Reasoned Documents of comments received from the firms on Final draft-1 specification tripping of the RBC at 135±2 V DCwith

tripping of the RBC at 135±2 V DCwith 2 second delay


to avoid false tripping.
Item:- 4.5kW UNDERSLUNG TYPE CONSTANT VOLTAGE REGULATED BATTERY CHARGER 4.5.3 AC over / under voltage protection: RBC M/s Star Electric:- Accepted.
shall deliver 100% load up to 350 V and What would be the output voltage for input AC from Clause modified
FOR LHB COACHES , Specification No. RDSO/PE/SPEC/AC/0183 (Rev’1’)-2018
35% load from 350V to 300V or in the event 300V to 350V. incorporating-RBC shall
Cl. N. Specified in draft specification Comments received RDSO Comments of single phasing. Input AC under and over M/s Electrowaves:- deliver 100% load up to 350
4.1(i) Nominal input voltage-415 V AC, 3-phase, M/s Signotron:- Not accepted. voltage protection shall be at 300±2 V and RBC shall deliver 100% load up to 350 V and 35% V and 35% load from input of
3/4-wire system Please clarify whether the charger shall work with both Since single phase input is 480±2 V. load from 350V to 300V or in the event of single 350V to 300V or in the event
3 wireand 4 wire system or whether it shall work with required for emergency mode, phasing. Input AC under and over voltage protection of single phasing. Input AC
either 3 wire system or 4 wire system. 4-wire input voltage system is shall be at 300±2 V and 480±2 Vand shall be locked under and over voltage
ICF Chennai:- specified. in trip condition after three consecutive restart protection shall be set at
Specification calls for input nominal voltage 3/4wire attempts if low voltage condition is still present. 300±5V and 480±5Vand shall
system; whereas the input voltage from DA set/ HOG M/s Rishab:- be locked in trip condition
is always provided with 3 phase 3 wire only from The window on 300±2 V should be increased. Turning after three consecutive restart
60kVA transformer. Hence this clause may be referred OFF at 298V will suddenly cause input voltage rise attempts at an interval of
to 3 phase 3 wire only. which in turn will cause the battery charger to turn ON 5second. RBC shall again try
4.1(ii) Type & Ah rating of batteries- Lead acid, RCF:- Not accepted. and this may continue to happen till the input voltage to start after a gap of 10
70/120 Ah Type & Ah rating of batteries-VRLA, 70/120 Ah Clause modified reaches safe level of operation minutes by which time input
incorporating- Type & Ah M/s PIGaziabad:- voltage is likely to get
rating of batteries- Lead acid, RBC shall deliver 100% load up to 350 V and 35% normalized. After that RBC
70/120 Ah (both flooded load from 350V to 300V or in the event of single shall be locked in trip
&VRLA). phasing. Input AC under and over voltage protection condition. Above clause
4.4 RIPPLE CONTENTS: Output voltage and M/s Powernetics Not accepted. shall be at 300±2 V and 480±2 Vand shall be locked shifted in clause No.4.5.5
current ripple factors (r.m.s.) shall be less This would be difficult at light load. So, make it Output voltage and current in trip condition after three consecutive restart
than 2% and 3% of the set voltage/current applicable above50% load, not 10% load. ripple factors (r.m.s.) at light attempts if low voltage condition is still present.
respectively, when measured across a load(10%)already achieved by 4.5.4 RBC shall have self-reset feature. M/s Electrowaves:- Accepted.
resistive load. approved sources as per RBC shall have self-reset feature, system shall be Clause modified
existing specification, hence locked in trip condition after three consecutive restart incorporating-
no change in contemplated attempt.To avoid stress on RBC and its power RBC shall have self-reset
4.5.1 Over voltage: Output over voltage M/s Star Electric:- Accepted. electronics components, RBC should attempt only 3 feature. The system shall be
protection shall be provided by tripping of If the set value is 135V, then what would be OVP. Clause modified or 4 time to restart. If fault is still present it should locked in trip condition after
the RBC at 135±2 V DC. M/s ICElectrical:- incorporating-Output over lock in shut down position. three consecutive restart
Output over voltage protection suggests to be keep at voltage protection shall be Let there is a short present in the output side of the attempts at an interval of 5
least 136±2V, beyond the maximum operating voltage provided by tripping of the Batt. Charger and RBC is always trying to restart, seconds. Above clause shifted
limit 135VDC. RBC at 136±2 V DC with 2 every time we are applying stress to power devices, in clause No.4.5.6
M/s PIGhaziabad:- second delay to avoid spurious result in degrading of the performance of power
Output over voltage protection shall be provided by trippings.

device. 5.2 Terminal markings input AC (R, Y, B) and M/s Star Electric:- Accepted.
M/s PIGaziabad:- output DC+, DC- & BC+ shall be engraved Required terminal would be 9 connections-3 nos. for 3- Clause modified
RBC shall have self-reset feature, system shall be on terminal board/block. The termination of phase AC input and 6 nos. for DC output ( 2 for each incorporating- Terminal
locked in trip condition/state after three consecutive re- internal connections shall facilitate palm-to- DC+/DC-/BC+). blocks shall be ‘Cage clamp
startattempt with in specified time period i.e. 5-10 palm connections. Not more than one wire ICF Chennai:- type’ with suitable numbers of
minutes which shall be specified during the prototype shall be terminated on one terminal. Terminal Terminal block type is mentioned as clamp type, which terminal blocks of
test. blocks shall be ‘clamp type’. One extra may be modified as Cage clamp type. Wago/Phoenix make. 20 %
5.1 RBC shall be as compact and as lighter in ICF Chennai:- Based on the ICF’s referred terminal block shall be provided with each terminal blocks shall be spare.
weight as possible. Overall size of the unit ICF has prepared Drg. No. ICF/SK3-7-1-100 which is drawing, the RDSO OGA output terminal for paralleling of coach
including terminal box shall not be more than suitable for all types of LHB coaches(AC and Non drawing has been revised and cables.
900 mm (L) X 755mm (D) X500mm (H). AC). This drg. May be studied and incorporated in incorporated with terminal
The mounting dimension of underslung RDSO specification. box along with 29 mm holes
cubicle shall be 850 mm (L) X 300 mm (D) in the bottom for entry of
(Refer RDSO drawing No. cables and door hinge 5.3 Cubicle shall be made of minimum 2.0 mm M/s Hitachi:- Partially accepted.
RDSO/PE/SK/AC/200-2018 (Rev’0’) as arrangement as per ICF OGA thick, SS304 grade stainless steel sheet Because of SS weld, steel will change its basic property
Relevant clause modified as
Annexure-2). However, RDSO reserve the RCF:- drawing. conforming to IS: 10632 Pt-3 and will be at welding place & hence after some time it will start
Cubicle shall be made of
right to change the dimensions at the time of The mounting dimension of underslung cubicle shall be Not accepted.- without exterior/interior painting rusting from welding area. Please suggest that either
minimum 2.0 mm thick,
design approval or prototype approval. Total 850 mm X 300 mm X 300 mm instead of 850 mm X The lesser dimension (depth- we pain entire unit or we paint only welding area. SS304 grade stainless steel
weight shall not exceed 80 kg. 300 mm. RDSO/PE/SK/AC/200-2018 (Rev’0’) may be 600mm) as proposed by ICF sheet conforming to IS: 10632
modified accordingly. The mounting holes shall be size is being accepted. Depth of Pt-3 without Exterior/interior
of 13mmx24 mm, elliptical shape, 6 holes. 600mm with mounting painting. However
300mm apart (depth side) as Exterior/interior painting with
per requirement of SLR fire retardant black paint can
M/s Electrowaves:- coaches & for provision of be done for better heat
Total weight shall not exceed 95 kg. Emergency mode. dissipation during regular
M/s Hind:- Accepted.100kg. RCF:- production.
Weight may increase to 85 kg due to additional Due to Emergency mode Grade of stainless steel may be specified as SS-304/S2 Accepted.
components. operation feature Clause or SS-304/L being commercially available grades. Clause modified
M/s PIGaziabad:- modified incorporating Total incorporating-SS-304/S2 or
Total weight shall not exceed 95 kg for better product weight shall not exceed 100 SS-304/L
reliability. kg. 5.4 All the hardware including those used for M/s Powernetics:- Not accepted.
electrical terminals shall be stainless steel Allow pan head star type screws for assembly like Hexagonal head screws is
hexagonal head screws and nuts conforming devices and capacitors. more suitable.
to SS-304. Plain and spring washers shall be
used as per the requirements of fastening
arrangement. Screws used for mounting of
the components shall preferably be on tapped
holes, wherever necessary. up to 1050C shall be utilized. Capacitors should not
5.9 All electronic components used shall be of M/s ICElectrical:- Accepted. require any replacements during the service life of the
industrial grade. Only long life dry type We suggest that the design of power module of RBC Clause modified RBC unit.
Capacitors having self-healing feature and shall not use Electrolytic Capacitor for long life and incorporating- Only long life 5.11 Entire electronics of the equipment shall be RCF:- Not accepted.
suitable for operation up to 1050C shall be maintenance free operation. Only use of metalized poly dry type Capacitors having reliable and shall comply with RDSO Compliance of electronics to RDSO Specification No. Entire electronics should
utilized. Capacitors should not require any film capacitors shall be permitted in the power stage of self-healing feature and Specification No. ELRS/SPEC/SI/0015-Oct- ELRS/SPEC/SI/0015-Oct-2001or industrial grade of comply RDSO Specification.
replacements during the service life of the input and output. suitable for operation up to 2001 or latest for reliability requirement. reputed makes may be added. Industrial Grade is already
RBC unit. M/s Electrowaves:- 1050C shall be utilized in the mentioned in clause No.5.9 of
Only long life dry type Capacitors/ Electrolytic main power circuit DC bus. specification
Capacitors suitable for operation up to 105 ◦ C shall be Electrolytic Capacitors having 5.14 For better thermal management, Choke M/s Electrowaves:- Partially accepted.
utilized.In the first stage input AC is rectified through self-healing feature and (inductor) and transformer may be provided For better thermal management, Choke (inductor) and Choke (inductor) and
bridge rectifier to produce DC. Then this high voltage suitable for operation up to in a separate compartment/cubicle and can transformer may be provided in a separate transformer may be provided
DC is switched at high frequency in DC –DC converter 1050C may be utilized in have IP-65 protection up to 135mm from the compartment/cubicle and can have IP-65 protectionup in a separate
section to produce Galvanically isolated constant control power supply and top. Ingress protection level of main cubicle to 135mm from the top. Ingress protection level of compartment/cubicle (if
voltage low voltage DC at output. control circuit. Capacitors shall however be IP-68 from bottom to 135 main cubicle shall however be IP-68 from bottom to required for better thermal
To reduce ripple in rectified DC, electrolytic should however not require mm from top. Use of sealant of any kind for 135 mm from top. Use of sealant of any kind for management) but shall be
capacitors of higher values to be used for better any replacements during the achieving stipulated IP level is not achieving stipulated IP level is not permissible. provisioned within overall
performance. service life of the RBC unit. permissible. M/s Powernetics:- size as specified in RDSO
M/s Signotron:- . Sealant of high temperature withstand ability to be Drawing
In any electronic product several capacitors are used in allowed heat sink mounting &Perspex cover. No.RDSO/PE/SK/AC/200-
which many are used in low voltage low power M/s PIGaziabad:- 2018 (Rev’0’) with IP-65
supply and control circuit with very less ripple current For better thermal management, Choke (inductor) and protection.
with service life more than 20 years . Replacing them transformer may be provided in a separate
with dry type capacitor is unnecessary and compartment/cubicle and can have IP-65 protection.
difficult.However Electrolytic capacitors in the main Use of sealant of any kind for achieving stipulated IP
power circuit DC bus with high ripple current have level is not permissible.
limited service life if not properly chosen. So, the M/s Rishab:-
requirement may be revised as “Only long life dry type This Box is totally enclosed & there is no ventilation.
capacitors having self healing feature and suitable for So, it should be only either IP67 or IP 65, i.e. one
operation up to 105 ◦ C shall be utilized in the main standard to be followed. Otherwise, it gets difficult to
power circuit DC Bus . In control power supply and test.
control circuit Electrolytic capacitors suitable for RCF:-
operation up to 105 ◦ C may be utilized “. The unit shall be designed as a single unit only to
M/s PIGhaziabad:- reduce interconnection of the wiring between
All electronic components used shall be of industrial transformer and choke and if required only separate
grade. Only long life dry type/ Electrolytic Capacitors compartments in the same cubicle may be
having self-healing feature and suitable for operation permitted.

5.15 Complete windings of transformer/choke M/s Rishab:- Not accepted. RDSO/PE/SPEC/AC0138-2009 (latest) instead of
shall be done with polyesterimide over We have noted & Understood the requirement. It is Same is using in 60kVA Cable glands.
coated with polymide-imide enameled also suggested that impregnation by 50VT of Dr. transformer. 5.21 Suitable ON/OFF switch shall be provided M/s Hind:- Accepted.
copper wire. Impregnation shall be done by ELANTAS (Dr. BECK) is better than FT 2005/500EK on input side. MCB will be provided. A 20 Amps three pole MCB
FT 2005/500EK of Dr BECK through of Dr BECK. A separate sheet is attached which M/s Star:- suitable for rolling stock
vacuum pressure impregnation method. describes advantages of 50VT of Dr. Beck (Refer What is the utility of ON/OFF switch, for service application shall be provided
Annexure A). Also, it is our observation that due to purpose? on input side in the terminal
strong & bad odor of FT 2005/500EK, becomes box.
difficult to work with and health hazard for the RCF:- ON/OFF is in terminal board
workmen. Both clause 5.21&5.25 are contradictory, however of unit included for once
M/s AAL:- provision of ON/OFF switch shall be made on the switching ON/OFF the unit.
Complete windings of transformer/choke shall be done underslung equipment as well as on board also for Therefore it should work
with polyesterimide over coated with polymide-imide remote operation. without human intervention.
enameled copper wire. Impregnation shall be done by ON-board ON/OFF switch is
FT 2005/500EK of Dr BECKor equivalent suitable not required. 20 A MCB shall
for traction through vacuum pressure impregnation be provided on input side in
method. the terminal box.
5.19 Zero halogen, low smoke, fire retardant ICF Chennai:- Accepted. 5.22 Two potential free contacts shall be provided M/s Hitachi:- Already there in the
polyamide-6 cable glands (1 for incoming Cable gland with IP68 is called for provision in the Relevant clause modified in the terminal box for using them for HHPE will use two potential free contacts with specification.
and 3 for outgoing cables) with IP-68 terminal box. The cable are normally routed through accordingly. Terminal box indication of RBC ON/OFF in the coach in capacity of 230VAC & 1Amps.
protection shall be provided on the terminal flexible polyamide conduits which are not compatible shall have four 29 mm plain case of AC coaches. RCF:-
box of the unit for the incoming & out going for interfacing with cable glands. Hence, it is suggested holes through which PMA Two sets of potential free contacts shall be provided for
cables that the terminal box shall have plain holes through end fittings with flexible 1) RBC ON/OFF indication- on board
which PMA end fittings with flexible PMA conduits PMA conduits will be 2) RBC unit fault indication- on board
will be provided which will be IP68 protection. The provided in the bottom which
number of holes requirement is covered in ICF Drg. will be IP68 protection. RBC 5.23 On output side HRC fuse of 40 A shall be ICF Chennai:- Not accepted.
No. ICF/SK3-7-1-100 and same may be adopted. unit shall however be supplied provided in +ve load circuit in terminal box 40Amps fuse shall be provided in the main unit instead Replacement of fuse will be
M/s Hitachi :- with these holes in blocked attached to main unit/box. of terminal box, as the present terminal box very difficult from inside the
Please mention the size of cable gland and cable to be condition. arrangement is shown in ICF drg. Is not covering the IP65 protected underslung
used. HHPE suggests if terminal box is in 135mm from . fuse box else the terminal box has to be redesigned to cubicle en-route. Hence
the top then IP68 cable gland is not required. HHPE bigger size. provision of fuse hasbeen
suggests to use threaded M6 stud for connection done in terminal box.
instead of terminal.
RCF:-
The input output cables shall be routed through end
fittings as per RDSO Specification No.
5.25 RBC shall start functioning without any M/s IC Electricals:- Not accepted. on both lines of that circuit. This type of earth leakage detection is generally
human intervention with the availability of A three phase 25Amps MCB will be provided inside ON/OFF of MCB is very continuous insulation resistance monitoring and used
input power supply without any need for the underslung charger box at input R,Y,B side to difficult from IP65 protected for critical applications like underground cable fault
switching ‘ON’ and ‘OFF’. ON/OFF the charger and normally kept in ON underslung cubicle during detection . This solution also will increase the cost .
condition always. tripping of MCB en-route. So for the charger application trip in case of leakage on
M/s Star:- Hence MCB has been any one of the line may be implemented.
What is the utility of ON/OFF switch, for service provisioned in terminal box. M/s Electrowaves:-
purpose? Earth leakage detection for both positive and negative
lines of both battery and load circuits shall be provided.
5.29 Two tinned copper earthing pad with tapped RCF:- Not accepted. RBC shall be trip in any above condition to avoid
hole and M10 brass bolt with flat surface & M10 brass bolt may be replaced with stainless steel Brass bolt is better. human hazardous.
spring and flat washers shall be provided on screw. M/s IC Electricals:-
left and right sides of the unit for earthing If the earth fault as specified is provided the it violate
with coach body. the clause of insulation resistance, since for each
5.33 Equipment cubicle / body shall not be M/s Electrowaves:- Not accepted. (DC+,DC-) output line if 30mA is the bench mark of
connected to any circuit / PCB and shall not To reduce the high frequency noise/EMI/EMC of Existing vendors have already leakage current than their has to be a resistive path
be used for any type of earthling or system, a noise immunity circuit shall be incorporate in developed such circuit with between DC & Earth points which if mounted will fail
shielding. the system, which needs to be earthed.To bypass high EMI/EMC compliant. the IR of the entire equipment.
frequency noise components of control circuit, bypass M/s Star:-
capacitors need to be connected with earth, So that Topology of isolating battery circuit frm other load
noise components can be bypassed to earth, which circuit may be elaborated.
reduces EMI/EMC of system. M/s Hind:-
M/s PI Ghaziabad:- Single earth fault will be provided.
To reduce the high frequency noise/EMI/EMC of M/s Powernetics:-
system, a noise immunity circuit shall be incorporate in Both lines are same after connecting load/battery,
the system, which needs to be earthed. standard earth leakage for both positive and negative.
5.34 Theterminal box shall be located on upper ICF Chennai:- Not accepted.Entry holes Leakage from either of the line should trigger
side of the left face of the unit and cable The cable entry hole shall be provided on the side ways shall be on bottom of terminal action(Trip/alarm). The detection shall be comparing
entry holes shall be provided on its bottom. as shown in ICF Drg.No. ICF/SK3-7-1-100. box. outgoing and incoming current, both should be equal in
case of healthy condition.
5.36 Earth leakage detection for both positive and M/s PI Ghaziabad:- Not accepted. M/s AAL:-
negative lines of both battery and load Earth leakage detection for both positive and negative Earth leakage detection for “RBC shall function normally in case of leakage on
circuits shall be provided. RBC shall lines of both battery and load circuits shall be provided. both positive and negative any one of the line (positive or negative) but shall trip
function normally in case of leakage on any RBC shall be trip in any above condition to avoid lines of both battery and other respective circuit in the event of leakage on both lines
one of the line (positive or negative) but shall human hazardous. load circuits are required. of that circuit”.These lines should be removed from
trip respective circuit in the event of leakage M/s Signotron:- specification because positive and negative terminals
shall have common earth leakage reference as it is

driving load consisting of coils also. activated, wherein separate


5.38 New clause added ICF Chennai:- Accepted. circuit operating at 230V
Door stopper arrangement for holding the door of RBC New clause modified input(any of the phases &
during any maintenance shall be included as shown in incorporated Front door shall neutral) for feeding 2.5kW
ICF Drg.No. ICF/SK3-7-1-100. be openable (hinge on top) coach load at 110VDC
and shall have suitable (nominal) shall come into
stopper arrangement for operation (just like EBC).
holding the door for easy Emergency mode will be
maintenance indicated on indication panel
SPECIAL REQUIREMENT(New clause)- 6.1-At odd hour (00.00hr) through an LED. The
Added every day, RBC shall be emergency mode circuit shall
automatically switched ‘off’ generally conform to RCF
(zero output) and the DC load specification No. EDTS 163
will be transferred to battery Rev ’C’ for Emergency
for one hour (max.). During battery charger.
this period battery voltage 6.1 Protection against ingress of dust and water M/s PI Ghaziabad:- Accepted.
shall be monitored. RBC shall be IP-68 from bottom to 135 mm from Protection against ingress of dust and water shall be Clause modified
should start functioning top and IP-65 up to 135 mm from top. IP65. incorporating-Protection
normal after one hour or M/s Rishab:- against ingress of dust and
before, if battery voltage falls This box is totally enclosed & there is no ventilation. water shall be IP65 complete
below cut off voltage (settable So, it should be only either IP67 or IP65, i.e. one unit.
through Key pad). If battery standard to be followed. Otherwise, it gets difficult to
voltage drops below cut off test.
voltage i.e. 100V (settable M/s Electrowaves:-
through Key pad) in less than Protection against ingress of dust and water shall be
one hour, ‘battery not healthy’ IP65.
indication shall glow on 6.1 Input supply over voltage set at 480±2 V. M/s ICElectrical:- Accepted.
indication panel. We suggest to kept on 480±5V (less than2% of set Clause modified accordingly.
6.2 RBC will have the point 480V) considering three phase input source
following modes:- stiffness, wire length and voltage drop at full load.
6.1 Input supply under voltage set at 300±2 V. M/s PI Ghaziabad:- Accepted.
(i)Normal mode, wherein full Input supply under voltage set at 300±4V @35%load. Clause modified
output for both circuits will M/s ICElectrical:- incorporating- Input supply
be available. We suggest to kept on 300±5V (less than2% of set under voltage set at 300±5V
(ii)In the event of failure of point 300V) considering three phase input source @35%load.
normal mode, Emergency stiffness, wire length and voltage drop at full load
mode will be automatically M/s Electrowaves:-
Input supply under voltage set at 300±4V @35%load  Input AC on (3-Phase) – R, Y, B
6.1 Output overvoltage trip at 135 ±2 Volts. M/s ICElectrical:- Accepted.  Battery charging “ON”
Output over voltage protection suggests to be kept at Clause modified.  Single phasing indication.
least 136±2V, beyond the maximum operating voltage  Earth leakage trip indication
limit 135VDC. 6.3 The RBC shall have following features fault M/s AAL:- Partially accepted.
6.1 Reverse polarity protection for both the M/s PI Ghaziabad:- Partially accepted. diagnostics features accessible through key Positive earth leakage (> 30 mA) independently for Clause modified
output circuits. Reverse polarity protection in battery circuit. Clause modified pad/down loading. both output circuits, Negative earth leakage (> 30 mA) incorporating-Reverse
M/s Powernetics:- incorporating-reverse polarity independently for both output circuits. “linesshould be polarity for battery circuit.
Only battery reverses polarity protection possible. protection in battery circuit i. Display of following faults with brief removed” because positive and negative terminals shall
There is no reverse polarity of the load, so not required. description. have common earth leakage reference as it is driving
Detection not possible as load is not source  Input under voltage <300Volts load consisting of coils also.
M/s Electrowaves:-  Input over voltage >480Volts M/s Electrowaves:- Accepted.
Reverse polarity protection in battery circuit.  Reverse polarity for both output  Reverse polarity for both output circuits Downloading of faults
6.2 Following indications through 10 mm LEDs RCF:- Not accepted. circuits  Earth leakage for both lines of two output through only USB port.
of any colour other than RED visible Unit fault indication may be added to know the health Charger ON condition already circuits.
 Input single phasing
through transparent perspex window on front of the system. is indicated. Also one RBC shall be provided with self-checking watch dog
 Output short circuit
door of the unit (up to 135 mm from the top) M/s AAL:- potential free contact for feature and facility to down load data through USB
 Over Temperature
shall be provided. Positive earth leakage (> 30 mA) independently for faulty condition is port on commercially available USB pen drive only
 Output overvoltage >135V
 Input AC on (3-Phase) – R, Y, B both output circuits, Negative earth leakage (> 30 mA) provisioned in clause No.5.22. which can directly download the data in text/MS
independently for both output circuits. “lines should be  Over current
 Battery charging “ON” Office.
removed” because positive and negative terminals shall  Earth leakage for both lines of
 Single phasing indication. M/s Star:-
have common earth leakage reference as it is driving two output circuits.
 Positive earth leakage (> 30 mA) Suggested option is the display of last faults in key pad
load consisting of coils also. Diagnostic system shall be capable of
independently for both output circuits and for logged faults only USB downloading.
M/s Hind:- Accepted. recording at least last 300 latest faults with
 Negative earth leakage (> 30 mA) real time clock with override feature i.e. first M/s PI Ghaziabad:-
independently for both output circuits Perspex sheet not suitable from IP68. Clause modified  Reverse polarity at battery/DC terminal
M/s PI Ghaziabad:- incorporating- Following come first out FIFO).There shall not be
provision for deletion or clearing of the  Earth leakage in DC side only
 Input AC on (3-Phase) – R, Y, B indications through 5 mm RBC shall be provided with self-checking watch dog
 Battery charging “ON” LEDs of any colour other faults data.
RBC shall be provided with self-checking feature and facility to down load data through USB
 Single phasing indication. than RED visible through UV port on commercially available USB pen drive only
resistant and fire retardant watch dog feature and facility to down load
 Earth leakage trip indication which can directly download the data in text/MS
ultrasonic transparent poly data through USB port on commercially
M/s Powernetics:- Office as per formats of spec. for easy analysis.
carbonate sheet on front door available USB pen drive and RS-
Should be avoided the indication as it is very complex There shall not be any external s/w required to
of the unit (up to 135 mm 232/Ethernet port.
to provide transparent Perspex window, being it IP68 down load data and analysis the data.
and underslung. Difficult to get Perspex with required from the top) shall be M/s Hitachi:-
hardness, like steel. Otherwise will break in no time. provided. Battery not healthy HHPE recommended to use USB which is used as pen
M/s Electrowaves:- and Emergency mode ON drive or PC interface for downloading the fault.
indications added.

7.1 The wires/cables below 10 Sq.mm shall be M/s Signotron:- Not Accepted. the semiconductor devices shall have a safety shall be compared with the safety margin declared by
copper with PTFE insulation of reputed make The wires/cables below 10 Sq.mm shall be copper with margin of minimum 100C. the manufacturer. Under loading conditions as
and higher than that e-beam cables as per PTFE insulationor e-beam cable of reputed make and Temperature of the transformer/inductor specifiedabove, the corrected temperature of the
RDSO Specification No. higher than that e-beam cables as per RDSO shall not exceed 135ºC when corrected to 55 0 semiconductor devices shall have a safety margin of
ELRS/SPEC/ELC/0019 (Rev ‘3’) of RDSO Specification No. ELRS/SPEC/ELC/0019 (Rev ‘3’) of C and the corrected temperature shall have a minimum 10°C.
approved make. RDSO approved make. safety margin of minimum 100C. Temperature of the transformer /inductor shall not
The temperature rise in the exceed 155 °C when corrected to 55°C and the
9.5(ii) 110V dc circuits- 1500V (r.m.s), sine wave, M/s ABB:- Not Accepted.
inductors/transformer windings shall also be corrected temperature shall have a safety margin of
50 Hz for 1 minute As per IEC 61287-1, 110V dc circuits- 1200V (r.m.s),
measured by resistance method. minimum 10°C.
sine wave, 50 Hz for 1 minute
The temperature rise in the inductors/transformer
9.7 Weight: Overall weight of the unit shall not M/s Electrowaves:- Accepted.
windings shall also be measured by resistance method
exceed 80 kg. Overall weight of the unit shall not exceed 95 kg. Due to Emergency mode
preferably.
M/s Hind:- operation feature Clause
M/s Powernetics:-
Weight may increase to 85 kg due to additional modified incorporating Total
As we are using class H transformer/inducter, so the
components. weight shall not exceed 100
temperature on it to be 155°C after correction.
M/s PI Ghaziabad:- kg.
M/s PI Ghaziabad:-
Overall weight of the unit shall not exceed 95 kg. 25% outer surface area of heat sinks shall be
9.15 25% outer surface area of heat sinks shall be M/s AAL:- Not Accepted. covered with insulating material during this test.
covered with insulating material during this H-class transformer is recommended to be used in 25% outer surface area of RBC shall be loaded to full load current corresponding
test.RBC shall be loaded to full load current RBC which is designed for 180 ºC. heat sinks shall be covered to 35 A DC rating with minimum input voltage of
corresponding to 35 A DC rating with Therefore,maximum temperature can be increased to with insulating material 350V AC± 5volts. The temperature rise shall be
minimum input voltage of 350V AC± 5volts. 155 ºC (with a good margin with respect to 180 ºC). during this test for better recorded with the help of temperature recorder having
The temperature rise shall be recorded with M/s Electrowaves:- formance.. at least 12-14 sensors mounted at the specified
the help of temperature recorder having at 25% outer surface area of heat sinks shall be reference points on the body of semiconductors,
least 12-14 sensors mounted at the specified covered with insulating material during this test. transformer/inductor, filter capacitors and other
reference points on the body of RBC shall be loaded to full load current corresponding components till stabilization of the temperature at all
semiconductors, transformer/inductor, filter to 35 A DC rating with minimum input voltage of the locations. The maximum-recorded
capacitors and other components till 350V AC± 5volts. The temperature rise shall be temperatureunder worst loading conditions shall be
stabilization of the temperature at all the recorded with the help of temperature recorder having corrected for 55ºC and compared with maximum
locations. The maximum-recorded at least 12-14 sensors mounted at the specified permissible temperature. The thermal margin available
temperature under worst loading conditions reference points on the body of semiconductors, shall be compared with the safety margin declared by
shall be corrected for 55ºC and compared transformer/inductor, filter capacitors and other the manufacturer. Under loading conditions as
with maximum permissible temperature. The components till stabilization of the temperature at all specifiedabove, the corrected temperature of the
thermal margin available shall be compared the locations. The maximum-recorded semiconductor devices shall have a safety margin of
with the safety margin declared by the temperatureunder worst loading conditions shall be minimum 10°C.
manufacturer. Under loading conditions as corrected for 55ºC and compared with maximum Temperature of the transformer /inductor shall not
specified above, the corrected temperature of permissible temperature. The thermal margin available exceed 150 °C when corrected to 55°C and the
corrected temperature shall have a safety margin of Input under voltage test should be carried out at 35% of
minimum 10°C. load, as the under-voltage limit is 300VAC.
The temperature rise in the inductors/transformer M/s Hitachi:-
windings shall also be measured by resistance method RBC unit will sustain with 100% load upto 350V &
preferably. under voltage test conducted with 35% load from 350V
9.16 The water proof-ness test shall be done on M/s Electrowaves:- Accepted. to 300V or event of single phasing.
the unit by dipping the equipment in water Protection against ingress of dust and water shall be Clause modified M/s PI Ghaziabad:-
for one hour under de-energized condition IP65. incorporating-The water The input voltage shall be reduced below 300V and the
leaving 135mm from the top. Water shall not M/s Rishab:- proof-ness test shall be done RBC shall switch “OFF” prior to 298 volt and
enter into the unit. Transformer/inductor This box is totally enclosed & there is no ventilation. on the RBC underslung unit automatically switch “ON” after the input voltage
cubicle (if designed as a separate cubicle / So, it should be only either IP67 or IP65, i.e. one by dipping the equipment in exceeds 302 volts. The input voltage shall be increased
compartment) with IP-65 protection, shall be standard to be followed. Otherwise, it gets difficult to water for one hour under de- beyond 480 V AC and the RBC shall switch “OFF”
tested accordingly. test. energized condition leaving prior to 482 Volts. The voltage shall be further raised to
M/s PI Ghaziabad:- 135mm from the top. Water 510V AC and maintained for two minutes. There shall
Protection against ingress of dust and water shall be shall not enter into the unit. be no damage to any of the components of the RBC.
IP65. The RBC shall automatically switch “ON’ when the
9.19 The input voltage shall be reduced below M/s ICElectrical:- Accepted. voltage is reduced below 480 V AC but before 478 V.
300V and the RBC shall switch “OFF” prior We suggest to kept input under voltage & over voltage Last para replaced as the Above input under voltage test shall be carried out
to 298 volt and automatically switch “ON” limit on 300±5V & 480±5V respectively (less than2% following:- at reduced load i.e.12.25 Amps. And shall be locked
after the input voltage exceeds 302 volts. The of set point) considering three phase input source Input under voltage test also in trip condition after three consecutive restart
input voltage shall be increased beyond 480 stiffness, wire length and voltage drop at full load. shall be carried out at reduced attempt if low voltage condition is still present.
V AC and the RBC shall switch “OFF” prior M/s Electrowaves:- load-35% i.e.12.25 Amps or 9.22 EMI/EMC test shall be conducted as per M/s PI Ghaziabad:- Not Accepted.
to 482 Volts. The voltage shall be further The input voltage shall be reduced below 300V and the event of single phasing. And relevant clauses as mentioned in the IEC: EMI/EMC test shall be conducted as per relevant EMI/EMC test shall be
raised to 510V AC and maintained for two RBC shall switch “OFF” prior to 298 volt and shall be locked in trip 61000 clauses as mentioned in the IEC: 61000 with Level-1 & conducted as per relevant
minutes. There shall be no damage to any of automatically switch “ON” after the input voltage condition after three Performance criteria-C clauses as mentioned in the
the components of the RBC. The RBC shall exceeds 302 volts. The input voltage shall be increased consecutive restart attempt at M/s Electrowaves:- IEC: 61000 with Severity
automatically switch “ON’ when the voltage beyond 480 V AC and the RBC shall switch “OFF” on interval of 5 second if low EMI/EMC test shall be conducted as per relevant Level-3 &
is reduced below 480 V AC but before 478 prior to 482 Volts. The voltage shall be further raised to voltage condition is still clauses as mentioned in the IEC: 61000 with Level-1 & Performance/acceptancecriteri
V. 510V AC and maintained for two minutes. There shall present Performance criteria-C a-A. Clause modified
Above input under voltage/ over voltage be no damage to any of the components of the RBC. accordingly.
test shall be carried out on full load i.e.35 The RBC shall automatically switch “ON’ when the 9.25 Reverse polarity protection shall be provided M/s ABB:- Partially accepted.
Amps. voltage is reduced below 480 V AC but before 478 V. at battery & load terminal. The RBC shall With reverse connection of battery, battery charger Clause modified
Input under voltage test also shall be carried out at sense the reverse polarity and shall trip the cannot protect the battery current to flow because of incorporating-Reverse
reduced load i.e.12.25 Amps. And shall be locked in respective circuit. battery get short circuit through output rectifier diode polarity protection shall be
trip condition after three consecutive restart and battery charger cannot play any role to restrict it, provided for battery circuit.
attempt if low voltage condition is still present. since there is no control device in the path. This will The RBC shall sense the
M/s Powernetics:- reverse polarity and shall trip

happen, even battery charger is in off condition or the respective circuit. positive and negative outputs so that current through
control off condition. Hence recommended deleting sensing network is greater than 30 mA to detect earth
this clause. fault and as earth fault indication is required for
M/s Star:- individual positive and negative.
Reverse polarity protection is normally used for battery 1.Please clarify the test method for individual earth
circuit and is recommended to delete the protection fault test method for positive and negative.Line
requirement for DC load circuit. separately and earth fault indicator functionsseparately
M/s AAL:- for positive and negative.
Reverse polarity protection shall be provided at battery 2.What is the test method for “insulation resistance
& load terminal. However complete system will trip method” at output port positive and negative line
after sensing of reverse polarity. because there will be a bias circuit between earth and
M/s Powernetics:- output positive & negative line separately to detect
Only applicable for the battery. Detection impossible earth fault on these line and indicating separately very
for a passive load. less
9.26 Over voltage protection shall be provided to M/s ICElectrical:- Accepted. 3.As earth leakage threshold current is very less so
avoid the equipment supplying high voltage Output over voltage trip suggest to kept at least Clause modified. there shall be probability of false tripping of during
beyond the 135 Volts. Tripping of the RBC 136±2V, beyond the maximum operating voltage limit disturbance of these floating positive and negative
should be set at 135±2 V DC. 135VDC. output.
9.27 Detection of earth leakage of more than 30 M/s PI Ghaziabad:- Not Accepted. M/s Electrowaves:-
mA in each line of both output circuits shall Detection of earth leakage of more than 30 mA in each Earth leakage detection for Detection of earth leakage of more than 30 mA in each
be tested by creating high resistance earths. line of both output circuits shall be tested by creating both positive & negative lines line of both output circuits shall be tested by creating
Tripping of the respective circuit by bridging high resistance earth,spath. of battery & other load circuit high resistance earthpath.
both positive and negative lines (through M/s AAL:- are required. M/s Powernetics:-
resistance to produce leakage current of more RBC shall function normally in case of leakage on any Single earth fault, leakage from either positive or
than 30 mA) of output circuits will also be one of the line (positive or negative) but shall trip negative bus.
verified. Leakage currents at which respective circuit in the event of leakage on both lines New test Clause added Emergency mode operation
indication comes or tripping takes place shall of that circuit”.These lines should be removed from test-A fault is created in the
be noted for future reference. specification because positive and negative terminals main circuit and it will be
shall have common earth leakage reference as it is checked if Emergency mode
driving load consisting of coils also. as per clause No. 6.2 comes
M/s Hind:- into operation and Emergency
Single earth fault will be provided. mode indication glows.
M/s ICElectrical:-
As per requirement of earth leakage detection is current
based scheme and it is required for both individual Battery health status test
positive and negative output wires. During test method The RBC shall be switched
as stated to connect bridging resistance through off (zero output) for an hour
and 35 A loads will be assure excellent quality with very close monitoring
transferred on Battery through our lean manufacturing & control systems
attached. RBC will monitor which has been implemented from last 4 years, at M/s
battery voltage and the battery Rishab Industries through a program jointly conducted
health status feature as per under Ministry of MSME, National Productivity
clause No. 6.1 will be Council and MCCIA Pune. These Systems are being
verified. followed for our existing products. Hence, it is our
11.1 Firms having core competency in the field of M/s Rishab:_ Accepted. humble submission that our experience with
designing and manufacturing of similar We have experience in designing & manufacturing Clause modified microprocessor based technology should be considered
IGBT/SiC based electronic equipment shall microprocessor based servo voltage correctors from incorporating-. Firms having as our qualification criteria and we should be given an
only be considered for registration in RDSO. last 4 years. We have manufactured & supplied about core competency in the field opportunity. We are also in process of development of
The firm should have manufactured and 350 Nos with rating from 5 KVA to 140 KVA with of designing and emergency battery charger for LHB coaches &
supplied at least 100 units of such equipment various configurations like 3Phase to 1Phase, 3Phase to manufacturing of similar chargers for various other applications using MOSFET
of at least 2 kVA rating during last three 3Phase & 1Phase to 1Phase. Majority of these have IGBT/SiC/MOSFET/Thyrist &SCR.We request you to kindly add the experience of
years and shall produce documentary been supplied to MNCs like Emerson Network Power or based electronic equipment electronic products with MOSFET & SCR as criteria
evidence for orders executed of such India Pvt. Ltd. and Consul Power Solutions which in shall only be considered for for qualification. We would like to mention here that
equipment indicating PO No., description, turn has installed in various private sector & public registration in RDSO. The we have successfully developed & approved 9kva,
rating, type of power devices (IGBT/SiC) sector units, in India & Abroad. The product is robust firm should have 15kva and 60kva transformers to the utmost
etc. and very reliable & is performing very well in the field. manufactured and supplied at satisfaction of RDSO. We have also developed
We would like you to know that we had already least 100 units of such &approved a 15kva Tranella-15 transformer for
applied approval for 4.5 KW as per RDSO Specn No: equipment of at least 2 kVA locomotives application.
RDSO/PE/SPEC/AC/0183 (REV-0) 2015 earlier. rating during last three years It is requested to also include MOSFET & SCR in the
But this application was closed by RDSO due to some and shall produce final revised specification in the same clause.
shortfall of compliances. With respect to RDSO STR documentary evidence for 11.2 The facilities ofitem 1 & 5 shall be available M/s Electrowaves:- Accepted.
criteria, we have now completed our compliance. orders executed of such with both the manufacturer and sub-vendor. The facilities of item 1 & 2 shall be available with Relevant clause modified
While submitting this approval file at RDSO, we were equipment indicating PO No., RDSO may visit the premises of sub-vendor both the manufacturer and sub-vendor. RDSO may accordingly.
working simultaneously on the product development description, rating, type of engaged by the firm for PCB assembly. visit the premises of sub-vendor engaged by the firm
which is now 80% completed with a fresh approach power devices for PCB assembly. The firm shall arrange the
and prototype will be fully ready in next 6-8 weeks. It (IGBT/SiC/MOSFET/Thyris assessment visit of RDSO official to the
is also our observation that this restricted criteria was tor) etc. sub-vendor’s premises.
not a part of the earlier specification for 6.5KW RBC M/s Rishab:_
Specn No: RDSO/PE/SPEC/AC/0129-2009, REV-01 We have understood &all required facilities/ testing
or latest & 4.5 KW Rev 0, hence we request you to facilities, machinery and plant will be complied as per
kindly waive this point for us. schedule of technical requirements and the
We have been designing & manufacturing transformers specifications.
for the UPS industry for last 16 years. We are known It is mentioned in specification that the facilities of
for our quality, consistency & reliability. We can item 1 & 5 shall be available with both the

manufacturer and sub-vendor.


We have submission that for Point No.
5 (i.e. Automatic/light beam guided component
insertion machine for PCBs), since it is going to be outsourced
from the sub-vendor, it is not necessary
to have the same at our (i.e. manufacturer) premises.
12.0 The complete RBC shall be warranted for a M/s PI Ghaziabad:- Not accepted.
satisfactory performance for a period of 60 The complete RBC shall be warranted for a satisfactory In all power electronics items
months from the date of commissioning or performance for a period of 24 months from the date warranty of 5 years have been
72 months from the date of supply whichever of commissioning or 36 months from the date of given and same warranty
is earlier. supply whichever is earlier. Any design defect, clause also are included in
defective material, underrated component used, etc. exist item i.e. battery chargers
have to be corrected and merely replacement of for static & rolling stock
defective parts will not be considered adequate. applications and 400mm
Complete investigation report of each major defect sweep BLDC fan etc.
/failure shall be submitted to RDSO. After the
completion of warranty period AMC shall be given
to OEM for better performance.
M/s Electrowaves:-
The complete RBC shall be warranted for a satisfactory
performance for a period of 24 months from the date
of commissioning or 36 months from the date of
supply whichever is earlier. Any design defect,
defective material, underrated component used, etc.
have to be corrected and merely replacement of
defective parts will not be considered adequate.
Complete investigation report of each major defect
/failure shall be submitted to RDSO. After the
completion of warranty period AMC shall be given to
OEM for better performance.
Ann-1 Switchgear-GE/ABB/C&S M/s Hind:- Accepted.
Please add- Siemens, L&T and Schneider Relevant annexure-1 modified
M/s L&T:- accordingly as in spec of
Please add make L&T for contactor and MCB/MCCB other equipment, these makes
are appearing.