Please find enclosed our detailed proposal for your kind consideration.
We believe that each client is unique and so we take a unique approach to each brief. In this case we
have noted and analysed your requirements as well as undertaking a thorough review of the site
including a feasibility analysis and a detailed costing and modelling of the whole project. Drawing
on our long experience in this area, we have come up with a solution to your exact specifications by
fusing form and function to create the ideal space for you. In practical terms we have also identified
and outlined key strategic milestones in the life of the project to ensure a smooth completion as well
as accountability throughout all stages of the build and compliance with all local and national laws
and regulations.
THE PROJECT
To provide Architectural Design consultancy service for the completion of 4000sq. ft. of Residence
villa.
Schematic Design
To produce design concept plans and sketches for key areas of the Project.
Design development
After approval of the concept plans and sketches, the scheme will be developed into design
elevation drawings, floor plan layouts and basic sections.
Construction drawings
After approval of the design concept and development, produce the necessary construction details,
specifications and for the contractor.
Tender
Issue the Construction Drawing, Specifications, Schedules and Bill of Quantities to selected
Contractors of costing
Site inspection
To co-ordinate with the contractor and suppliers on-site, to ensure that the work are completed
correctly with the specified materials to the required standard
Westfield, Opp. St. Xaviers School, Ghod Dod Rd,
Surat, Gujarat 395007
Phone 1234567891
www.sgarchitecture.com
PAYMENT TERMS
Our professional fee for seeing the project through from start to completion will be
7.5% of the total cost which is 4,50,000
STAGES PERCENTAGE AMOUNT IN
RS.
Total 4,50,000/-
PAYMENT SCHEDULE
Professional services will be invoiced at the end of each stage based upon the percentage or pro-rata
of percentage of work completed. Each phase of week wall requires approval in writing and
payment in full by the Client prior to commencement of wok on the subsequent phases. Invoices
shall be due and payable by the Client within 30 days of date of invoice.
*This lump sum fee is not inclusive of service tax where applicable which shall be borne by the
Client.
*This proposal shall remain open for sixty day and is withdrawn if not accepted within that period.
Westfield, Opp. St. Xaviers School, Ghod Dod Rd,
Surat, Gujarat 395007
Phone 1234567891
www.sgarchitecture.com
Responsibility of Contractor
• Plan important project development and implementation in advance.
• Determination and estimation of various issues in the project such as needed materials, equipment.
• Anticipation of any potential modification in the project.
• Making sure that health and safety specifications are followed.
• Practicing excellent communication between all parties involved in the construction such as client and
subcontractors.
• Determine legal and regulatory requirements
• Main contractor is responsible to find and hire right subcontractors and individuals to complete the job.
manage equipment, materials, and other services required for smooth flow of the project.
• Manage generated waste
• Submit bills based on terms of contract documents.
• Monitor project in terms of time schedule, safety, work quality, and other project-related details as
specified in the project contract.
• Review, modify, and update the project prgramme dependent on latest changes and feedback.
• Making sure the project is in compliance with all the necessary legal and regulatory issues.
• Guarantee viable safety policy to ensure health and safety in the workplace. This may involve risk
management strategies, emergency response system, and other preventive means for construction site
safety.
• Make sure that all individual at construction site utilize safety equipment.
• Provide safety awareness to workers.
Client Acceptance
• You may accept this offer within 30 days after the date of this letter by:
1. Giving me written notice that you accept my offer
2. Returning a signed copy of this letter to me by email
Name: Date:
Sign: