Form # PTU-009 Rev 00

Form # PTU-008 Rev-0 Sheet 01 of 02

COVER LETTER FOR MECHANICAL PACKAGE APPROVED ON CIRCULATION

PROJECT ENGINEERING DOCUMENT ISSUANCE TRANSMITTAL

PROJECT / MOC TITLE: Addedum- Installation of isolation valve at safety showers network

MP / MOC Ref # : O&U-2018-85 Date of issue : 15-Feb-21

NO OF SHEETS: 18 EA
ISSUED FOR
INFORMATION £ REVIEW&COMMENTS £ CONSTRUCTION S AS-BUILT £

REVIEW PERIOD 4 DAYS FINAL DATE FOR COMMENTS 19/Feb/21 4

JOB DESCRIPTION:

See sheet-02 of 02

JOB SCOPE AGANST MECHANICAL PACKAGE:


Equipment Machinery
Maintenance
S Maintenance
£ Civil £ E&I £ HSE £
Production £ Admin £ Inspection S Process £ PHT £
Others:

COMMENTS: See comments sheet

ATTACHMENTS:
Process Package:
- P&IDs S - Process Schematic £
- Others:

Mechanical Package:
- Layout £ - Bill of Material S
- Piping Plan £ - MOM of SubHSE(M) £
- Isometric Drawing S - Equip. Modification Drawings: £ R
- Others: - ITP S S
Structural & Civil Package: £
- Support Drawing S - Structural Modification Drawing £
- Layout £ - Civil Foundation Drawing £
- Others: Under ground system diagram
S
£

DISTRIBUTION:
UM-AMM S UM-NP S UM-EQPT S UM-INST £ UM-PE (N) S
UM-UREA S UM-CAN S UM-WS. £ UM-ELECT £ UM-PE(S) S
UM-O&U S UM-PH&S £ UM-HSE S UM-CIVIL (Plant) S UM-Insp. S
UM-NA S Exec-ADMIN £ UM-CIVIL(Township) £ UM-Project S
CC:
Mngr Engg S Mngr Prod. S Mngr Maint. S Mngr E&I S UM HSE S Mngr PE S
PREPARED BY PROJECTS PEER REVIEWED REVIEWED BY REVIEWED BY REVIEWED BY FM REVIEWED OPERATION
Khalid sippal Umair Shahid Rizwan Malik Qaisar Imran
Project Engr: Project Engr: SH UM:

REVIEWED BY QA / QC REVIEWED BY (WS) REVIEWED BY HSE REVIEWED BY REVIEWED BY APPROVED BY


Aleem Ansari Noman Irshad Nasir Altaf Zeeshan Nasim Abbas Shahani
UM: Sr. Eng: Secretary Sub HSE(M) Co-Chairman Sub HSE(M) Chairman Sub HSE(M)

Naveed
Abdul JabbaCivil Adil Shafi E&I Omar Iqbal Amm/NA Sukhera NA
Umair Shahid Rizwan Malik O&U/Urea M. Asif NP
Muzaffar hussain Asif Rajput South plantM. Hashim Ammonia
Khalid sippal N/A Qaisar Imran Urea
Munawar Zaman CAN
M. Waseem PH&S
Hamid Roman

Projects Unit/ TSD Page 1


Form # PTU-008 Rev-0 Sheet 02 of 02

COVER LETTER FOR MECHANICAL PACKAGE APPROVED ON CIRCULATION

JOB DESCRIPTION:

1- Background:-

This is in reference to subject process package regarding “Addedum- Installation of isolation valve at safety showers
network”
Currently multiple leakages have been observed on portable water for saftey shower networks since commisioning of
project. Welding joints of above ground/under ground portion were completed with old welding machine/technique
without following manufacturer's procedure, thus causing compromised work manships due to leakages and frequent
need to carry out job on header. complete network is de-pressurized every time, which is a safety concern at whole
complex.

2- Projects Scope of work as per Process Package or MOC.

1:- Development of updated drawing.


2:- Procurement of materail and execution od scope.
3:- Update PSi package

3- Proposal:-

Mechanical package has been prepared as per recommendations of process package. New safety shower network is
designed in parallel to existing with isolation valves so that it can be hand over any time for maintenince without de-
pressurized the complete network. Underground piping material is same as existing HDPE (DADEX). Existing problimatic
HDPE line is not removed. Existing Isometrics & underground system diagram are updated for installation of new
valves. New HDPE piping to be welded (Butt fusion type) as per OEM chart and hydrotesting & other inspections to be
performed as per attached ITP. Following documents are attached with the package.
1- New isometrc Drawing
2- Underground system diagram
3- ITP
4- Process package

4- Recommendations / Job scope of mechanical package:-

1- Maintenance to execute the job as per drawings attached


2- QC to perform inspections as per ITP
ULATION

e at safety showers

nce commisioning of
machine/technique
eakages and frequent
y concern at whole

shower network is
tenince without de-
X). Existing problimatic
tallation of new
her inspections to be