LEGEND:(DRAINAGE BY WIRATMAN)

NOTE:
ALL INTERNAL ROADSIDE DRAIN, SUMP, DRAIN LINES & CONNECTIONS TO
PUBLIC DRAINS SHALL BE COORDINATED WITH C&S ENGR'S DRAWINGS/SPECS
BY MAINCON.

NOTES:

1) DRAINAGE MATERIAL & SPECIFICATION TO STRUCTURAL ENGINEER


SPEC AND TO CONTRACTOR FURTHER SUBMISSION. PLANNING
2) DRAINAGE MATERIAL INSTALLATION BY CONTRACTOR AND TO BE
CIVIL ENGINEERING
CONNECTED TO THE MAIN DRAINAGE SYSTEM OR TO THE NEAREST LANDSCAPE ARCHITECTURE
DRAIN OUTLET. (TO REFER TO MEP DETAIL DWG & SPEC.) ENVIRONMENTAL CONSULTING
No. 108 Pasir Panjang Road
3) THE PROPOSED DRAINAGE NETWORKS ON THIS PLAN IS ONLY
#03-10/11 Golden Agri Plaza
INDICATIVE, & TO M/E / SITE ENGINEER FURTHER DETAIL PROPOSAL
Singapore 118535
& SPECS SUBJECT TO THE ACTUAL SITE CONDITION/ INSTALLATION
t: 65 6223 8133 f: 65 6509 8896
AT SITE. singapore@beltcollins.com.sg
www.beltcollins.com
4) NUMBERS OF WEEP HOLE SHOWN ON PLAN IS INDICATIVE ONLY KEYPLAN
NOTES
1. BASE INFORMATION TAKEN FROM ARCHITECT'S MASTERPLAN
2. CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON THE GROUND AND
REPORT ANY DISCREPANCIES TO BE HIGHLIGHTED TO THE LANDSCAPE
ARCHITECT FOR DECISION.
3. ALL EXISTING TREES TO REMAIN SHALL BE SUITABLY PROTECTED DURING
CONSTRUCTION.
4. NO MATERIAL SHALL BE STORED WITHIN DRIPLINE OF EXISTING TREES.
5. REFER TO ARCHITECT'S DRAWING FOR LAYOUT OF ROADWAYS, BUILDINGS,
BOUNDARY WALL AND FIRE ENGINE ACCESS DRIVEWAY.
6. MAX. BANK SLOPE SHALL BE 1:3 WITH SMOOTH MOWABLE TRANSITION AT TOP

PR-B AND BOTTOM UNLESS OTHERWISE SPECIFIED.


7. ALL SUBSOIL DRAIN PIPES TO BE UPVC PERFORATED PIPE COMPLETE WITH FILTER
FABRIC TO ENGINEER'S DRAWINGS AND SPECIFICATIONS.
CONTRACTOR TO PROVIDE SAMPLE FOR APPROVAL.
8. REFER TO ARCHITECT'S AND ENGINEER'S DRAWINGS FOR LOCATION OF DRAIN
LINES, SUMP CONDUIT PIPES AND OTHER PROPOSED UTILITIES. LOCATION OF
DRAINS AND SUMPS ARE SHOWN FOR COORDINATION ONLY.
9. REFER TO ENGINEER'S DRAWINGS FOR DETAIL OF SURFACE DRAIN AND

MA-A PR-B.1 CONNECTION TO STORM DRAIN SUMP. CONTRACTOR TO PROVIDE SAMPLE FOR
APPROVAL.
10. ALL INVERT LEVELS TO BE VERIFIED BY ENGINEER AND CONTRACTOR ON SITE.
11. ALL DRAINS PER ARCHITECT'S/ENGINEER'S DRAWINGS AND SPECIFICATIONS.
12. ANY CHANGE IN LEVELS IN ARCHITECT'S DRAWINGS TAKE PRECEDENT OVER
THIS DRAWING. CONTRACTOR TO ADJUST ACCORDINGLY AND TO NOTIFY THE

PR-C LANDSCAPE ARCHITECT.

MA-B PR-C.1
JALAN

PR-D
MAR
TAPURA

MA-C
PR-D.1
THAMRIN NINE
DEVELOPMENT
DALAM

JAKARTA, INDONESIA
PR-E
MA-D
PR-E.1
PR-F

MA-E PR-G
T1-A PT. PUTRAGAYA
WAHANA
T1-A1

MA-F
40TH FLOOR UOB PLAZA
JALAN MH. THAMRIN NO.10
JAKARTA 10230
T1-B INDONESIA

MA-G

1 HWD ISSUED (Partial) 14 DEC 2016

T1-C 2 HWD ISSUED (Partial) 17 FEB 2017


MA-H
3 REVISED

MA-J
T1-D

MA-K

T1-E

MA-L ONLY FIGURED DIMENSIONS ARE TO BE WORKED FROM.


CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. DISCREPANCIES
MUST BE REPORTED TO THE LANDSCAPE ARCHITECT BEFORE
T1-F PROCEEDING.THIS DRAWING IS COPYRIGHT.

DRAWING TITLE

OVERALL SITE
DRAINAGE PLAN
MA-M (PHASE - 01)
T1-G

PROJECT NO. #202.22

DESIGNED BY JA

DRAWN BY IS / NZ

JALAN 1 ARAH, 3 LAJUR SCALE 1 : 300 @ A1


JL. KOTABUMI JALAN KOTA BUMI
DATE MAY 2015

(PHASE 01)
MA-9 MA-8 MA-7 MA-6 MA-5 MA-4 MA-3 MA-2 MA-1 MA-1A T1-1 T1-2 T1-3 T1-4 T1-5 T1-6 T1-7 T1-8 T1-9 T1-10 T1-11 T1-12 T1-13 N

GENERAL NOTE: DRAWING NO.

SEE GENERAL NOTES & CONTRACTUAL REQUIREMENTS (GNCR) LEX-100-3


FOR DESIGN BRIEF & SUPPLEMENTARY TO ARCHITECT'S SPECIFICATIONS THIS DRAWING IS COPYRIGHT