Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

hange E hange E

XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y
NOTES

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

+7.90 +7.90
GENERAL
3,500
23 23
2T12-23 All dimensions are shown in mm

T8-150-01'

T8-150-01'
150
23

900

900
300
unless otherwise

'
01
4T16-02 5T16-06

150
300

300
specified
LINKS: T8-150-01' 23 23 23 +7.00 +7.00 +7.00 +7.00
200

Drawings are not to be scaled.

200
200

200

200
SECTION 23-23

3T12-23 23
Only figured dimensions to be
M Q
used.
BM19: 300X200MM
The contractor must check
2,950 and verify all dimensions on site
2T12-24 4T16-02 4T16-04 5T16-06 5T16-08
before commencement of worK
24
CONSTRUCTION
24 24

150
300

300

300
LINKS: T8-150-01' 02 02 04 04 06 06 08 08

'
01
150

3,300
3,300

3,300

3,300
24 24
All slabs at ground to be poured

T8-150-01'

T8-150-01'

T8-150-01'

T8-150-01'
2T12-24 24 200

SECTION 24-24
over 1000 gauge polythene sheet
M BM20: 300X200MM Q DPM
on 50mm thick stone dust or
3,100 murram

7,900

7,900
2T12-25 on approved grade hardcore
25 25 25
+3.50 +3.50 +3.50 +3.50 fillings.

150

7,000

7,000
All soil under the slabs
300

150 150
150 150

150 150

150 150
300

300

'
01
LINKS: T8-150-01'

300
300

300

300
150
25 25 and all around external
foundation to be
200
2T12-25 25 SECTION 25-25

treated with anti-termites


7 BM21: 300X200MM 11 insecticide
CIVIL
1,720
01 01 03 03 05 05 07 07

T8-150-01'

T8-150-01'

T8-150-01'

T8-150-01'
2T12-26 26 26
All soils on cut embarkment
26

150
to be stabilised. The slope not to

3,200
3,200

3,200

3,200
300

'
01
300

300

150
LINKS: T8-150-01'
26 26
4T16-01 4T16-03 5T16-05 5T16-07
exceed the natural angle of
repose.
200

SECTION 26-26
2T12-26 26
STRUCTURAL
B BM22: 300X200MM D

Ground Ground Ground Ground


All vegetable and black cotton
2,220 +0.00 Floor +0.00 Floor +0.00 Floor +0.00 Floor
soil
2T12-27 to be removed from below
27

300
300

300
300

300
300

300

300
G.B: 200X200MM G.B: 200X200MM G.B: 200X200MM G.B: 200X200MM
all buildings andpaved surfaces
300

300

For all R.C work,


27 27
LINKS: T8-150-01'
150

Refer to the Structural Engineers


300

'
01
150

2T12-27 27 27 27 COLUMN C01: COLUMN C02: COLUMN C03: COLUMN C04: details
200 200x200 MM 200x200 MM 300x200 MM 300x200 MM
SECTION 27-27 Depth of foundations to be
2 BM23: 300X200MM 5
determined
200 200 200 200
300 300
300 300
on site to Structural Engineers
approval.
01 01 02 02 07 07 08 08
01' 01' 03 03 04 04 01' 01'

200

200
200

200
01' 01' 05 05 05 06 06 06

200

200
01' 01' 07 07 08 08

200

200
01 01 02 02 03 04
03 04
1,900 05 05 05 06 06 06

COLUMN C01:
SECTION 01-01
COLUMN C01:
SECTION 02-02 COLUMN C02: COLUMN C02:
COLUMN C03:
COLUMN C04:
SECTION 07-07
COLUMN C04:
SECTION 08-08 All walls less than 200mm thick
3T12-28
SECTION 03-03 SECTION 04-04 COLUMN C03:
SECTION 05-05 SECTION 06-06

28 28 28 28 to be reinforced with hoop irons


at every alternating course.
150
300

300

300

LINKS: T8-150-01'
'
01

All adjacent R.C works and


150

28 28

2T12-28 28 200 masonary wall to be tied with


SECTION 28-28
strap iron at every course.
2 BM24: 300X200MM 5 MECHANICALS

2,500 All plumbing and drainage works


2T12-29 Dowels Dowels to comply with RBS specifications
29
29 29

1,000
1,000

1,000
1,000
150
300

300

LINKS: T8-150-01'
300

'
01
150

29 29 REVISIONS
2T12-29 29
NO DESCRIPTIONS DATE
200

SECTION 29-29

150

150
BM25: 300X200MM 5 150MM THK 150MM THK

300

300
G.SLAB G.SLAB

4T12 4T12

1,700

1,700
2,000

2,000
T8-100 T8-100

01 01 02 02 PROJECT DETAILS

CONSULTANT:

250

250
LOCATION:
50MM Thk blinding 50MM Thk blinding

50

50
concrete concrete
1,000
1,400
DRAWN BY:
CHK'D BY:
SCALE: AS SHOWN

5T12-01-150B2
DATE: APRIL - 2020

7T12-01-150B2
DRAWING TITLE

1,400
1,000
BEAM, COLUMNS AND FOOTING
DETAILS
5T12-01-150B1
7T12-01-150B1
1,000 PAPER SIZE: A0
1,400
COLUMN BASE CB1 DRAWING CODE / SHEET NUMBER
COLUMN BASE CB2

GSPublisherVersion 0.87.100.100

You might also like