Formation Hole Size Casing
Program Pemboran
P. Press Frac. FIT BHST Mud Program Cementing Program Anticipated Logging Remark
ft-SS Inch ppg ppg ppg °F Prmtr Unit Value Description Unit Slurry Drilling Problems Program
Spuds Driven 16" COND.
--------- 110 ft-TVD ERW Pipe, Structural conductor will be pilled to 110 ft before rig up
--------- Sch. 40 - - - - -
--------- 2 - 3% KCl-Polymer One stage cementing - Dual Slurry
--------- Pre-flush :
--------- MW ppg 8.7 - 8.9 30 bbls fresh water Tail
Visc sec/qt 35 - 45 G cmt
--------- FL cc/30min < 10 Slurry Wt ppg 15.80 Tight hole, bridges,
---------
TELISA SHALE

pH Oct-11 Yield Cft/Sx 1.160 and sloughing shale


--------- 12-1/4" Rock Bit 9-5/8" Casing PV cps 6 - 12 T. Time hrs 4.00 while drilling soft NO LOGGING
--------- IADC 117 or 126 36.0 ppf YP lb/100ft2 8 - 10 BHCT deg F 120 nature Telisa
--------- J-55 Pot ppm 13,500 Comp.St.12 hrs psi 600
TFA=0.7455 BTC MBT ppb < 17.5 Comp.St.24 hrs psi
--------- (3 x 18 nozzle) Ca ppm 150-200 Excess in OH % 200
--------- Solid % Vol <4 Additives :
--------- Normal Max
--------- 275 ft-TVD 8.4 ppg 16.0 16.0 75 TOC ft-MD Surface
--------- 3 - 5 % KCl-Polymer One stage cementing - Dual Slurry
Pre-flush :
MW ppg 8.8 - 9.0 40 bbls Scavenger Lead Tail
--------- Visc sec/qt 40 - 50 G cmt
FL cc/30min <6 Slurry Wt ppg 13.50 15.80

DLL/MSFL/SP/GR/CAL
LDL/CNL/GR/SONIC
pH Oct-11 Yield Cft/Sx 1.700 1.160 Risk of Pipe
--------- PV cps ALAP T. Time hrs 3.00 4.00 Sticking while drilling
8-1/2" Rock Bit 7" Casing YP lb/100ft2 12-18 BHCT deg F 120 160 in payzone
BEKASAP FM

IADC 217M 23 ppf Pot ppm 23,000 Comp.St.12 hrs psi 800 1,000

SWC
FMT
--------- K-55 MBT ppb < 17.5 Comp.St.24 hrs psi
TFA=0.7455 BTC Ca ppm 150-200 Excess in OH % 250 300
(3 x 18 nozzle) Solid % Vol <4 Additives :

---------
---------
---------
NOTE :

Normal Min
750 ft-TVD 8.5 ppg 16.3 16.0 125 TOC ft-MD Surface

R
C
S
Subsurface Equipment
Subsurface equipment
Casing
1 Casing 16" ERW, CS, API SI_ GR B, SCH 40
2 Casing 9 5/8", 36 ppf, K-55, BTC, R3
3 Casing 7", 23 ppf, K-55, BTC, R3
Surface/Intermediate Casing Installation
1 9 5/8" Float Shoe, BTC Conn.
2 9 5/8" Float Collar, BTC Conn.
3 7" Float Shoe, BTC Conn.
4 7" Float Collar, BTC Conn.
Tubing
1 Tubing 3 1/2", 9.3 ppf, J-55. EUE, R2
Well Equipment Subsurface
1 Tubing Pump
2 Sucker Rod
3 Pony Rod
4 Polished Rod
5 Polished Rod Clamp
6 7" x 3-1/2" Production Packer
7 7" x 3-1/2" RTTS Packer
8 7" x 3-1/2" RBP Packer
Surface Equipment
Surface equipment
Well Equipment - Surface (Wellhead)
1 CasIng Head 9 5/8" SOW x 11"-3M Top
2 Tubing Spool 11"-3M x 71/16"-3M x 31/2" EUE
3 Tubing Head Adaptor Flange 7 1/16'-3M x 3 1/2" EUE
4 Master Valve, 3 1/8"-3M, 3-1/2"EUE screw end
5 Tubing Nipple 3-1/2" EUE, 9.3 ppf x 10' Long
6 HPU
7 Stuffing Box
8 PumpingTee

Well Equipment – Surface Wellhead


WELL EQUIPMENT SURFACE
DESCRIPTION PROGRAM
WELLHEAD
Casing Head 9-5/8" 1
Tubing Spool 11"x 7-1/16" 1
Tubing Head 7-1/16"x 3-1/2" 1
Master Valve, 3-1/8" 1
Tubing Nipple, 3-1/2" EUE 1
Well Design
Desain Casing dan Tubing
CASING & TUBING
PROGRAM
SIZE (INCH)
INTERVAL (FT MD) QTY (JTS) TYPE, CON, WEIGHT
16 0 - 150 4 ERW Pipe, Sche.40
9-5/8 0 - 275 7 K-55, BTC, 36 ppf
7 0 - 750 20 K-55, BTC, 23 ppf
3-1/2 0 - 630 21 J-55, EUE, 9.3 ppf
Drilling Fluid Design
DRILLING FLUID
TYPE INTERVAL ( FT MD ) WEIGHT ppg 12/15 FL (mL/30min) CL (mg/L)
KCL-Polymer 0 - 281 8.8 6/8 9.1
KCL-Polymer 281 - 750 9.0 12/15 6.2 19,500

Material Requirement untuk 12-1/4" Hole (KCl-


Polymer Mud Type)
Concentration
Material Name Unit Size
ppb
Bentonite 100 lbs/sack 5.00
KOH 25 kg/sack 0.50
KCL (3-5%) 50 kg/sack 15.00
PAC-RE 50 lbs/sack 1.00
PAC-LE 50 lbs/sack 1.00
BARABLOK 50 lbs/sack 1.00
Sod. Bicarbonate 50 kg/sack 0.75
Material Requirement untuk 8-1/2" Hole (KCl-
Polymer Mud Type)

Concentration
Material Name Unit Size
ppb
Bentonite 100 lbs/sack 5
KOH 25 kg/sack 1
KCl (5%) 50 kg/sack 15
PAC-RE 50 lbs/sack 1
PAC-LE 50 lbs/sack 1.5
BARAZAN-D 50 lbs/sack 1
Lignite 50 lbs/sack 1
K. Soltex 50 lbs/sack 2
Sod. Bicarbonate 50 kg/sack 1
Fracseal (for 100 bbls mix vol.) 25 lbs/sack 5
CaCo3 (for 100 bbls mix vol.) 50 kg/sack 50
DRILLING CURVE (Depth vs Time vs Cost)
Tata Waktu Pemboran KSK-N2 (P18)
720 ft
0 1,170,000

1
100 AFE Cost 1,040,000
USD 1,090,497
2
200 910,000

Cummulative Cost, (US$.)


3 4
300 780,000
Total Depth, (ft-MD)

Plan of Operations :
1. MIRU
400 2. Drill 12-1/4" hole vertically to 275 ft 650,000
3. Run 9-5/8" Csg, Cmtg, Wellhead &
BOP.
4. DOC & 10 ft formation below shoe, FIT.
500 5. Drill 8-1/2" hole vertically to 720 ft 520,000
5
6. Run Logs & trip before run casing
7. Run 7" Csg, Cmtg, BOP & Wellhead
600 390,000

700 260,000
8
6 7
800 130,000

900 0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Rig on Location, days


Aktivitas dan Perkiraan Lamanya Waktu
Pelaksanaan Pemboran
No. Job Description Days Cum. Days

0 0
1 Rig Move 9.00 9.00
2 Drill 12-1/4" hole 0.31 9.31
3 Circ hole clean + POOH bit + run csg + cmt + woc +n/u & test bop 0.91 10.21
4 Drill out FC, FS and 10 ft formation + FIT 0.35 10.56
5 Drill 8-1/2" hole to TD. 0.49 11.05
6 Circ hole clean + POOH bit + Logging + wiper trip 0.95 12.00
7 RIH 7" csg + cmt + WOC + n/d bope+ lay down string + Install WH 0.67 12.68
0.67 12.68
8 Completion 5.00 17.68
Perhitungan Biaya Pemboran
N Work Program And
o Description Budget
1 Total tangible cost $140,335
2 Total intangible cost $950,162
Total cost $1,090,497
Completion Design
Maturnuwun
Terimakasih
Thanks you