ALL INTERNAL ROADSIDE DRAIN, SUMP, DRAIN LINES & CONNECTIONS TO
PUBLIC DRAINS SHALL BE COORDINATED WITH C&S ENGR'S DRAWINGS/SPECS
BY MAINCON.
NOTES:
MA-A PR-B.1 CONNECTION TO STORM DRAIN SUMP. CONTRACTOR TO PROVIDE SAMPLE FOR
APPROVAL.
10. ALL INVERT LEVELS TO BE VERIFIED BY ENGINEER AND CONTRACTOR ON SITE.
11. ALL DRAINS PER ARCHITECT'S/ENGINEER'S DRAWINGS AND SPECIFICATIONS.
12. ANY CHANGE IN LEVELS IN ARCHITECT'S DRAWINGS TAKE PRECEDENT OVER
THIS DRAWING. CONTRACTOR TO ADJUST ACCORDINGLY AND TO NOTIFY THE
MA-B PR-C.1
JALAN
PR-D
MAR
TAPURA
MA-C
PR-D.1
THAMRIN NINE
DEVELOPMENT
DALAM
JAKARTA, INDONESIA
PR-E
MA-D
PR-E.1
PR-F
MA-E PR-G
T1-A PT. PUTRAGAYA
WAHANA
T1-A1
MA-F
40TH FLOOR UOB PLAZA
JALAN MH. THAMRIN NO.10
JAKARTA 10230
T1-B INDONESIA
MA-G
MA-J
T1-D
MA-K
T1-E
DRAWING TITLE
OVERALL SITE
DRAINAGE PLAN
MA-M (PHASE - 01)
T1-G
DESIGNED BY JA
DRAWN BY IS / NZ
(PHASE 01)
MA-9 MA-8 MA-7 MA-6 MA-5 MA-4 MA-3 MA-2 MA-1 MA-1A T1-1 T1-2 T1-3 T1-4 T1-5 T1-6 T1-7 T1-8 T1-9 T1-10 T1-11 T1-12 T1-13 N