University of Duhok Soil Mechanics Class: 3rd.

year
Faculty of Engineering and Applied Sciences Quiz-5 Date : 27/5/2012
Civil Engg. Dept. 2011/2012 Time: 30 min.
Q1. The completed flow net for the dam shown in figure includes a steel-pile cutoff wall located at the
head-water side of the dam in order to reduce the seepage loss. The dam is half a kilometer in width
(shore to shore) and the permeability of the silty sand stratum is 3.5 x 10 -4 cm/sec. Find:
(a) the total seepage loss under the dam (in liters per year),
(b)Factor of safety against piping,
(c)Uplift pressure at points A and B.
(d)Would the dam be more stable if the cutoff wall was placed under its tail-water side?

-Good Luck- Assistant Prof./ Dr. Rafi’ M.S.