Professional Documents
Culture Documents
Design - RH Structure 3
Design - RH Structure 3
Design - RH Structure 3
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
NOTES
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
GENERAL
300
300
150
LINKS: T8-150-01'
The contractor must check
300
'
01
150
2T12-13 13
13
200
13
and verify all dimensions on site
SECTION 13-13 before commencement of worK
I BM10: 300X200MM J CONSTRUCTION
2,200
2T12-14 All slabs at ground to be poured
14 14 14
over 1000 gauge polythene sheet
150
DPM
300
300
300
LINKS: T8-150-01'
'
01
150
14 14 on 50mm thick stone dust or
2T12-14 14 murram
200
SECTION 14-14
150
300
300
300
LINKS: T8-150-01' LINKS: T8-150-01' 01
'
CIVIL
150
15 15
SECTION 15-15
150
150
300
350
300
' '
LINKS: T8-150-01' LINKS: T8-150-01' LINKS: T8-150-01' 01 01
350
All vegetable and black cotton
150
200
17 17
3T16-16 16 16
3T12-17 16
3T12-17
16
200
16
200 soil
SECTION 17-17
4 9 11 14 16 17
SECTION 16-16
to be removed from below
all buildings andpaved surfaces
BM13: 350X200MM BM13: 300X200MM
For all R.C work,
5,300 Refer to the Structural Engineers
1,400 1,700 1,900 300 18 18 details
Depth of foundations to be
150
3T12-18 3T12-18 01
'
350
18 18 determined
200
18 18
on site to Structural Engineers
300
300
LINKS: T8-150-01'
2T12-19 19
150
to comply with RBS specifications
300
'
01
150
14 BM15: 300X200MM 16 19
200
19
SECTION 19-19
3,100 REVISIONS
2T12-20 NO DESCRIPTIONS DATE
20
300
300
LINKS: T8-150-01'
2T12-20 20
9 BM16: 300X200MM 14
5,800
600 3,300 1,900
3T12-21 3T12-21 20 20
21 21
150
300
PROJECT DETAILS
'
01
300
150
LINKS: T8-150-01' 20 20
200
300
LINKS: T8-150-01' 21 21
DRAWING TITLE
150
'
01
350
2T12-22 22
200
21 21 BEAM DETAILS-2
M BM18: 300X200MM P 200
SECTION 21-21
PAPER SIZE: A0
GSPublisherVersion 0.87.100.100
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
NOTES
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
+7.90 +7.90
GENERAL
3,500
23 23
2T12-23 All dimensions are shown in mm
T8-150-01'
T8-150-01'
150
23
900
900
300
unless otherwise
'
01
4T16-02 5T16-06
150
300
300
specified
LINKS: T8-150-01' 23 23 23 +7.00 +7.00 +7.00 +7.00
200
200
200
200
200
SECTION 23-23
3T12-23 23
Only figured dimensions to be
M Q
used.
BM19: 300X200MM
The contractor must check
2,950 and verify all dimensions on site
2T12-24 4T16-02 4T16-04 5T16-06 5T16-08
before commencement of worK
24
CONSTRUCTION
24 24
150
300
300
300
LINKS: T8-150-01' 02 02 04 04 06 06 08 08
'
01
150
3,300
3,300
3,300
3,300
24 24
All slabs at ground to be poured
T8-150-01'
T8-150-01'
T8-150-01'
T8-150-01'
2T12-24 24 200
SECTION 24-24
over 1000 gauge polythene sheet
M BM20: 300X200MM Q DPM
on 50mm thick stone dust or
3,100 murram
7,900
7,900
2T12-25 on approved grade hardcore
25 25 25
+3.50 +3.50 +3.50 +3.50 fillings.
150
7,000
7,000
All soil under the slabs
300
150 150
150 150
150 150
150 150
300
300
'
01
LINKS: T8-150-01'
300
300
300
300
150
25 25 and all around external
foundation to be
200
2T12-25 25 SECTION 25-25
T8-150-01'
T8-150-01'
T8-150-01'
T8-150-01'
2T12-26 26 26
All soils on cut embarkment
26
150
to be stabilised. The slope not to
3,200
3,200
3,200
3,200
300
'
01
300
300
150
LINKS: T8-150-01'
26 26
4T16-01 4T16-03 5T16-05 5T16-07
exceed the natural angle of
repose.
200
SECTION 26-26
2T12-26 26
STRUCTURAL
B BM22: 300X200MM D
300
300
300
300
300
300
300
300
G.B: 200X200MM G.B: 200X200MM G.B: 200X200MM G.B: 200X200MM
all buildings andpaved surfaces
300
300
'
01
150
2T12-27 27 27 27 COLUMN C01: COLUMN C02: COLUMN C03: COLUMN C04: details
200 200x200 MM 200x200 MM 300x200 MM 300x200 MM
SECTION 27-27 Depth of foundations to be
2 BM23: 300X200MM 5
determined
200 200 200 200
300 300
300 300
on site to Structural Engineers
approval.
01 01 02 02 07 07 08 08
01' 01' 03 03 04 04 01' 01'
200
200
200
200
01' 01' 05 05 05 06 06 06
200
200
01' 01' 07 07 08 08
200
200
01 01 02 02 03 04
03 04
1,900 05 05 05 06 06 06
COLUMN C01:
SECTION 01-01
COLUMN C01:
SECTION 02-02 COLUMN C02: COLUMN C02:
COLUMN C03:
COLUMN C04:
SECTION 07-07
COLUMN C04:
SECTION 08-08 All walls less than 200mm thick
3T12-28
SECTION 03-03 SECTION 04-04 COLUMN C03:
SECTION 05-05 SECTION 06-06
300
300
LINKS: T8-150-01'
'
01
28 28
1,000
1,000
1,000
1,000
150
300
300
LINKS: T8-150-01'
300
'
01
150
29 29 REVISIONS
2T12-29 29
NO DESCRIPTIONS DATE
200
SECTION 29-29
150
150
BM25: 300X200MM 5 150MM THK 150MM THK
300
300
G.SLAB G.SLAB
4T12 4T12
1,700
1,700
2,000
2,000
T8-100 T8-100
01 01 02 02 PROJECT DETAILS
CONSULTANT:
250
250
LOCATION:
50MM Thk blinding 50MM Thk blinding
50
50
concrete concrete
1,000
1,400
DRAWN BY:
CHK'D BY:
SCALE: AS SHOWN
5T12-01-150B2
DATE: APRIL - 2020
7T12-01-150B2
DRAWING TITLE
1,400
1,000
BEAM, COLUMNS AND FOOTING
DETAILS
5T12-01-150B1
7T12-01-150B1
1,000 PAPER SIZE: A0
1,400
COLUMN BASE CB1 DRAWING CODE / SHEET NUMBER
COLUMN BASE CB2
GSPublisherVersion 0.87.100.100
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
NOTES
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
GENERAL
A B C D E F G H I J K L M N O P Q
A B C D E F G H I J K L M N O P Q All dimensions are shown in mm
unless otherwise
specified
Drawings are not to be scaled.
RHS 100X50X2
RHS 100X50X2
RHS 100X50X2
17 17
17 C01 C01 C01 C01 C01 C01 C01 17 Only figured dimensions to be
695
16 16
16 16
RB: 200X200MM RB: 200X200MM RB: 200X200MM RB: 200X200MM RHS 100X50X2 used.
900
The contractor must check
695
1,435
970 970
15 15
15 RHS 100X50X2 150mm thick slab 15 and verify all dimensions on site
RB: 200X200MM
RB: 200X200MM
RB: 200X200MM
with T12@150mm before commencement of worK
870
RB: 200X200MM
RHS 100X50X2
14
FL: C02 C02 C02 C02 FL: C01
14
14 14 CONSTRUCTION
1,435
RB: 200X200
RB: 200X200
7.00 7.00
1,100
13 RHS 100X50X2 13
13 13
TRUSS 01 TRUSS 01 All slabs at ground to be poured
C01 C04 12 12 over 1000 gauge polythene sheet
RB: 200X200MM
12 12 200 500
625 625 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 750 DPM
11 11
11 11 on 50mm thick stone dust or
2,000
2,000
2,000
C02 C02 C02
RB: 200X200MM
1,700
1,700
1,700
8 8
FL: FL: foundation to be
FL:
7.00 7.00
7.00 treated with anti-termites
RB: 200X200MM 7 7
C03 insecticide
RB02: 300X200MM
7 7 6 TRUSS 01 TRUSS 01 6
C01
RB: 200X200MM
RB: 200X200MM
6 C01 C02 6
CIVIL
RB: 200X200MM
200
2,300
2,300
2,300
850 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 750
All soils on cut embarkment
to be stabilised. The slope not to
C01 TRUSS 02 TRUSS 02 exceed the natural angle of
5 5
5 5 repose.
RB: 200X200MM
1,200
1,200
1,200
RB02:300X200MM STRUCTURAL
C01 RB: 200X200MM C04 RB02: 300X200MM C02 RB: 200X200MM C03 TRUSS 02 TRUSS 02
4 4
4 4
1,167 1,167 1,167
All vegetable and black cotton
950
soil
1,440
1,440
3 3
RB: 200X200MM
RB: 200X200MM
3 3
C01 to be removed from below
RHS 100X50X2
RHS 100X50X2
RHS 100X50X2
RHS 100X50X2
RB: 200X200MM
2 2
2 2
all buildings andpaved surfaces
1,000
FL: FL: TRUSS 03 For all R.C work,
1,440
1,440
7.00 7.00 Refer to the Structural Engineers
1,000
details
C01 1,167 1,167 1,167 TRUSS 03 Depth of foundations to be
RB: 200X200MM RB: 200X200MM 1 1
1 1 determined
C01 C01
on site to Structural Engineers
approval.
A B C D E F G H I J K L M N O P Q
A B C D E F G H I J K L M N O P Q All walls less than 200mm thick
to be reinforced with hoop irons
RING BEAM LAYOUT ROOF TRUSS LAYOUT
at every alternating course.
All adjacent R.C works and
masonary wall to be tied with
strap iron at every course.
MECHANICALS
1,1 10 10
794
794
1, 1, 7 1,1
1,2 1,2 50
738
738
50 7
681
681
1,0 50 27 50
27
625
625
1,1 1,1 99 99
569
569
1 99 7 1,
513
513
99 1,0 1
456
456
REVISIONS
750
200 200
900
370 880 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 880 370
TRUSS 01
16,900
3T12
250 200
NO DESCRIPTIONS DATE
TOP & BOTTOM CHORDS: 40X40X3
50
3T12
300
VERTICALS & DIAGONALS: 40X40X2 T8-150
200
PURLINS: 40X40X2 T8-150 T8-150
150
150
MATERIAL: S275
3T12 3T12
350 350 TYPICAL RING TYPICAL RING Ring beam with gutter
BEAM SECTION BEAM SECTION & Parapet details.
RB:200X200MM RB02 :300X200MM
1, 1, 150
250 2 27 4 27 250
1,1 27 02 1,2
880
1,1 98 1, 2 27 4
789
787
33 33 39
667
660
1,1 39
606
70 86
596
1,1
545
533
1 1,0
484
470
70 1
435
430
430
423
56
9
200
370 550 550 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 1,000 380 570
15,620
TRUSS 02
TOP & BOTTOM CHORDS: 40X40X3
VERTICALS & DIAGONALS: 40X40X2
PURLINS: 40X40X2
MATERIAL: S275
350 350
PROJECT DETAILS
150 150
250 1,1
20 1,2 250
CONSULTANT:
850
72 20
1,2
699
611
548
71 1,0
58
430
1,0 LOCATION:
200
370 880 1,000 1,000 1,000 980 370 400
6,200
TRUSS 02
TOP & BOTTOM CHORDS: 40X40X3
VERTICALS & DIAGONALS: 40X40X2
DRAWN BY:
PURLINS: 40X40X2
CHK'D BY:
MATERIAL: S275
SCALE: AS SHOWN
DATE: APRIL - 2020
1
DRAWING TITLE
BOTTOM CHORD
4 ANCHOR
BOLTS
SECTION 1-1
10MMWELDS
(2SIDES)
PAPER SIZE: A0
BOTTOM CHORD
DRAWING CODE / SHEET NUMBER
GSPublisherVersion 0.87.100.100