2011 NNE4G 4G#RO KKA085 1426 EATP Atp Checklist
2011 NNE4G 4G#RO KKA085 1426 EATP Atp Checklist
PO Number 4200010580
Site ID KKA085
BTS Equipment
SDR-BS8910A
Type
BTS Installation
Rack
Type
Green Field Indoor
Green Field Outdoor Rooftop
Site Type
In building Coverage 3rdParty Building/Tower
1
BTS SITE FOLDER
Table of Contents
SITE ACCEPTANCE CERTIFICATE.................................................................................1
1 Bill of Quantity.................................................................................................................3
1.1 General Information....................................................................................................4
1.2 BOQ of Installed Equipment.......................................................................................4
2 Site Specific Installation Data.........................................................................................4
2.1 Antenna and Feeder System......................................................................................4
2.1.1 Antenna Configuration.................................................................................................4
2.1.2 Feeder Configuration....................................................................................................5
2.1.3 Antenna Lines Sweep Test..........................................................................................5
2.1.4 Antenna Lines Quality Check List...............................................................................5
3 Equipment Installation and Commissioning Record....................................................6
3.1 BTS Installation Record..............................................................................................6
3.2 BOQ Modules............................................................................................................. 6
3.3 Module Serial Number................................................................................................7
3.3.1 BTS information............................................................................................................7
3.3.2 Transmission Link Information....................................................................................7
3.3.3 Power System...............................................................................................................7
3.3.4 Remote Access Test....................................................................................................7
4 Capture.............................................................................................................................8
4.1 LMT : Base Station Topology (Before)........................................................................8
4.2 LMT : Base Station Topology (After)...........................................................................8
4.3 LMT : Software Version..............................................................................................9
4.4 LMT : Device Group...................................................................................................9
4.5 LMT : SCTP Configuration......................................................................................100
4.6 OSS : Base Station Topology (Before)...................................................................100
4.7 OSS : Base Station Topology (After)........................................................................11
4.8 OSS : CE (3G) / Resources Block (4G)...................................................................11
4.9 OSS : Cell Configuration...........................................................................................12
4.9 Module Serial Number .............................................................................................12
4.10 OSS : ENVA Simulation............................................................................................14
4.12.1 Main Fails (Dry Contact No.0)...................................................................................14
4.12.2 Rectifier Fails (Dry Contact No.1).............................................................................14
4.12.3 Low Battery (Dry Contact No.2)................................................................................15
4.12.4 High Temperature (Dry Contact No.3).....................................................................15
4.12.5 Enva History Alarm.....................................................................................................16
5 Drawing...........................................................................................................................17
6 Photo................................................................................................................................19
6.1 Site Access............................................................................................................... 19
6.2 Tower Name Plate....................................................................................................19
6.3 Equipment................................................................................................................ 20
6.4 View Antenna And RRU From Under Tower.............................................................20
6.5 Kwh Panel................................................................................................................ 21
6.6 MCB Kwh................................................................................................................. 21
6.7 Rectifier Rack........................................................................................................... 22
2
BTS SITE FOLDER
3
BTS SITE FOLDER
Bill of Quantity
1.1 General Information
Site ID Impl KKA085 Scope of Work New Site 4G LTE 2100 10 Mhz Site Type Rooftop/Greenfield/MCP/MCR/BHT
Site Name Impl TBG Batuputih Kolaka Utara Program Name - HI Done 10 Desember 2020
Site ID PO KKA085 PO Name 4G EQP #415 Sulawesi 2020 Connected Date 10 Desember 2020
Site Name PO TBG Batuputih Kolaka Utara PO Number 4200010580 Integrated Date 10 Desember 2020
Band L2100+U2100+DCS Tower Provider Protelindo Tower Height SST 72 Mtr
TI Partner PT.YPTT Tower Type SST Engineer Name Firmansyah
- - -
Antenna Type
- - -
Serial No
- - -
Direction
- - -
Mechanical Tilt
- - -
Electrical Tilt
- - -
Antenna Height
4
BTS SITE FOLDER
Hybrid Cable
5
BTS SITE FOLDER
5 OPTICAL INSTALLATION
5.1 Optic cables installed according to Site Specific Documents
5.2 Optic cables use conduit and secured in position with cable ties
5.3 Optic cables labelled correctly
5.4 Optic cables port plug in properly
5.5 Optic cables spare rolled with diameter minimum 140mm
5.6 Optic cables spare placed in a secure position
5.7 Optic cables installed separated with power cable
6
BTS SITE FOLDER
CCF0 1 PCS
SA N/A
CR0 N/A
FAC3 N/A
4 Capture
4.1 LMT : Base Station Topology (Before)
7
BTS SITE FOLDER
8
BTS SITE FOLDER
9
BTS SITE FOLDER
10
BTS SITE FOLDER
11
BTS SITE FOLDER
TRX 2G
12
BTS SITE FOLDER
13
BTS SITE FOLDER
14
BTS SITE FOLDER
5 Drawing
15
BTS SITE FOLDER
16
BTS SITE FOLDER
6 Photo
6.1 Site Access
17
BTS SITE FOLDER
6.3 Equipment
18
BTS SITE FOLDER
19
BTS SITE FOLDER
20
BTS SITE FOLDER
21
BTS SITE FOLDER
22
BTS SITE FOLDER
6.14 DCPD7
23
BTS SITE FOLDER
24
BTS SITE FOLDER
25
BTS SITE FOLDER
26
BTS SITE FOLDER
27
BTS SITE FOLDER
28
BTS SITE FOLDER
29
BTS SITE FOLDER
30
BTS SITE FOLDER
31
BTS SITE FOLDER
32
BTS SITE FOLDER
33
BTS SITE FOLDER
34
BTS SITE FOLDER
35
BTS SITE FOLDER
36
BTS SITE FOLDER
37
BTS SITE FOLDER
38
BTS SITE FOLDER
39
BTS SITE FOLDER
7 BOQ PO
40
BTS SITE FOLDER
41
BTS SITE FOLDER
8 ENGPAM of NODIN
42