJAAN / CALON PELANGGAN]
[NAMA INTEGRATED TEAM]
[NO. KONTRAK/SPK]
As Per Date : [ISI TANGGAL]

PGAS to PGN PGN to PGAS


NO DOCUMENT NO. DOCUMENT TITLE REV. STATUS STATUS CODE REMARKS

TRANSMITTAL NO DATE TRANSMITTAL NO DATE

3 dll…

TOTAL DOKUMEN - PROJECT MANAGEMENT STATUS DOKUMEN BELUM DI SUBMIT


PROCUREMENT STATUS DOKUMEN REV. A
- PROJECT CONTROL STATUS DOKUMEN REV. B
- HSE STATUS DOKUMEN REV. 0
- QA/QC STATUS DOKUMEN REV. 1
- CONSTRUCTION STATUS DOKUMEN REV. 2
TOTAL

Page 4 of 4