Professional Documents
Culture Documents
Daily Water Report 01.10.2018 To 31.10.2018
Daily Water Report 01.10.2018 To 31.10.2018
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 0.00
Shift B 0.00
Shift C 8.73 7.92 5.15 2 5 0.018
Average 8.73 7.92 5.15 2.00 5.00 0.00 0.018 0.00
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.82 9.88 6.42 2 5 0.018
Unit #2
Shift B 8.80 10.11 6.57 2 5 0.019
Shift C 8.78 9.56 6.21 2 5 0.018
Average 8.80 9.85 6.40 2.00 5.00 0.00 0.018 0.00
CBD WATER
Shift/Time
Unit #1
COND P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH TDS T.H
µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 0.00
Shift B 0.00
Shift C 9.51 153.1 99.52 16 35 1.71 27.0
Average 9.51 153.10 99.52 16.00 35.00 0.00 1.71 27.00
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.47 110.1 71.57 15 31 0.37 24.0
Shift B 9.48 96.7 62.86 15 30 0.38 25.0
Shift C 9.40 80.5 52.30 13 28 0.36 24.0
Average 9.45 95.75 62.24 14.33 29.67 0.00 0.37 24.33
0 0 0 0 0 0 50 50
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 0.00
Shift B 0.00
Shift C 8.69 6.86 4.46 2 5.0
Average 8.69 6.86 4.46 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.70 8.12 5.28 2 5.0
Shift B 8.70 8.06 5.24 2 5.0
Shift C 8.67 6.67 4.34 2 5.0
Average 8.69 7.62 4.95 2.00 5.00 0.00
U POWER
WTP
ATER DATE 01.10.2018
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
9.62 1.08
1.60
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 1.40 Mtr
3
M DEAREATOR LEVEL : 1558 mm
0 0 0 4 mm- 6 mm
LINE -II
Stage II
01.10.2018
COC(TDS)
COC(TDS)
1.08
1.60
28 M3
35.4 M3
1680 M3
570 M3
134 M3
80 %
PORT (BC 2 )
< 4 mm
AVG LOAD
STG-2 MW 15.00
ΔT Vacum
6.2 -89.8
ΔT Vacum
13.0 -77.36
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
2 MB 1-257
ressure & P.Flow data
Prod.pres
0.50
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
0.50
0.7
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
2.2 10
DM WATER (MIXED BED OUTLET)
COND P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH TDS T.H
µs/cm ppm ppm
6.5-7.8 <1 < 0.6 NIL NIL NIL 0.020 NIL
Shift A 7.12 0.90 0.59 0 0 0.015
Shift B 7.12 0.86 0.56 0 0 0.014
Shift C 7.14 0.87 0.57 0 0 0.015
Average 7.13 0.88 0.57 0.00 0.00 0.00 0.015 0.00
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 8.74 8.39 5.45 2 5 0.018
Shift B 8.71 6.95 4.52 2 5 0.017
Shift C 8.73 7.25 4.71 2 5 0.018
Average 8.73 7.53 4.89 2.00 5.00 0.00 0.018 0.00
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.79 8.98 5.84 2 5 0.018
Unit #2
Shift B 8.76 9.82 6.38 2 5 0.019
Shift C 8.76 9.84 6.40 2 5 0.018
Average 8.77 9.55 6.21 2.00 5.00 0.00 0.018 0.00
CBD WATER
Shift/Time
Unit #1
COND P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH TDS T.H
µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 9.50 120.0 78.00 15 34 1.23 25.0
Shift B 9.43 116.3 75.60 15 33 1.20 25.0
Shift C 9.42 105.7 68.71 15 32 1.21 25.0
Average 9.45 114.00 74.10 15.00 33.00 0.00 1.21 25.00
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.38 82.4 53.56 13 27 0.33 24.0
Shift B 9.35 80.8 52.52 12 27 0.30 25.0
Shift C 9.38 90.2 58.64 14 31 0.34 24.0
Average 9.37 84.47 54.91 13.00 28.33 0.00 0.32 24.33
Remarks
FEED BACK POWER O & M , SITE : KARIANGAU POWER
DAILY WATER ANALISIS REPORT FOR - WTP
RO PLANT WATER
COND
R.O PLANT pH T.H ppm Ca.H ppm Mg.H ppm T.AKL ppm
µs/cm
SW RO # 1 (Fresh Tank) 7.44 1480.0
SW RO # 2 (Fresh Tank)
BW RO # 1(Before MB)
BW RO # 2(Before MB) 7.33 129.4
,
25 1 0 0 10 0 0 0
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 8.68 7.06 4.59 2 5.0
Shift B 8.65 4.86 3.16 2 5.0
Shift C 8.68 4.93 3.20 2 5.0
Average 8.67 5.62 3.65 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.70 7.76 5.04 2 5.0
Shift B 8.67 6.12 3.98 2 5.0
Shift C 8.66 5.17 3.36 2 5.0
Average 8.68 6.35 4.13 2.00 5.00 0.00
U POWER
WTP
ATER DATE 02.10.2018
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
9.42 1.08
1.67
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 1.15 Mtr
3
M DEAREATOR LEVEL : 1359 mm
4 7 3 4 mm- 6 mm
LINE -II
Stage II
02.10.2018
COC(TDS)
COC(TDS)
1.08
1.67
23 M3
30.9 M3
1780 M3
611 M3
146 M3
80 %
PORT (BC 2 )
< 4 mm
AVG LOAD
STG-2 MW 13.70
ΔT Vacum
11.3 -85.8
ΔT Vacum
12.8 -77.24
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
2 MB 1-257
ressure & P.Flow data
Prod.pres
0.50
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
0.50
0.7
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
2.2 10
DM WATER (MIXED BED OUTLET)
COND P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH TDS T.H
µs/cm ppm ppm
6.5-7.8 <1 < 0.6 NIL NIL NIL 0.020 NIL
Shift A 7.15 0.89 0.58 0 0 0.015
Shift B 7.16 0.95 0.62 0 0 0.014
Shift C 7.15 0.91 0.59 0 0 0.015
Average 7.15 0.92 0.60 0.00 0.00 0.00 0.015 0.00
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 8.75 7.29 4.74 2 5 0.018
Shift B 8.79 8.97 5.83 2 5 0.018
Shift C 8.75 7.30 4.75 2 5 0.017
Average 8.76 7.85 5.10 2.00 5.00 0.00 0.018 0.00
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.78 10.12 6.58 2 5 0.018
Unit #2
Shift B 8.80 9.12 5.93 2 5 0.018
Shift C 8.77 9.40 6.11 2 5 0.018
Average 8.78 9.55 6.21 2.00 5.00 0.00 0.018 0.00
CBD WATER
Shift/Time
Unit #1
COND P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH TDS T.H
µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 9.40 100.7 65.46 14 33 1.04 25.0
Shift B 9.41 96.1 62.48 16 34 0.98 26.0
Shift C 9.32 80.5 52.33 15 28 0.91 25.0
Average 9.38 92.44 60.09 15.00 31.67 0.00 0.98 25.33
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.46 118.0 76.70 15 35 0.37 26.0
Shift B 9.47 108.7 70.66 16 36 0.48 25.0
Shift C 9.32 80.5 52.33 13 30 0.28 24.0
Average 9.42 102.40 66.56 14.67 33.67 0.00 0.38 25.00
0 0 0 0 10 7 0 0
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 8.66 5.88 3.82 2 5.0
Shift B 8.68 6.12 3.98 2 5.0
Shift C 8.72 5.89 3.83 2 5.0
Average 8.69 5.96 3.88 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.70 7.07 4.60 2 5.0
Shift B 8.68 7.21 4.69 2 5.0
Shift C 8.73 6.72 4.37 2 5.0
Average 8.70 7.00 4.55 2.00 5.00 0.00
U POWER
WTP
ATER DATE 03.10.2018
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
10.50 1.07
2.07
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 1.00 Mtr
3
M DEAREATOR LEVEL : 1499 mm
2 7 3 4 mm- 6 mm
LINE -II
Stage II
03.10.2018
COC(TDS)
COC(TDS)
1.07
2.07
20 M3
34.1 M3
1780 M3
631 M3
146 M3
80 %
PORT (BC 2 )
< 4 mm
AVG LOAD
STG-2 MW 13.70
ΔT Vacum
11.5 -85.7
ΔT Vacum
12.8 -78.56
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
MB 2-315
ressure & P.Flow data
Prod.pres
0.50
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
0.50
0.7
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
2.2 10
DM WATER (MIXED BED OUTLET)
COND P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH TDS T.H
µs/cm ppm ppm
6.5-7.8 <1 < 0.6 NIL NIL NIL 0.020 NIL
Shift A 7.12 0.97 0.63 0 0 0.014
Shift B 7.14 0.95 0.62 0 0 0.014
Shift C 7.14 0.87 0.57 0 0 0.015
Average 7.13 0.93 0.60 0.00 0.00 0.00 0.014 0.00
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 8.80 9.21 5.99 2 5 0.018
Shift B 8.74 8.75 5.69 2 5 0.018
Shift C 8.72 7.12 4.63 2 5 0.017
Average 8.75 8.36 5.43 2.00 5.00 0.00 0.018 0.00
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.82 10.15 6.60 2 5 0.018
Unit #2
Shift B 8.78 10.12 6.58 2 5 0.018
Shift C 8.75 9.45 6.14 2 5 0.018
Average 8.78 9.91 6.44 2.00 5.00 0.00 0.018 0.00
CBD WATER
Shift/Time
Unit #1
COND P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH TDS T.H
µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 9.40 80.2 52.13 14 30 1.00 25.0
Shift B 9.35 75.3 48.91 14 29 0.82 24.0
Shift C 9.30 70.4 45.73 12 27 0.90 25.0
Average 9.35 75.27 48.92 13.33 28.67 0.00 0.91 24.67
COND P.ALK M.ALK SiO2-ppm PO4-ppm
pH TDS T.H
Shift/Time µs/cm ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.47 105.7 68.71 14 32 0.30 25.0
Shift B 9.42 95.4 62.02 15 32 0.27 25.0
Shift C 9.35 85.3 55.47 13 28 0.21 24.0
Average 9.41 95.48 62.06 14.00 30.67 0.00 0.26 24.67
Remarks 1,MB#1 Regeneration done, 2, New Coagulant dosing pump fixed in intake trail taken under obeseravation
FEED BACK POWER O & M , SITE : KARIANGAU POWER
DAILY WATER ANALISIS REPORT FOR - WTP
RO PLANT WATER
COND
R.O PLANT pH T.H ppm Ca.H ppm Mg.H ppm T.AKL ppm
µs/cm
SW RO # 1 (Fresh Tank) 7.44 1680.0
SW RO # 2 (Fresh Tank)
BW RO # 1(Before MB)
BW RO # 2(Before MB) 7.38 130.4
,
0 0 0 0 10 7 50 50
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 8.76 9.10 5.92 2 5.0
Shift B 8.70 6.77 4.40 2 5.0
Shift C 8.68 4.68 3.04 2 5.0
Average 8.71 6.85 4.45 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.77 8.25 5.36 2 5.0
Shift B 8.72 7.68 4.99 2 5.0
Shift C 8.71 5.12 3.33 2 5.0
Average 8.73 7.02 4.56 2.00 5.00 0.00
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
11.70 0.98
2.01
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 0.97 Mtr
3
M DEAREATOR LEVEL : 1489 mm
4 7 3 4 mm- 6 mm
LINE -II
Stage II
04.10.2018
COC(TDS)
COC(TDS)
0.98
2.01
19.4 M3
33.8 M3
1780 M3
611 M3
146 M3
80 %
PORT (BC 2 )
< 4 mm
AVG LOAD
STG-2 MW 13.70
ΔT Vacum
11.6 -85.1
ΔT Vacum
13.0 -77.87
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
1 MB -315
ressure & P.Flow data
Prod.pres
0.50
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
0.50
0.7
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
2.2 10
DM WATER (MIXED BED OUTLET)
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
6.5-7.8 <1 < 0.6 NIL NIL NIL 0.020 NIL
Shift A 7.10 0.97 0.63 0 0 0.015
Shift B 7.14 0.86 0.56 0 0 0.014
Shift C 7.15 0.89 0.58 0 0 0.015
Average 7.13 0.91 0.59 0.00 0.00 0.00 0.015 0.00
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 8.74 9.75 6.34 2 5 0.018
Shift B 8.73 6.41 4.17 2 5 0.017
Shift C 8.72 7.49 4.87 2 5 0.017
Average 8.73 7.88 5.12 2.00 5.00 0.00 0.017 0.00
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.82 10.21 6.64 2 5 0.018
Unit #2
Shift B 8.75 10.40 6.76 2 5 0.018
Shift C 8.78 9.89 6.43 2 5 0.018
Average 8.78 10.17 6.61 2.00 5.00 0.00 0.018 0.00
CBD WATER
Shift/Time
Unit #1
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 9.30 70.2 45.60 12 25 0.85 22.2
Shift B 9.31 65.8 42.74 12 23 0.87 22.0
Shift C 9.28 66.8 43.39 12 24 0.89 23.0
Average 9.30 67.55 43.91 12.00 24.00 0.00 0.87 22.38
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.39 98.7 64.17 13 28 0.27 24.0
Shift B 9.43 102.9 66.89 15 32 0.30 25.0
Shift C 9.64 101.4 65.91 15 34 0.23 24.0
Average 9.49 101.01 65.65 14.33 31.33 0.00 0.27 24.33
0 0 0 0 0 0 0 0
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 8.70 8.21 5.34 2 5.0
Shift B 8.67 4.97 3.23 2 5.0
Shift C 8.68 4.92 3.20 2 5.0
Average 8.68 6.03 3.92 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.72 7.19 4.67 2 5.0
Shift B 8.70 5.31 3.45 2 5.0
Shift C 8.72 6.06 3.94 2 5.0
Average 8.71 6.19 4.02 2.00 5.00 0.00
U POWER
WTP
ATER DATE 05.10.2018
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
28.53 1.06
2.32
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 1.10 Mtr
3
M DEAREATOR LEVEL : 1429 mm
0 0 0 4 mm- 6 mm
LINE -II
Stage II
05.10.2018
COC(TDS)
COC(TDS)
1.06
2.32
22 M3
32.5 M3
1045 M3
631 M3
146 M3
80 %
PORT (BC 2 )
< 4 mm
AVG LOAD
STG-2 MW 13.70
ΔT Vacum
11.7 -85.5
ΔT Vacum
12.8 -79.17
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
1 MB -315
ressure & P.Flow data
Prod.pres
0.50
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
0.50
0.7
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
2.2 10
DM WATER (MIXED BED OUTLET)
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
6.5-7.8 <1 < 0.6 NIL NIL NIL 0.020 NIL
Shift A 7.14 0.87 0.57 0 0 0.015
Shift B 7.14 0.90 0.59 0 0 0.015
Shift C 7.13 0.88 0.57 0 0 0.016
Average 7.14 0.88 0.57 0.00 0.00 0.00 0.015 0.00
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 8.74 7.38 4.80 2 5 0.017
Shift B 8.79 7.22 4.69 2 5 0.017
Shift C 8.76 7.42 4.82 2 5 0.017
Average 8.76 7.34 4.77 2.00 5.00 0.00 0.017 0.00
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.76 10.08 6.55 2 5 0.018
Unit #2
Shift B 8.82 10.21 6.64 2 5 0.018
Shift C 8.69 9.87 6.42 2 5 0.017
Average 8.76 10.05 6.53 2.00 5.00 0.00 0.018 0.00
CBD WATER
Shift/Time
Unit #1
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 9.28 58.5 38.00 10 20 0.77 25.0
Shift B 9.32 59.4 38.61 15 34 0.84 23.0
Shift C 9.49 75.4 49.01 14 30 0.62 24.0
Average 9.36 64.42 41.87 13.00 28.00 0.00 0.74 24.00
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.52 109.1 70.92 15 34 0.24 25.0
Shift B 9.53 104.2 67.73 15 32 0.24 24.0
Shift C 9.38 87.4 56.84 14 33 0.25 24.0
Average 9.48 100.25 65.16 14.67 33.00 0.00 0.24 24.33
Remarks
FEED BACK POWER O & M , SITE : KARIANGAU POWER
DAILY WATER ANALISIS REPORT FOR - WTP
RO PLANT WATER
COND
R.O PLANT pH T.H ppm Ca.H ppm Mg.H ppm T.AKL ppm
µs/cm
SW RO # 1 (Fresh Tank) 7.42 1450.0
SW RO # 2 (Fresh Tank)
BW RO # 1(Before MB)
BW RO # 2(Before MB) 7.34 132.4
,
0 0 0 0 10 7 0 0
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 8.70 5.36 3.48 2 5.0
Shift B 8.70 5.36 3.48 2 5.0
Shift C 8.74 5.28 3.43 2 5.0
Average 8.71 5.33 3.47 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.75 5.89 3.83 2 5.0
Shift B 8.76 5.89 3.83 2 5.0
Shift C 8.72 6.04 3.93 2 5.0
Average 8.74 5.94 3.86 2.00 5.00 0.00
U POWER
WTP
ATER DATE 06.10.2018
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
29.42 1.20
2.27
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 1.30 Mtr
3
M DEAREATOR LEVEL : 1518 mm
4 7 3 4 mm- 6 mm
LINE -II
Stage II
06.10.2018
COC(TDS)
COC(TDS)
1.20
2.27
26 M3
34.5 M3
1680 M3
631 M3
151 M3
80 %
PORT (BC 2 )
< 4 mm
AVG LOAD
STG-2 MW 13.70
ΔT Vacum
11.4 -85.2
ΔT Vacum
12.7 -78.43
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
MB -306
ressure & P.Flow data
Prod.pres
0.50
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
0.50
0.7
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
2.2 10
DM WATER (MIXED BED OUTLET)
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
6.5-7.8 <1 < 0.6 NIL NIL NIL 0.020 NIL
Shift A 7.10 0.94 0.61 0 0 0.016
Shift B 7.12 0.93 0.60 0 0 0.014
Shift C 7.13 0.80 0.52 0 0 0.015
Average 7.12 0.89 0.58 0.00 0.00 0.00 0.015 0.00
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 8.78 8.14 5.29 2 5 0.018
Shift B 8.80 8.92 5.80 2 5 0.017
Shift C 8.75 8.14 5.29 2 5 0.018
Average 8.78 8.40 5.46 2.00 5.00 0.00 0.018 0.00
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.81 10.21 6.64 2 5 0.018
Unit #2
Shift B 8.82 9.31 6.05 2 5 0.017
Shift C 8.79 10.11 6.57 2 5 0.018
Average 8.81 9.88 6.42 2.00 5.00 0.00 0.018 0.00
CBD WATER
Shift/Time
Unit #1
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 9.55 108.4 70.46 15 34 0.80 25.0
Shift B 9.46 88.7 57.66 14 33 0.75 24.0
Shift C 9.53 106.4 69.16 15 32 0.78 25.0
Average 9.51 101.17 65.76 14.67 33.00 0.00 0.78 24.67
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.45 83.1 54.03 13 25 0.30 25.0
Shift B 9.50 99.5 64.68 14 30 0.28 24.0
Shift C 9.47 89.4 58.11 13 25 0.28 24.0
Average 9.47 90.67 58.94 13.33 26.67 0.00 0.29 24.33
Remarks
FEED BACK POWER O & M , SITE : KARIANGAU POWER
DAILY WATER ANALISIS REPORT FOR - WTP
RO PLANT WATER
COND
R.O PLANT pH T.H ppm Ca.H ppm Mg.H ppm T.AKL ppm
µs/cm
SW RO # 1 (Fresh Tank) 7.44 1460.0
SW RO # 2 (Fresh Tank)
BW RO # 1(Before MB)
BW RO # 2(Before MB) 7.32 138.4
,
0 0 0 0 10 0 50 50
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 8.66 4.75 3.09 2 5.0
Shift B 8.65 5.80 3.77 2 5.0
Shift C 8.66 4.93 3.20 2 5.0
Average 8.66 5.16 3.35 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.70 5.76 3.74 2 5.0
Shift B 8.69 6.75 4.39 2 5.0
Shift C 8.67 5.86 3.81 2 5.0
Average 8.69 6.12 3.98 2.00 5.00 0.00
U POWER
WTP
ATER DATE 07.10.2018
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
48.40 1.32
2.17
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 0.75 Mtr
3
M DEAREATOR LEVEL : 1668 mm
4 7 3 4 mm- 6 mm 9.80%
LINE -II
Stage II
07.10.2018
COC(TDS)
COC(TDS)
1.32
2.17
15 M3
37.9 M3
1680 M3
631 M3
151 M3
80 %
PORT (BC 2 )
< 4 mm 25.90%
AVG LOAD
STG-2 MW 9.70
ΔT Vacum
12.1 -85.7
ΔT Vacum
9.0 -86.89
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
2 MB -306
ressure & P.Flow data
Prod.pres
0.50
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
0.50
0.7
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
2.2 10
DM WATER (MIXED BED OUTLET)
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
6.5-7.8 <1 < 0.6 NIL NIL NIL 0.020 NIL
Shift A 7.12 0.91 0.59 0 0 0.014
Shift B 7.11 0.90 0.59 0 0 0.014
Shift C 7.10 0.91 0.59 0 0 0.014
Average 7.11 0.91 0.59 0.00 0.00 0.00 0.014 0.00
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Unit #1
Shift A 8.80 11.05 7.18 2 5 0.018
Shift B 8.72 8.87 5.77 2 5 0.018
Shift C 8.71 7.17 4.66 2 5 0.018
Average 8.74 9.03 5.87 2.00 5.00 0.00 0.018 0.00
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL < 0.02 BDL
Shift A 8.76 8.21 5.34 2 5 0.018
Unit #2
Shift B 8.78 11.68 7.59 2 5 0.019
Shift C 8.79 12.03 7.82 2 5 0.019
Average 8.78 10.64 6.92 2.00 5.00 0.00 0.019 0.00
CBD WATER
Shift/Time
Unit #1
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
Shift/Time pH T.H
µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Unit #1
Shift A 9.53 124.7 81.06 17 36 0.68 27.0
Shift B 9.47 115.8 75.27 15 32 0.64 25.4
Shift C 9.42 104.5 67.93 14 30 0.70 25.2
Average 9.47 115.00 74.75 15.33 32.67 0.00 0.67 25.88
COND TDS P.ALK M.ALK SiO2-ppm PO4-ppm
pH T.H
Shift/Time µs/cm PPM ppm ppm
9.3-10.4 < 100 < 65 < 15 < 40 NIL <2 < 40
Shift A Unit #2 9.35 72.4 47.06 12 26 0.28 24.5
Shift B 9.37 83.8 54.48 12 26 0.24 24.4
Shift C 9.35 79.0 51.35 12 25 0.25 24.3
Average 9.36 78.40 50.96 12.00 25.67 0.00 0.25 24.41
Remarks
FEED BACK POWER O & M , SITE : KARIANGAU POWER
DAILY WATER ANALISIS REPORT FOR - WTP
RO PLANT WATER
COND
R.O PLANT pH T.H ppm Ca.H ppm Mg.H ppm T.AKL ppm
µs/cm
SW RO # 1 (Fresh Tank) 7.46 1225.0
SW RO # 2 (Fresh Tank)
BW RO # 1(Before MB)
BW RO # 2(Before MB) 7.24 116.7
,
0 0 0 0 10 7 0 0
CONDENSATE WATER
Unit #1
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
Unit #1
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Shift A 8.64 6.78 4.41 2 5.0
Shift B 8.68 5.84 3.80 2 5.0
Shift C 8.65 5.08 3.30 2 5.0
Average 8.66 5.90 3.84 2.00 5.00 0.00
COND P.ALK
pH TDS M.ALK ppm T.H
Shift/Time µs/cm ppm
8.8-9.5 < 10 < 6.5 <4 <8 BDL
Unit #2 Shift A 8.66 7.25 4.71 2 5.0
Shift B 8.66 4.67 3.04 2 5.0
Shift C 8.66 5.13 3.33 2 5.0
Average 8.66 5.68 3.69 2.00 5.00 0.00
U POWER
WTP
ATER DATE 08.10.2018
SiO2-ppm FRC
T.CL ppm TURBD.(NTU) FRC(ppm) COC(TDS)
(ppm)
0
56.10 1.07
2.09
DM WATER PRODUCTION AND CONSUMPTION DETAILS :
M3 DRAIN TANK : 1.05 Mtr
3
M DEAREATOR LEVEL : 1598 mm
0 0 0 4 mm- 6 mm
LINE -II
Stage II
08.10.2018
COC(TDS)
COC(TDS)
1.07
2.09
21 M3
36.3 M3
1680 M3
631 M3
151 M3
80 %
PORT (BC 2 )
< 4 mm
AVG LOAD
STG-2 MW 12.29
ΔT Vacum
21.4 -85.0
ΔT Vacum
9.5 -85.76
ACW
ACW Range
Approach
#VALUE! #VALUE!
ATA
R/G Std MB Last OBR M3
0 MB#I -315
ressure & P.Flow data
Prod.pres
0.40
Prod.pres P.Flow M3
0.4 28.0
Prod.pres P.Flow M3
0.4 NA
g/cm2)
Δ P I/Δ P II Prod.pres
1.50
0.6
0.00
BWRO permeate & reject flow
T.Reject M3 T.Permit M3
3.2 8
0.0 0