2.0 EQUIPMENT
2.1 `Magnaflux' make Electromagnetic yoke model Y7 or equivalent meeting the
requirements of para 2.2,2.3 and 2.4 shall be used.
2.2 Electro Magnetic Yoke in AC mode shall be able to lift a Ferromagnetic block having
minimum weight of 4.5 Kg at the maximum pole spacing to be used. The block shall
be duly identified with weight measured and recorded.
2.3 The block shall be lifted in such a way that its center of gravity falls in the center of the
pole spacing. The pole spacing shall be maximum, with the full surface of the legs in
contact with the plate. Yoke is acceptable, if the Ferromagnetic block is lifted freely
against gravitational force.
2.4 Yoke shall be calibrated once in every year or earlier if malfunction or damage is
suspected.
The concentration of the bath shall be checked prior to use every day or every 8
hours.
4.0 SURFACE PREPARATION :
4.1 Surface may be in the as weld, as Ground , as Machined condition. However surface
preparation by grinding or other suitable means may be necessary in case of doubt
to resolve the actual indication. Surface to be examined and all adjacent areas within
atleast 25 mm, shall be dry and free of all coatings,paints, all dirt, grease, lint, scale,
welding flux and spatter, oil or other extraneous matter that could interfere with the
examination.
9.0 DEMAGNETISATION :
9.1 This is generally not required to be done. If required the testing personnel shall get a
separate procedure for demagnetisation.
Thermax Limited (B & H Group) – Unit-II
A Division of Thermax Limited
QUALITY ASSURANCE & CONTROL PROCEDURES
EXHIBIT-1 :
14
THERMAX LIMITED MAGNETIC PARTICLE TESTING Page : 1
BOILER & HEATER GROUP
+-------------------------------------------------------------------------------------------------------
| NDE REPORT Report No : Date :
|-------------------------------------------------------------------------------------------------------| Location : | Material form : |
Procedure No :
| Project : | | Item : | Boiler No : |
Mfg Process : |
| Drawing No : | Surface : | Inspecting Authority:
| Design Code: | Stage : | Extent of Testing :
|------------------------------------------------------------------------------------------------------
|Part No |Description | Size | Qty | Recordable Indications- Location/Length/Width/Type | Result
| | | | | |
|---------+------------------------------+------------------------------+--------+---------------------| | | | |
| | | | | | | | | | | |
| | | | | |
|------------------------------------------------------------------------------------------------------
| Remarks :
|
| Indentor: Date: VI Cleared by : Date:
|------------------------------------------------------------------------------------------------------
| Test Method : Lighting Equipment:
|------------------------------------------------------------------------------------------------------
| Equipment : | Medium Form : | Demagnetisation :
| Direction : | Suspension : | Temperature
| Technique : | Concentration : | Job :
| Current : | Medium :
| Contrast : | Colour : | Viewing :
|------------------------------------------------------------------------------------------------------
|
| TEST PERFORMED :LEVEL- Name : Sign : Date & Time :
|
| EVALUATION BY : LEVEL- Name : Sign : Date & Time :
|
| APPROVED BY : LEVEL - Name : Sign : Date :
|
| INSPECTING AUTHORITY : Sign : Date :
-------------------------------------------------------------------------------------------------------