Chapter 14 Questions
B.
C. The latest week that the components of the order can be started and the order still
be ready to ship on time is week 2. This is because the maximum lead time in each of
the two levels is 3 weeks.
A.
B. I did this based on the highest lead times for each level.
200
200
200
7 8
200
20
180
180
7 8
7 8
7 8
7 8
7 8
7 8
7 8
200
40
160
160
7 8
7 8
Extra
Period When Periods Cumulative
Inventory
Lot Size Part-Periods
Order Is
Carried Carried Part-Periods
Placed × =
2 80 0 1 0 0
3 90 10 2 20 20
4 120 30 3 90 110
6 30 30 1 30 30
8 60 30 3 90 120
Both of these part periods is not close to the EPP but since a lot size of 110 is closer
than 120, we will pick this. So 120 units should be ordered to cover the first 4
periods.
Demand Cumulative
Month
(units)
1 —
2 80 80
3 10 90
4 30
120
5 —
6 30
7 —
8 30
A. Hours/
Standard Time: unit Capacity FABRICATION A
Product A 2 7
Production Schedule:
Week Mon. Tues. Wed
Quantity 2 4 1
Product A 4 57% 8 114% 2 29%
Hours/
Standard Time: unit Capacity ASSEMBLY A
Product A 1.5 7
Production Schedule:
Week Mon. Tues. Wed
Quantity 2 4 1
Product A 3 43% 6 86% 1.5 21%
Hours/
Standard Time: unit Capacity PACKAGING A
Product A 1 7
Production Schedule:
Week Mon. Tues. Wed
Quantity 2 4 1
Product A 2 29% 4 57% 1 14%
B. It looks like each day is feasible with the exception of Fabrication of Product A
on Tuesday. More can be made on Monday instead.
Hours/
Standard Time: unit Capacity FABRICATION B
Product A 1 7
Production Schedule:
Week Mon. Tues. Wed
Quantity 3 2 2
Product A 3 43% 2 29% 2 29%
Hours/
Standard Time: unit Capacity ASSEMBLY B
Product A 1 7
Production Schedule:
Week Mon. Tues. Wed
Quantity 3 2 2
Product A 3 43% 2 29% 2 29%
Hours/
Standard Time: unit Capacity PACKAGING B
Product A 1.5 7
Production Schedule:
Week Mon. Tues. Wed
Quantity 3 2 2
Product A 4.5 64% 3 43% 3 43%
ITEM Tractor Trailer LT=1 week Beg. 1 2 3 4
Gross requirements
Scheduled receipts
Projected on-hand
Net requirements
Planned-order receipts
Planned-order releases
A. The manager should order 364800 wheels because 360000/6400=56.24 rounded up to 57 and then 57*6400=364800.
B. In Week 3
C. He will have 4800(364800-360000) wheels left over.
5 6 7 8 9
20000
20000
20000
10000 10000
5 6 7 8 9
20000
20000
20000
20000
5 6 7 8 9
20000
20000
20000
20000
5 6 7 8 9
360000
364800