Risk Assessment
AREA LOCATION WORK PERMIT NO NATURE OF WORK BEING CARRIED OUT EXACT LOCATION OF WORK
JETTY Above ground GROUNDING OF PORTABLE EQUIPMENT AND CONTAINER
BPS □ Below ground TERMINAL,BPS & JETTY
TERMINAL □ Indoors
□ OTHER (specify): □ Outdoors
NOTE: Refer to overleaf for instructions on how to complete the table below
Column 1 Column 2 Column 3 Column 4/5 Column 6 Column 7 Column 8/9 Column 10 Column 11
Initial Risk Initial Risk Residual Risk Residual
Rating Factor Risk Control Measure(s) Rating Risk Factor Risk
Activity Potential Hazard Risks Identified
(Column 4 x Implemented (Column 8 x Acceptable?
Probability Severity Probability Severity
Column 5) Column 9)
USE OF
PORTABLE
EQUIPMENT
AND Static Charge -Fire 2 4 8 -Grounding/Earthing of 1 4 4 Acceptable
CONTAINER -Shock equipment at a place
-Anti-static plates are
available
Risk Assessment Methodology Probability Rating Guide Severity Rating Guide Risk Factor Matrix and Risk Category Table
Mina Petroleum LLC
Raysut road. P.O. Box 1506
Zip code 211 Salalah, Sultanate of Oman
RISK ASSESSMENT FORM
QHSSE-FM-QA0003-REV01
SEVERITY
5. Multiply Probability and Severity ratings to obtain the Initial Risk unlikely to occur)
potential to render 3 12 9 6 3
Factor and enter in Column 6. property/equipment temporarily
6. Assess this Initial Risk Factor using the Risk Category Table to
determine whether any risk control measures are required.
1 – Remotely probable out of service) 2 8 6 4 2
(Extremely unlikely to occur)
7. Specify and implement the required risk control measures in
Column 7. 2 – Moderate (Minor 1 4 3 2 1
8. Repeat Steps 2 - 4 above, taking into account the implemented injury/illness, not likely to be an
risk control measures to obtain the Residual Risk Ratings in LTI, potential minor damage to Risk Category Table
Columns 8 & 9. property/equipment) Risk Factor Range Risk Category
9. Multiply Probability and Severity ratings to obtain the Residual
Risk Factor and enter in Column 10.
10. Assess this Residual Risk Factor using the Risk Factor Matrix and 1 – Negligible (Minor first-aid if 8 - 16 High Risk
Risk Category Table to determine whether the residual risk is anything, no threat to 4–6 Medium Risk
acceptable or if further risk control measures are required property/equipment)
(Column 11) 1–3 Low Risk
Risk Assessment completed by (print name) Oliver Torres QHSSE reviewer (print name) Musallam Almashani
Designation Operations Superintendent Designation Manager
Sign/Date Sign/Date