Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 42

BTS SITE FOLDER

SITE ACCEPTANCE CERTIFICATE

PO Number 4200010580

Site ID KKA085

Site Name TBG Batuputih Kolaka Utara

Work Type New site/Collocated/Upgrade/Re-engineering

BTS Equipment
SDR-BS8910A
Type

BTS Installation
Rack
Type
 Green Field Indoor
 Green Field Outdoor  Rooftop
Site Type
 In building Coverage  3rdParty Building/Tower

LTE 2100 1/1/1


BTS Configuration U2100 1/1/1 BAND DCS/3G/LTE/U900/eGSM
DCS 3/3/3
Jl. Trans Malili Ds.Batuputih Kec.Batuputih Kab.Kolaka Utara
Site Address
Prop.Sulawesi tenggara
Installer Name Karimuddin

Installer Mobile 085256159890


Name

Engineer Name Firmansyah

Engineer Mobile 085299336949


Number

Installation Date 10 Desember 2020

Self-Assessment 10 Desember 2020


Date

Connected Date 10 Desember 2020

On Air Date 28 Desember 2020

1
BTS SITE FOLDER

Table of Contents
SITE ACCEPTANCE CERTIFICATE.................................................................................1
1 Bill of Quantity.................................................................................................................3
1.1 General Information....................................................................................................4
1.2 BOQ of Installed Equipment.......................................................................................4
2 Site Specific Installation Data.........................................................................................4
2.1 Antenna and Feeder System......................................................................................4
2.1.1 Antenna Configuration.................................................................................................4
2.1.2 Feeder Configuration....................................................................................................5
2.1.3 Antenna Lines Sweep Test..........................................................................................5
2.1.4 Antenna Lines Quality Check List...............................................................................5
3 Equipment Installation and Commissioning Record....................................................6
3.1 BTS Installation Record..............................................................................................6
3.2 BOQ Modules............................................................................................................. 6
3.3 Module Serial Number................................................................................................7
3.3.1 BTS information............................................................................................................7
3.3.2 Transmission Link Information....................................................................................7
3.3.3 Power System...............................................................................................................7
3.3.4 Remote Access Test....................................................................................................7
4 Capture.............................................................................................................................8
4.1 LMT : Base Station Topology (Before)........................................................................8
4.2 LMT : Base Station Topology (After)...........................................................................8
4.3 LMT : Software Version..............................................................................................9
4.4 LMT : Device Group...................................................................................................9
4.5 LMT : SCTP Configuration......................................................................................100
4.6 OSS : Base Station Topology (Before)...................................................................100
4.7 OSS : Base Station Topology (After)........................................................................11
4.8 OSS : CE (3G) / Resources Block (4G)...................................................................11
4.9 OSS : Cell Configuration...........................................................................................12
4.9 Module Serial Number .............................................................................................12
4.10 OSS : ENVA Simulation............................................................................................14
4.12.1 Main Fails (Dry Contact No.0)...................................................................................14
4.12.2 Rectifier Fails (Dry Contact No.1).............................................................................14
4.12.3 Low Battery (Dry Contact No.2)................................................................................15
4.12.4 High Temperature (Dry Contact No.3).....................................................................15
4.12.5 Enva History Alarm.....................................................................................................16
5 Drawing...........................................................................................................................17
6 Photo................................................................................................................................19
6.1 Site Access............................................................................................................... 19
6.2 Tower Name Plate....................................................................................................19
6.3 Equipment................................................................................................................ 20
6.4 View Antenna And RRU From Under Tower.............................................................20
6.5 Kwh Panel................................................................................................................ 21
6.6 MCB Kwh................................................................................................................. 21
6.7 Rectifier Rack........................................................................................................... 22

2
BTS SITE FOLDER

6.8 Rectifier Display Information (CL).............................................................................22


6.9 Enva On Rectifier.....................................................................................................23
6.10 Rectifier Battery........................................................................................................23
6.11 MCB BTS Connection...............................................................................................23
6.12 BBU Installation (Before)..........................................................................................24
6.13 BBU Installation (After).............................................................................................25
6.14 DCPD7..................................................................................................................... 25
6.15 LAN Cable on BBU to Transmission.........................................................................26
6.16 RRU Optical Cable On BBU.....................................................................................26
6.17 Grounding Bar BTS Cabinet.....................................................................................27
6.18 Grounding Bar Site...................................................................................................27
6.19 Horizontal Cable Tray...............................................................................................28
6.20 Vertical Cable Tray...................................................................................................28
6.21 Earthing Kit and Lower Bushbar...............................................................................29
6.22 RRU Installation Sector 1.........................................................................................29
6.23 RRU Installation Sector 2.........................................................................................30
6.24 RRU Installation Sector 3.........................................................................................30
6.25 RRU Grounding Installation Sector 1........................................................................30
6.26 RRU Grounding Installation Sector 2........................................................................31
6.27 RRU Grounding Installation Sector 3........................................................................32
6.28 Antenna Installation Sector 1....................................................................................32
6.29 Antenna Installation Sector 2....................................................................................32
6.30 Antenna Installation Sector 3....................................................................................33
6.31 GPS & Feeder ......................................................................................................... 33
6.32 Filter Sector 1........................................................................................................... 33
6.33 Filter Sector 2........................................................................................................... 33
6.34 Filter Sector 3........................................................................................................... 33
6.35 Antenna Azimuth Sector 1........................................................................................33
6.36 Antenna Azimuth Sector 2........................................................................................36
6.37 Antenna Azimuth Sector 3........................................................................................37
6.38 Antenna Mechanical Tilt Sector 1.............................................................................37
6.39 Antenna Mechanical Tilt Sector 2.............................................................................38
6.40 Antenna Mechanical Tilt Sector 3.............................................................................38
6.41 Antenna Electrical Tilt Sector 1.................................................................................39
6.42 Antenna Electrical Tilt Sector 2.................................................................................39
6.43 Antenna Electrical Tilt Sector 3.................................................................................39
6.44 Antenna Serial No. Sector 1.....................................................................................40
6.45 Antenna Serial No. Sector 2.....................................................................................40
6.46 Antenna Serial No. Sector 3.....................................................................................40
7 BOQ PO..........................................................................................................................41
8 ENGPAM of NODIN.....................................................................................................41

3
BTS SITE FOLDER

Bill of Quantity
1.1 General Information
Site ID Impl KKA085 Scope of Work New Site 4G LTE 2100 10 Mhz Site Type Rooftop/Greenfield/MCP/MCR/BHT
Site Name Impl TBG Batuputih Kolaka Utara Program Name - HI Done 10 Desember 2020
Site ID PO KKA085 PO Name 4G EQP #415 Sulawesi 2020 Connected Date 10 Desember 2020
Site Name PO TBG Batuputih Kolaka Utara PO Number 4200010580 Integrated Date 10 Desember 2020
Band L2100+U2100+DCS Tower Provider Protelindo Tower Height SST 72 Mtr
TI Partner PT.YPTT Tower Type SST Engineer Name Firmansyah

1.2 BOQ of Installed Equipment


Item Unit Based On PO Based On Existing Based On Implementation Remark
GSM+DCS;L900(10)/L1800(1
Band - L2100+U2100+DCS 0) L2100+U2100+DCS New
BTS Cabinet (B8910A) Rack - BC8910A 1 Rack - Existing
BTS Type - - Outdoor - Existing
Number Of Sector - 3 3 3 New
L2100 1/1/1 GSM 3/3/3 L2100 1/1/1
U2100 1/1/1 DCS 3/3/3 U2100 1/1/1
DCS 3/3/3 L900 1/1/1 DCS 3/3/3 New
Cell Configuration - L1800 1/1/1

R8872A 3 Pcs Replace R8872A to R8894E


R8894E M1821 3 Pcs R8852E 3 Pcs R8894E M1821 3 Pcs 3 Pcs
RRU Pcs
BPN2 3 Pcs
CR0 1 PCS
FS5 1 PCS
PM5 1` Pcs
PM5 1 PCS PM3 1 PCS PM5 1 PCS Replace PM3 to PM5 1 Pcs
Board Processing Pcs FAC0 1 Pcs
CE/RB Configuration - 10 Mhz - 10 Mhz New
Replace CC16B to CCF0 1
CC16B 1PCS
CC Board Pcs CCF0 1 PCS CCF0 1 PCS Pcs
DCPD Pcs DCPD10B 1 PCS - DCPD10B 1 PCS New
Filter Pcs - - - -
MCB Pcs MCB 100A 2 PCS - MCB 100A 2 PCS -
Antenna Type Sector 1 Pcs - APXVBB4L26X_43-C-l20 - Existing
Antenna Type Sector 2 Pcs - APXVBB4L26X_43-C-l20 - Existing
Antenna Type Sector 3 Pcs - APXVBB4L26X_43-C-l20 - Existing
Antenna Height Sector 1 Mtr - - - Existing
Antenna Height Sector 2 Mtr - - - Existing
Antenna Height Sector 3 Mtr - - - Existing
Antenna Tilting Sector 1 Pcs - - - Existing
Antenna Tilting Sector 2 Pcs - - - Existing
Antenna Tilting Sector 3 Pcs - - - Existing
Feeder Type Pcs - - - Existing

2 Site Specific Installation Data


2.1 Antenna and Feeder System
2.1.1 Antenna Configuration

ITEM SECTOR 1 SECTOR 2 SECTOR 3 SECTOR 4 SECTOR 5 SECTOR 6

- - -

Antenna Type
- - -
Serial No
- - -
Direction
- - -
Mechanical Tilt
- - -
Electrical Tilt
- - -
Antenna Height

4
BTS SITE FOLDER

2.1.2 Feeder Configuration


  Actual Feeder Installed
  SECTOR 1 SECTOR 2 SECTOR 3 SECTOR 4 SECTOR 5 SECTOR 6
FEEDER
Feeder Cable Type

Installed Feeder Length

Top Jumper Length

Bottom Jumper Length


FEEDERLESS
- - -
Optical Length
- - -
Power Cable Length SM - RF

Hybrid Cable

2.1.3 Antenna Lines Sweep Test


SECTOR 1 PA – ANT 1 PA – ANT 2
VSWR Value 1.1 1.1
SECTOR 2 PA – ANT 1 PA – ANT 2
VSWR Value 1.1 1.1
SECTOR 3 Tx1/Rx1 Tx2/Rx2
VSWR Value 1.1 1.2
SECTOR 4 Tx1/Rx1 Tx2/Rx2
VSWR Value <..> <..>
SECTOR 5 Tx1/Rx1 Tx2/Rx2
VSWR Value <..> <..>
SECTOR 6 Tx1/Rx1 Tx2/Rx2
VSWR Value <..> <..>

2.1.4 Antenna Lines Quality Check List


Item DESCRIPTION OK NOK
1 EQUIPMENT PREPARATION
1.1 Delivery checked, shortcomings recorded 
1.2 Transport damages recorded 
2 SITE PREPARATION
Equipment layout checked, differences to the drawings
2.1 
Recorded
2.2 Cabling routes checked, cable trays & ladders installed 
2.3 Antenna tower/pole grounding checked 
3 ANTENNA AND RRU INSTALLATION
3.1 Antenna and RRU mounted according to Site Specific Documents 
3.2 Mounting height checked according to Final Site Configuration 
3.3 Lobe direction checked according to Final Site Configuration 
Mechanical tilting angle checked according to Final Site
3.4 
Configuration
Electrical tilting angle checked according to Final Site
3.5 
Configuration
3.6 Antenna and RRU mounting clamps checked, all screws tightened 
4 FEEDER INSTALLATION
Antenna feeder and jumper connectors checked and tightened
4.1 
at both ends
4.2 All external connectors checked for correct sealing N/A
BTS jumper cable connectors checked and tightened at both
4.3 N/A
Ends

5
BTS SITE FOLDER

5 OPTICAL INSTALLATION
5.1 Optic cables installed according to Site Specific Documents 
5.2 Optic cables use conduit and secured in position with cable ties 
5.3 Optic cables labelled correctly 
5.4 Optic cables port plug in properly 
5.5 Optic cables spare rolled with diameter minimum 140mm 
5.6 Optic cables spare placed in a secure position 
5.7 Optic cables installed separated with power cable 

3 Equipment Installation and Commissioning Record


3.1 BTS Installation Record
Item DESCRIPTION OK NOK
1 PREPARATION
1.1 Delivery checked, shortcomings recorded 
1.2 Transport damages recorded 
2 SITE PREPARATION
Equipment layout checked, differences to the drawings
2.1 
Recorded
2.2 Cabling routes checked, cable trays installed 
2.3 Installation of main grounding bar (connection to building earth) checked 
3 CABINET INSTALLATION
3.1 BTS installed according to the Site Specific Documents 
3.2 Cabinets fixed to wall or floor, secured and feet adjusted 
3.3 Each BTS cabinet connected to main grounding bar 
3.4 Power cables to BTS cabinets connected and marked 
3.5 Optical and RRU Power Cable connected to BTS and tightened 
3.6 Cables secured and tidy on cable tray 
4 EXTERNAL ALARM INSTALLATION
4.1 Alarm cable to BTS connected and marked 
4.2 Cables from equipment room alarm units (door etc.) connected and marked 
5 FINISHING
5.1 BTS cabinet rain cover are fitted and secured 
5.2 Packing materials removed from the site 
5.3 Rubbish removed and room cleaned and tidy 
6 DOCUMENTATION
6.1 Site Manager Photo and Capture LMT 

3.2 BOQ Modules


No Description Component Remark Type QTY
1 Cable Optic New FIBER-96928-001 3x90 Mtr
2 Cable Power DC Existing Blue black 15 Mtr
3 Rack Existing Main cabinet SDR-BS8910A 1 Box
4 Metal Tube Existing¢25(无铅 Metal Tube Diameter -
5 Antenna Mounting New Mounting Mounting Pcs
6 Antenna New Antenna Antenna 10 port (Rossenberg) -
7 Cable Jumper New Jumper ½ NM-NM HCF ½ 5M 3 Pcs
8 Power Cable RRU New 2x4mm NYY 3x90 Mtr
9 RRU Board New RRU R8894E M1821 3 Pcs
10 Hybrid Cable - - -
11 Board Module Additional Module BPN2 N/A
PM 5 1 PCS

6
BTS SITE FOLDER

CCF0 1 PCS
SA N/A
CR0 N/A
FAC3 N/A

3.3 Module Serial Number


No Module Name Part Number Serial Number
1 BPN2 - -
2 CR0 - -
3 PM5 - 725417900141
4 SA - -
5 CCF0 - 731705600188
6 DCPD10B 051603000056 LA0351205379
7 MCB 100 A - -
8 FAC3 - -
9 B8200 - -
10 R8894E M1821 130000189283 219240213224
11 R8894E M1821 130000189283 219242013119
12 R8894E M1821 130000189283 219242013221
13 Filter - -
14 Filter - -
15 Filter - -

3.3.1 BTS information


BTS Information VALUE
BTS/NodeB Name C_KKA085MR1_ TBG Batuputih Kolaka Utara
BTS/NodeB IP Address -
SW Version 4.17.10.20P85
BSC/RNC Name RNCZ POMALAA1
BSC/RNC ID -
BSC/RNC IP -
Enva Test Valid/Not Valid

3.3.2 Transmission Link Information


Near End Site Far End Site Medium Link Type Connection Type Vlan ID
TBG Batuputih Kolaka
Far End Site Optic - Ethernet 2517
Utara

3.3.3 Power System


PLN GENSET

21.20 KVA N/A

3.3.4 Remote Access Test


TEST DATE COMMENTS 
Abis/IuB Test 10 Desember 2020 Working 
External Alarm Test 10 Desember 2020 Working 
BTS Restart 10 Desember 2020 Working 
Local LMT Login 10 Desember 2020 Working 

4 Capture
4.1 LMT : Base Station Topology (Before)

7
BTS SITE FOLDER

4.2 LMT : Base Station Topology (After)

4.3 LMT : Software Version

4.4 LMT : Device Group

8
BTS SITE FOLDER

4.5 LMT : SCTP Configuration

4.6 OSS : Base Station Topology (Before)

9
BTS SITE FOLDER

4.7 OSS : Base Station Topology (After)

4.8 OSS : CE (3G) / Resources Block (4G)

10
BTS SITE FOLDER

4.9 OSS : Cell Configuration

11
BTS SITE FOLDER

TRX 2G

4.10 Module Serial Number

12
BTS SITE FOLDER

4.11 OSS : ENVA Simulation


4.11.1 Main Fails (Dry Contact No.0)

13
BTS SITE FOLDER

4.11.2 Rectifier Fails (Dry Contact No.1)

4.11.3 Low Battery (Dry Contact No.2)

4.11.4 High Temperature (Dry Contact No.3)

14
BTS SITE FOLDER

4.11.5 Enva History Alarm

5 Drawing

15
BTS SITE FOLDER

16
BTS SITE FOLDER

6 Photo
6.1 Site Access

6.2 Tower Name Plate

17
BTS SITE FOLDER

6.3 Equipment

6.4 View Antenna And RRU From Under Tower

18
BTS SITE FOLDER

6.5 Kwh Panel

6.6 MCB Kwh

19
BTS SITE FOLDER

6.7 Rectifier Rack

6.8 Rectifier Display Information (CL)

20
BTS SITE FOLDER

6.9 Enva On Rectifier

6.10 Rectifier Battery

21
BTS SITE FOLDER

6.11 MCB BTS Connection

6.12 BBU Installation (Before)

22
BTS SITE FOLDER

6.13 BBU Installation (After)

6.14 DCPD7

23
BTS SITE FOLDER

6.15 LAN Cable on BBU to Transmission

6.16 RRU Optical Cable On BBU

24
BTS SITE FOLDER

6.17 Grounding Bar BTS Cabinet

6.18 Grounding Bar Site

25
BTS SITE FOLDER

6.19 Horizontal Cable Tray

6.20 Vertical Cable Tray

26
BTS SITE FOLDER

6.21 Earthing Kit and Lower Bushbar

6.22 RRU Installation Sector 1

27
BTS SITE FOLDER

6.23 RRU Installation Sector 2

6.24 RRU Installation Sector 3

28
BTS SITE FOLDER

6.25 RRU Grounding Installation Sector 1

6.26 RRU Grounding Installation Sector 2

29
BTS SITE FOLDER

6.27 RRU Grounding Installation Sector 3

6.28 Antenna Installation Sector 1

30
BTS SITE FOLDER

6.29 Antenna Installation Sector 2

6.30 Antenna Installation Sector 3

31
BTS SITE FOLDER

6.31 GPS & Feeder

6.32 Filter Sector 1

32
BTS SITE FOLDER

6.33 Filter Sector 2

6.34 Filter Sector 3

33
BTS SITE FOLDER

6.35 Antenna Azimuth Sector 1

6.36 Antenna Azimuth Sector 2

34
BTS SITE FOLDER

6.37 Antenna Azimuth Sector 3

6.38 Antenna Mechanical Tilt Sector 1

35
BTS SITE FOLDER

6.39 Antenna Mechanical Tilt Sector 2

6.40 Antenna Mechanical Tilt Sector 3

36
BTS SITE FOLDER

6.41 Antenna Electrical Tilt Sector 1

6.42 Antenna Electrical Tilt Sector 2

37
BTS SITE FOLDER

6.43 Antenna Electrical Tilt Sector 3

6.44 Antenna Serial No. Sector 1

38
BTS SITE FOLDER

6.45 Antenna Serial No. Sector 2

6.46 Antenna Serial No. Sector 3

39
BTS SITE FOLDER

7 BOQ PO

40
BTS SITE FOLDER

41
BTS SITE FOLDER

8 ENGPAM of NODIN

42

You might also like